Aradhana Enclave is a RERA-registered residential project by Chandak Builders & Developers P Ltd. in Kanpur Nagar (RERA ID UPRERAPRJ305809). Registered with a completion deadline of 13 Jan 2023.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ305809 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Kanpur Development Authority |
| Proposed start | 14 Jan 2022 |
| Project duration | 12 months |
| Address | Kanpur, Kanpur Nagar |
| Tehsil | Kanpur |
| Applicant type | Company |
| Applicant address | 603, City Centre 63/2, The Mall, Kanpur - 208001 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
Plotted Resi Development/ Plotted Housing/ 00460/KDA/LDPL/20-21/0763/22012021
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 12 Sept 2022 |
| Original completion | 13 Jan 2023 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 16 Mar 2023 |
| Registration fee | ₹17,500 |
| Sanctioning authority | Kanpur Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots We have one plot of size 2451.96 sq. mtr. having 1 main entrance gate from the 60 m wide front road and one back side gate |
| 2 | Boundary Wall 2 m high and 230 mm thick Brick work and rcc work in column and beam. At the center face of boundary wall there would be a Logo of the project which give a beautiful iconic design to boundary wall. |
| 3 | Road Work From the main entrance gate we have 80 mm thick interlocking brick /RCC road through out the project. Whose wideness starts from 10 mtr. |
| 4 | Footpaths We would not provide any footpath |
| 5 | Water Supply Including Drinking Water Facilities N/A |
| 6 | Sewer System Sewer Pipe line have been laid. The line shall be connected with the Municipal sewerage system. |
| 7 | Drain N/A |
| 8 | Parks N/A |
| 9 | Tree Planting Tree Plantation will be done. |
| 10 | Design For Electric Supply Including Street Lighting Street Light poles will be placed. |
| 11 | Community Buildings N/A |
| 12 | Treatment and Disposal System of Sewage and Sullage water Sewer Pipe line have been laid. The line shall be connected with the Municipal sewerage system. |
| 13 | Solid Waste Management And Disposal System N/A |
| 14 | Water Conservation System We will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level. |
| 15 | Energy Management System Including Use of Renewable Energy N/A |
| 16 | Fire Protection And Fire Safety System N/A |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services N/A |
| 18 | Emergency Evacuation Services N/A |
| 19 | Other Miscellaneous Work N/A |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 28 Dec 2026.
Sanctioned by Kanpur Development Authority · 2,418 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| Plotted Resi Development/ Plotted Housing/ 00460/KDA/LDPL/20-21/0763/22012021 | 29 Dec 2021 | 28 Dec 2026 | 28 Dec 2029 | 13 Jan 2023 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
15 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| Plot No RP/125, Arazi no. 870 Mi | Arazi No. Mi 870 | Khasra |
| Sale deed · Bahi No. 1, Jild No. 24684 Page No. 1 - 32 Serial No. 18627 The registered deed by which the promoter bought the land. | PDF ↗ |
| Khatauni extract · 1429-1434 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Reply to observation letter An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Undertaking by promoter An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · MOU from landowners An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 25 Jun 2022 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 25 Jun 2022 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 25 Jun 2022 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 25 Jun 2022 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 28 Jul 2022 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 25 Jun 2022 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 25 Jun 2022 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 13 Jul 2022 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 25 Jun 2022 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 13 Jul 2022 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 13 Jul 2022 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 12 Jul 2022 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 25 Jun 2022 ↗ |
Quarterly progress reports
5 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
5 quarterly progress reports are on file with UPRERA, covering 2021-Q4 to 2022-Q4.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Chandak Builders & Developers P Ltd. |
| Role | Promoter · current |
| RERA ID | UPRERAPRM21910 |
| PAN | AAACF2161L |
| CIN / TAN | U45201UP1993PTC015232 |
| Name of chairman | Kamal Chandak |
| Registered address | 603, City Centre 63/2, The Mall, Kanpur - 208001 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Kanpur Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Chandak BDP ARADHANA ENCLAVE MST COLL A/cBankHDFC BankBranchCivil LinesBranch address15/63, Krishna Tower, Civil Lines, KanpurBranch districtKanpur Nagar, Uttar PradeshA/C no.IFSCHDFC0000127 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Chandak BDP ARADHANA ENCLAVE RERA A/cBankHDFC BankBranchCivil LinesBranch address15/63, Krishna Tower, Civil Lines, KanpurBranch districtKanpur Nagar, Uttar PradeshA/C no.IFSCHDFC0000127 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Chandak BDP ARADHANA ENCLAVE TRAN A/cBankHDFC BankBranchCivil LinesBranch address15/63, Krishna Tower, Civil Lines, KanpurBranch districtKanpur Nagar, Uttar PradeshA/C no.IFSCHDFC0000127 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Aradhana Enclave
Is Aradhana Enclave RERA registered?
Yes. Aradhana Enclave is registered with UPRERA under registration number UPRERAPRJ305809, registered on 12 Sept 2022. Estanzo reproduces that filing; it does not verify the work behind it.
Has Aradhana Enclave been completed?
UPRERA still lists Aradhana Enclave as Registered, so it is not shown as completed here. A completion certificate dated 16 Mar 2023 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Aradhana Enclave?
Chandak Builders & Developers P Ltd. is the promoter entity that filed Aradhana Enclave with UPRERA (promoter RERA ID UPRERAPRM21910). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Aradhana Enclave have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Aradhana Enclave located?
Aradhana Enclave is registered in Kanpur Nagar, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗