APPLE7, TOWER S2A, S2B

UPRERARegistered

APPLE7, TOWER S2A, S2B is a RERA-registered residential project by ASGI PROPERTIES PVT LTD in Ghaziabad (RERA ID UPRERAPRJ8494). Registered with a completion deadline of 30 Apr 2024.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ8494
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start22 Nov 2014
Original start22 Nov 2014
Project duration114 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant addressANSAL API, SUSHANT AQUAPOLIS DOONDAHERA GHAZIABAD - UP - 201016
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    57/ZONE-5/2013-14

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. to

    Extension granted

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered9 Aug 2017
Original completion22 May 2018
Revised completion30 Apr 2024
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹91,500
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors180 · 2 · 14 (units from plan)
  • 2 BHK72 40%
  • 3 BHK60 33%
  • 1 BHK26 14%
  • OTHER22 12%
ConfigurationUnitsCarpet area
OTHER2249-137
1 BHK2631-39
2 BHK72118-130
3 BHK6073-92
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
S2A · OTHER, 1 BHK, 2 BHK149731-137
S2B · OTHER, 1 BHK, 3 BHK148339-92
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
RUDRABHISHEKH ENTERPRISES PVT.LTD
License CA/2008/43324
820, ANTARIKASH BHAWAN , KASTURBA GANDHI MARG,110001
Engineer
RUDRABHISHEKH ENTERPRISES PVT.LTD
820, ANTARIKASH BHAWAN , KASTURBA GANDHI MARG,110001
Contractor
MAHI BUILDHOME PVT.LTD
27-FF, KADAMBA SHOPPING COMPLEX, GAMMA I, GRATER NOIDA
Sr.Development work declared to RERA
1Demarcation of Plots
IS UNDER PROGRESS THROUGH ANSAL URBAN CONDOMINIUMS PVT.LTD
2Boundary Wall
IS UNDER PROGRESS THROUGH ANSAL URBAN CONDOMINIUMS PVT.LTD
3Road Work
IS UNDER PROGRESS THROUGH ANSAL URBAN CONDOMINIUMS PVT.LTD
4Footpaths
IS UNDER PROGRESS THROUGH ANSAL URBAN CONDOMINIUMS PVT.LTD
5Water Supply Including Drinking Water Facilities
IS UNDER PROGRESS
6Sewer System
IS UNDER PROGRESS THROUGH ANSAL URBAN CONDOMINIUMS PVT.LTD
7Drain
IS UNDER PROGRESS THROUGH ANSAL URBAN CONDOMINIUMS PVT.LTD
8Parks
IS UNDER PROGRESS THROUGH ANSAL URBAN CONDOMINIUMS PVT.LTD
9Tree Planting
IS UNDER PROGRESS THROUGH ANSAL URBAN CONDOMINIUMS PVT.LTD
10Design For Electric Supply Including Street Lighting
IS UNDER PROGRESS THROUGH ANSAL URBAN CONDOMINIUMS PVT.LTD
11Community Buildings
IS UNDER PROGRESS THROUGH ANSAL URBAN CONDOMINIUMS PVT.LTD
12Treatment and Disposal System of Sewage and Sullage water
IS UNDER PROGRESS THROUGH ANSAL URBAN CONDOMINIUMS PVT.LTD
13Solid Waste Management And Disposal System
IS UNDER PROGRESS THROUGH ANSAL URBAN CONDOMINIUMS PVT.LTD
14Water Conservation System
IS UNDER PROGRESS THROUGH ANSAL URBAN CONDOMINIUMS PVT.LTD
15Energy Management System Including Use of Renewable Energy
IS UNDER PROGRESS THROUGH ANSAL URBAN CONDOMINIUMS PVT.LTD
16Fire Protection And Fire Safety System
IS UNDER PROGRESS THROUGH ANSAL URBAN CONDOMINIUMS PVT.LTD
17Social Infrastructure And Other Public Amenities Including Public Health Services
IS UNDER PROGRESS THROUGH ANSAL URBAN CONDOMINIUMS PVT.LTD
18Emergency Evacuation Services
IS UNDER PROGRESS THROUGH ANSAL URBAN CONDOMINIUMS PVT.LTD
19Other Miscellaneous Work
IS UNDER PROGRESS THROUGH ANSAL URBAN CONDOMINIUMS PVT.LTD
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 22 Nov 2019.

Sanctioned by Ghaziabad Development Authority · 17,216 sqm of land · an approved plan of 2 blocks and 180 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
57/ZONE-5/2013-1422 Nov 201422 Nov 201922 Nov 201922 May 2018
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 30 Apr 2024.

#Granted fromExtended uptoNote
122 May 201830 Sept 2022—
230 Sept 202230 Apr 2024—

Land & documents

13 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 934
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1150
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1158
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 5130
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 5189
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 5189
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New15 Sept 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New15 Sept 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New15 Sept 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New15 Sept 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New15 Sept 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New15 Sept 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New15 Sept 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New15 Sept 2018 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterB/D
Fire safety (as filed with RERA)B/D
Health serviceB/D
Renewable energyB/D
Other facilitiesB/D

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameASGI PROPERTIES PVT LTD
RolePromoter · current
RERA IDUPRERAPRM7759
PANAALCA0540R
CIN / TANU45400DL2012PTC244299
Name of chairmanACHAL KUMAR GUPTA
Registered addressANSAL API, SUSHANT AQUAPOLIS DOONDAHERA GHAZIABAD - UP - 201016
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
ASGI PROPERTIES PVT.LTD.BankSTATE BANK OF INDIABranchCROSSING REPUBLIK, GHAZIABADA/C no.IFSCSBIN0015467
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

3 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)64 (Under Registration - 7 ) → 67 (Under Registration - 6 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)63 (Under Registration - 6 ) → 64 (Under Registration - 7 )
changed in Estanzo’s record
31 Aug 2026
Promoter’s complaints tally (all their projects)62 (Under Registration - 5 ) → 63 (Under Registration - 6 )
changed in Estanzo’s record
16 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 25 Sept 2026 · 3 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No khasra or plot detail is published for this project.Ask which khasra numbers the project stands on, so the plot can be matched against the deed and the revenue record.
  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.

Common questions about APPLE7, TOWER S2A, S2B

Is APPLE7, TOWER S2A, S2B RERA registered?

Yes. APPLE7, TOWER S2A, S2B is registered with UPRERA under registration number UPRERAPRJ8494, registered on 9 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for APPLE7, TOWER S2A, S2B?

The completion date filed with UPRERA is 30 Apr 2024. No completion certificate is on record yet.

Who is the builder of APPLE7, TOWER S2A, S2B?

ASGI PROPERTIES PVT LTD is the promoter entity that filed APPLE7, TOWER S2A, S2B with UPRERA (promoter RERA ID UPRERAPRM7759). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted APPLE7, TOWER S2A, S2B more time to complete?

UPRERA's record carries 2 completion extensions for APPLE7, TOWER S2A, S2B, the latest running to 30 Apr 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does APPLE7, TOWER S2A, S2B have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is APPLE7, TOWER S2A, S2B located?

APPLE7, TOWER S2A, S2B is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in APPLE7, TOWER S2A, S2B?

The unit plan filed with UPRERA lists OTHER, 1 BHK, 2 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in APPLE7, TOWER S2A, S2B?

The approved unit plan filed with UPRERA runs from 31 to 137 m² of carpet area (about 336 to 1,477 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in APPLE7, TOWER S2A, S2B?

The approved unit plan describes 2 blocks and 180 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is APPLE7, TOWER S2A, S2B?

About 42 units per acre: 180 planned units across 4.25 acres (17,216 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗