AWADHPURAM

UPRERAAbeyance

AWADHPURAM is a RERA-registered residential project by HYADES INFRA PROJECTS PRIVATE LIMITED in Lucknow (RERA ID UPRERAPRJ13654). RERA status: Abeyance.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Abeyance.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ13654
Project categoryResidential
Registration typeNew
RERA statusAbeyanceAbeyance“Held in suspension.” UP-RERA lists projects whose registration it has placed in abeyance.Read the full entry in the glossary
Proposed start8 May 2017
Project duration67 months
AddressBakshi Ka Talab**, Lucknow
TehsilBakshi Ka Talab**
Applicant typeCompany
Applicant address15/108, SECTOR 15, INDIRA NAGAR, LUCKNOW-16
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Registered with RERA

  3. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Abeyance. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered18 Oct 2017
Original completion31 May 2022
Revised completion30 Nov 2022
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹49,500

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Salman Afaque
License CA/2014/65860
Lucknow
Engineer
NA
NA

Permits & extensions

0 permits

An approval and the date it runs to - not proof the work matching it was done.

8,802 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Plans and approvals filed with RERA
DocumentFile
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 30 Nov 2022.

#Granted fromExtended uptoNote
131 May 202230 Nov 2022Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

6 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
321GHA371—
287CHA557—
303KA5271—
287CHA557—
287CHA92—
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

4 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 8 May 2017.

Registry no.DateTypeArea
358631 Jul 2017self—
886022 Sept 2017self—
41458 May 2017self—
907526 Sept 2017self—
Document checklist
DocumentStatusUploaded
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old17 Oct 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking water24 hour water supply through tanks and pumps

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameHYADES INFRA PROJECTS PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM8537
PANAAECH0046G
CIN / TANU70103UP2016PTC087564
Name of chairmanMOHAMMAD ZAID
Registered address15/108, SECTOR 15, INDIRA NAGAR, LUCKNOW-16
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Hyades Infra Projects Private LimitedBankDCB BankBranchGomti nagarA/C no.IFSCDCBL0000108
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

4 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No sanctioning permit is published for this project.Ask which authority sanctioned the plans, for the permit number, and for the date it is valid to.
  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about AWADHPURAM

Is AWADHPURAM RERA registered?

Yes. AWADHPURAM is registered with UPRERA under registration number UPRERAPRJ13654, registered on 18 Oct 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for AWADHPURAM?

The completion date filed with UPRERA is 30 Nov 2022. No completion certificate is on record yet.

Who is the builder of AWADHPURAM?

HYADES INFRA PROJECTS PRIVATE LIMITED is the promoter entity that filed AWADHPURAM with UPRERA (promoter RERA ID UPRERAPRM8537). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted AWADHPURAM more time to complete?

UPRERA's record carries 1 completion extension for AWADHPURAM, the latest running to 30 Nov 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does AWADHPURAM have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is AWADHPURAM located?

AWADHPURAM is registered in Lucknow, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗