ANSAL TOWN AGRA PHASE-III

UPRERARegistered

ANSAL TOWN AGRA PHASE-III is a RERA-registered residential project by Ansal Housing Limited in Agra (RERA ID UPRERAPRJ3753). Registered with a completion deadline of 29 Jun 2021. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ3753
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAgra Development Authority
Proposed start4 Apr 2016
Original start4 Apr 2016
Project duration63 months
AddressAgra, Agra
TehsilAgra
Applicant typeCompany
Applicant address606, 6th Floor Indraprakash, 21 Barakhamba Road, New Delhi 110001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    1167/BFT/12/05-06

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered11 Aug 2017
Original completion31 Dec 2019
Revised completion29 Jun 2021
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹5,49,000
Sanctioning authorityAgra Development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
NEERAJ KOCHER
License CA/94/17709
B-330, GAUR GREEN AVENU, PLOT 1 & 2 , ABHAY KHAND 2, INDIARAPURAM, GHAZIABAD, 201010
Engineer
N/A
N/A
Sr.Development work declared to RERA
1Demarcation of Plots
Done
2Boundary Wall
NA
3Road Work
Black Top Road
4Footpaths
Paver/Stone Footpath in selected parks
5Water Supply Including Drinking Water Facilities
MDPE/HDPE water supply system, drinking water facility will be provided by nagar nigam
6Sewer System
RCC Hume Pipe
7Drain
Under ground drainage network
8Parks
As per approved layout
9Tree Planting
As per approved landscape plan
10Design For Electric Supply Including Street Lighting
As per approved electrical plan
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
STP
13Solid Waste Management And Disposal System
Wil be done by Nagar Nigam
14Water Conservation System
RWH as per approved layout
15Energy Management System Including Use of Renewable Energy
Use of LED Street Lights for energy management
16Fire Protection And Fire Safety System
NA
17Social Infrastructure And Other Public Amenities Including Public Health Services
Nursery School/Vendor Zone/EWS as per approved layout
18Emergency Evacuation Services
NA
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

1 agent

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1star estateUPRERAAGT10202
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 22 Mar 2021.

Sanctioned by Agra Development Authority · 1,08,771 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoRevised endDocuments filed
1167/BFT/12/05-0631 Mar 201622 Mar 202131 Dec 2019
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 29 Jun 2021.

#Granted fromExtended uptoNote
131 Dec 201930 Dec 2020—
230 Dec 202029 Jun 2021Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

67 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
412.2255 Hectare—
412.2255 Hectare—
413.2000 Hectare—
413,717.1770 Hectare—
415.2104 Hectare—
416.2000 Hectare—
416.2000 Hectare—
416.1970 Hectare—
418.1960 Hectare—
419.1764 Hectare—
687.2100 Hectare—
687.2100 Hectare—
687.2000 Hectare—
690.1650 Hectare—
691.6915 Hectare—
692.2200 Hectare—
692,693.2090 Hectare—
693.2200 Hectare—
694.2555 Hectare—
694.2555 Hectare—
711,712,713,732.1476 Hectare—
711,712,713,732.1476 Hectare—
711,712,713,732.1476 Hectare—
715.2109 Hectare—
716.256 Hectare—
717.2000 Hectare—
721.1887 Hectare—
721.1887 Hectare—
731,728,167,725.2156 Hectare—
731,728,167,725.2156 Hectare—
731,728,167,725.2158 Hectare—
726.2405 Hectare—
729.2298 Hectare—
729.2297 Hectare—
732.2567 Hectare—
737.1415 Hectare—
739.2082 Hectare—
739,736,734.2082 Hectare—
770.2000 Hectare—
770.2000 Hectare—
770.2000 Hectare—
770.2000 Hectare—
770.2000 Hectare—
770.2000 Hectare—
770.2000 Hectare—
770.2128 Hectare—
770.1728 Hectare—
770.1728 Hectare—
770.1728 Hectare—
770.1728 Hectare—
412,413,414,415,416,418,419,687,690,691,692,693,69118490Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

50 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 19 Jul 2008.

Registry no.DateTypeArea
41318 Jan 2010self—
66227 Jan 2010self—
66327 Jan 2010self—
166524 Feb 2010self—
58622 Jan 2010self—
58722 Jan 2010self—
62223 Jan 2010self—
41418 Jan 2010self—
312722 May 2009self—
908022 Sept 2011self—
908122 Sept 2011self—
908222 Sept 2011self—
573722 Sept 2011self—
573723 May 2014self—
1358426 Nov 2013self—
18451 Mar 2011self—
18431 Mar 2011self—
18441 Mar 2011self—
908322 Sept 2011self—
908422 Sept 2011self—
312522 May 2009self—
312822 May 2009self—
312922 May 2009self—
166424 Feb 2010self—
492319 Jul 2008self—
62123 Jan 2010self—
312622 May 2009self—
312422 May 2009self—
689023 Oct 2009self—
689123 Oct 2009self—
689223 Oct 2009self—
671815 Oct 2009self—
611715 Oct 2009self—
671915 Oct 2009self—
220114 Mar 2011self—
492419 Jul 2008self—
175625 Feb 2010self—
175725 Feb 2010self—
68784 Oct 2008self—
68794 Oct 2008self—
68814 Oct 2008self—
68804 Oct 2008self—
68824 Oct 2008self—
68834 Oct 2008self—
68844 Oct 2008self—
68854 Oct 2008self—
906128 Dec 2008self—
906228 Dec 2008self—
906328 Dec 2008self—
906428 Dec 2008self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 2893
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 621
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1664
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1756
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1756
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1757
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1843
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1844
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1845
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 2201
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3124
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3125
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3126
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3128
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3129
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4923
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4924
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 5737
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6718
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6719
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6878
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6879
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6880
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6881
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6882
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6883
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6884
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6885
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6890
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6891
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6892
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9061
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9062
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9063
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9064
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9080
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9081
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9083
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9084
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 622
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3127
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9082
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 414
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 662
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 413
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 663
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 586
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 586
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 13584
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New26 Jun 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New22 May 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New22 May 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New25 May 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New22 May 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New22 May 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New25 Jun 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New22 May 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New26 Jun 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New26 Jun 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New25 Jun 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
Old28 Jul 2017 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
Old28 Jul 2017 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old28 Jul 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterdrinking water facilities has been provided
Fire safety (as filed with RERA)fire fighting facilities has been provided
Health servicesewarage disposal facilities has been provided

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

5 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

5 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q1.

QuarterConstructionCertificates
2020-Q1—Eng ↗
2020-Q2—Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—Eng ↗
2021-Q1—Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameAnsal Housing Limited
RolePromoter · current
RERA IDUPRERAPRM450
PANAAACA0377R
CIN / TANDELA12078D
Name of chairmanDeepak Ansal
Registered address606, 6th Floor Indraprakash, 21 Barakhamba Road, New Delhi 110001
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Agra

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Ansal Housing & Construction Ltd. Ansal Town Agra Phase-III RERA Project Escrow A/CBankHDFC BANK LTD.BranchHDFC K.G. MargA/C no.IFSCHDFC0000003
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.

Common questions about ANSAL TOWN AGRA PHASE-III

Is ANSAL TOWN AGRA PHASE-III RERA registered?

Yes. ANSAL TOWN AGRA PHASE-III is registered with UPRERA under registration number UPRERAPRJ3753, registered on 11 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for ANSAL TOWN AGRA PHASE-III?

The completion date filed with UPRERA is 29 Jun 2021. No completion certificate is on record yet.

Who is the builder of ANSAL TOWN AGRA PHASE-III?

Ansal Housing Limited is the promoter entity that filed ANSAL TOWN AGRA PHASE-III with UPRERA (promoter RERA ID UPRERAPRM450). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does ANSAL TOWN AGRA PHASE-III show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted ANSAL TOWN AGRA PHASE-III more time to complete?

UPRERA's record carries 2 completion extensions for ANSAL TOWN AGRA PHASE-III, the latest running to 29 Jun 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does ANSAL TOWN AGRA PHASE-III have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is ANSAL TOWN AGRA PHASE-III located?

ANSAL TOWN AGRA PHASE-III is registered in Agra, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗