BHAWNA CITY PHASE 2 is a RERA-registered residential project by Bhawna Housing Private Limited in Agra (RERA ID UPRERAPRJ780042). Registered with a completion deadline of 26 Dec 2026.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ780042 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Agra Development Authority |
| Proposed start | 1 Feb 2022 |
| Project duration | 59 months |
| Address | Agra, Agra |
| Tehsil | Agra |
| Applicant type | Company |
| Applicant address | H.No. A321/22, Block A, IIIrd Floor, Vijay Vihar Phase-I, Rohini, Delhi , 110085 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
Plotted Resi Development/ Plotted Housing/01081/ADA/LD/20-21/1127/27032021
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion certificate filed
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 16 Mar 2022 |
| Original completion | 26 Dec 2026 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 17 Sept 2024 |
| Registration fee | ₹93,000 |
| Sanctioning authority | Agra Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots There are total of 122 plots in this project. The plots will be demarcated with latest measurement methods to the exact dimension and orientation as per the approved maps. |
| 2 | Boundary Wall A 6 to 8 feet high boundary wall will be constructed to ensure the privacy of the project. The boundary wall will be constructed in Brick-Mortar. The foundation of the boundary wall will be minimum 3 feet deep and will be designed to be earthquake resistant. The boundary wall will be plastered and Painted will all weather paint. |
| 3 | Road Work Roads will be constructed as per the approved dimensions and orientation maintaining the transverse and longitudinal slopes. The crust will comprise of the compacted Subgrade to the minimum depth of 300 mm. The Granular layers will be laid on top of it and compacted to the minimum of 95 percent compaction. The wearing course providing the smooth riding quality will be paved over it. |
| 4 | Footpaths The footpaths will be constructed at the periphery of the part and all desired/required locations using paver blocks. The four to six inches paver blocks with minimum strength of M-15 grade will be laid on the on the compacted bed with sand bed of minimum 40mm. |
| 5 | Water Supply Including Drinking Water Facilities This project is an extension of the existing project adjacent to this one by the name " Bhawna City" . Both these projects are to share the common facilities as per the approvals by Agra Development Authority. The Over head tank is part of other project that will cater for this project as well. The PVC underground pipe lines will be laid leading to all the units of the project. The connection will be made to the terrace tanks of the villas .The Potable ground water will be supplied to the OHT through submersible pump set |
| 6 | Sewer System Impermeable hume Pipes will be laid be laid to collect the domestic sewer. The pipes are laid at slopes to cater the smooth dispersal of the sewer to the sewage treatment plant. The man holes will be constructed at regular intervals and at change in slopes and direction of flow to maintain the efficiency of the sewer system |
| 7 | Drain Lined covered and open drains will be constructed to the minimum cross sectional dimension to cater for the waster water from the residential units and the rain water . The slopes of the the drains and the CD structures will be maintained to assist the rapid regress of the the drain water. |
| 8 | Parks In total there will be 5 parks in the entire project inclusive of both phases. 1 park is specific to this phase of project . The parks will be lush green maintaining the landscape . There will sitting arrangements for the elderly and playing areas for the kids |
| 9 | Tree Planting All season trees will be planted in the project along the park boundaries and project periphery. The tress selected are suitable to the soil ( Flaura and Fauna ) of the area. |
| 10 | Design For Electric Supply Including Street Lighting The entire project is in two phases, the electrical load sanctions are done by the Torrent power Limited and the transformers are installed. The electrical connect underground or over head will be lead to each unit and the connection will be provided through distribution boxes . The 4.5 m high street lights will be erected along the rad sections and the suitable common areas of the project. |
| 11 | Community Buildings Not Applicable |
| 12 | Treatment and Disposal System of Sewage and Sullage water Sewage treatment plant is common for both the phases of the project.. The state of the art multi treatment stage STP will be installed in the project to cater for the domestic sewer. The sewer will be treated to bring the effluents levels below the permissible levels of contamination if any and will then be removed as per Nagar-Nigam norms |
| 13 | Solid Waste Management And Disposal System The project will have designated dustbins located at the common areas . The arrangement for the cleaning and the collection of waste the waste from the project . A dalab ghar will also be constructed as per Approve map. |
| 14 | Water Conservation System Rain water harvesting systems will be installed in the projects having harvesting and percolation pits with multistage granular filters and maintenance chamber . The perforated pipes filled with sand will lead the catchment areas collected water post treatment to the water table recharging the same . |
| 15 | Energy Management System Including Use of Renewable Energy The solar panels will be installed to cater for all the common lighting requirements of the project. |
| 16 | Fire Protection And Fire Safety System Not Applicable |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Not Applicable |
| 18 | Emergency Evacuation Services Not Applicable |
| 19 | Other Miscellaneous Work All necessary works to necessary to the project |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 19 Dec 2026.
Sanctioned by Agra Development Authority · 17,571 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| Plotted Resi Development/ Plotted Housing/01081/ADA/LD/20-21/1127/27032021 | 20 Dec 2021 | 19 Dec 2026 | 18 Dec 2029 | 26 Dec 2026 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
Land & documents
30 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| Plot No. 3 Kh. No. 171(m) Mauja Mohhamadpur, Agra | 209.02 | Plot |
| Plot No. 2 Kh. No. 171(m) Mauja Mohhamadpur, Agra | 209.02 | Plot |
| Plot No. 5 Kh. No. 171(m) Mauja Mohhamadpur, Agra | 209.02 | Plot |
| Plot No. 4 Kh. No. 171(m) Mauja Mohhamadpur, Agra | 209.02 | Plot |
| Plot No. 1 Kh. No. 171(m) Mauja Mohhamadpur, Agra | 214.31 | Plot |
| Khata No. 91 Khasra No. 148 and 152/2 Mauja Mohhamadpur, Agra | 2672 | Khasra |
| Khata No. 91 Khasra No . 148 and 152/2 Mauja Mohhamadpur, Agra | 2672 | Khasra |
| Khata No. 91 Khasra No. 148 and 152/2 Mauja Mohhamadpur, Agra | 2672 | Khasra |
| Khata No. 91 Khasra No. 148 and 152/2 Mauja Mohhamadpur, Agra | 2672 | Khasra |
| Khata No. 91 Khasra No 148 and 152/2 , Mauja Mohhamadpu, Agra | 2672 | Khasra |
| Khata No. 104, Khasra No. 171(m), Mauja Mohhamadpur, Agra | 2879 | Khasra |
| Khata No. 104, Khasra No. 171(m), Mauja Mohhamadpur, Agra | 2879 | Khasra |
| Khasra No. 152/1 , Mauja Mohhamadpur, Agra | 17310 | Khasra |
| Registry document · 7279 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 7251 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 7233 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 7323 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 7368 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5591 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5698 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5768 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5794 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5665 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5416 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5458 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Allotment letter from the authority · No. 685, Sanyukt Awas Ayukt, Sanyukt Nibandhak Karyalay, U.P. Awas Vikas Parishad The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Registry document · 7682 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 7681 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1425-1430 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Land Description An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 14 Mar 2022 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 17 Feb 2022 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 17 Feb 2022 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 17 Feb 2022 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 19 Feb 2022 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 21 Feb 2022 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 21 Feb 2022 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 21 Feb 2022 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 21 Feb 2022 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 19 Feb 2022 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 19 Feb 2022 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 19 Feb 2022 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 14 Mar 2022 ↗ |
Quarterly progress reports
16 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
16 quarterly progress reports are on file with UPRERA, covering 2021-Q4 to 2025-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Bhawna Housing Private Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM124810 |
| PAN | AACCB5873D |
| CIN / TAN | AGRB11025A |
| Name of chairman | Bhagat Singh |
| Registered address | H.No. A321/22, Block A, IIIrd Floor, Vijay Vihar Phase-I, Rohini, Delhi , 110085 |
| RERA contact | |
| Registered since | 2020 |
Nearby projects
Agra
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Bhawna Housing Private Limited Collection Account for Bhawna City Phase 2BankICICI BankBranchAgra Mathura RoadBranch addressMayur Complex, Nagla Padi , Agra Mathura Road, Agra 282005Branch districtAgra, Uttar PradeshA/C no.IFSCICIC0001914 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Bhawna Housing Private Limited Separate Account for Bhawna City Phase 2BankICICI BankBranchAgra Mathura RoadBranch addressMayur Complex, Nagal Padi, Agra Mathura Road, Agra 282005Branch districtAgra, Uttar PradeshA/C no.IFSCICIC0001914 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Bhawna Housing Private Limited Transaction Account for Bhawna City Phase 2BankICICI BankBranchAgra Mathura RoadBranch addressMayur Complex, Nagla Padi, Agra Mathura Road, Agra 282005Branch districtAgra, Uttar PradeshA/C no.IFSCICIC0001914 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about BHAWNA CITY PHASE 2
Is BHAWNA CITY PHASE 2 RERA registered?
Yes. BHAWNA CITY PHASE 2 is registered with UPRERA under registration number UPRERAPRJ780042, registered on 16 Mar 2022. Estanzo reproduces that filing; it does not verify the work behind it.
Has BHAWNA CITY PHASE 2 been completed?
UPRERA still lists BHAWNA CITY PHASE 2 as Registered, so it is not shown as completed here. A completion certificate dated 17 Sept 2024 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of BHAWNA CITY PHASE 2?
Bhawna Housing Private Limited is the promoter entity that filed BHAWNA CITY PHASE 2 with UPRERA (promoter RERA ID UPRERAPRM124810). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does BHAWNA CITY PHASE 2 have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is BHAWNA CITY PHASE 2 located?
BHAWNA CITY PHASE 2 is registered in Agra, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗