BLOSSOM ZEST(PHASE -3 TOWER- SAT- 3,4,&7)

UPRERANCLT

BLOSSOM ZEST(PHASE -3 TOWER- SAT- 3,4,&7) is a RERA-registered residential project by LOGIX CITY DEVELOPERS PVT.LTD. in Gautam Budh Nagar (RERA ID UPRERAPRJ4870). RERA status: NCLT (since 17 Aug 2022).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: NCLT.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ4870
Project categoryResidential
Registration typeOngoing
RERA statusNCLTNCLTThe tribunal that hears company insolvency cases. UP-RERA lists projects whose promoter is before it.Read the full entry in the glossary
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start8 Jan 2014
Original start4 Oct 2011
Project duration102 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant address301-A, WORLD TRADE TOWER, BARAKHAMBA LANE, CONNAUGHT PLACE, NEW DELHI-110001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Building permit sanctioned

    NOIDA/CAP/2013/III-250/715

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  7. NCLT order

Published without a date
UPRERA lists this project as NCLT. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered3 Aug 2017
Original completion31 Dec 2021
Revised completion30 Jun 2022
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹87,000
Sanctioning authorityNoida Authority
NCLT order date17 Aug 2022

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors462 · 3 · 18 (units from plan)
ConfigurationUnitsCarpet area
STUDIO46287-179
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
TOWER- SAT- 3,4,& · STUDIO817487-179
TOWER- SAT- 3,4,&7 · STUDIO1128587-89
TOWER-SAT-3,4&7 · STUDIO13179
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Sr.Development work declared to RERA
1Demarcation of Plots
YES
2Boundary Wall
YES
3Road Work
YES
4Footpaths
YES
5Water Supply Including Drinking Water Facilities
YES
6Sewer System
YES
7Drain
YES
8Parks
YES
9Tree Planting
YES
10Design For Electric Supply Including Street Lighting
YES
11Community Buildings
YES
12Treatment and Disposal System of Sewage and Sullage water
YES
13Solid Waste Management And Disposal System
YES
14Water Conservation System
YES
15Energy Management System Including Use of Renewable Energy
No
16Fire Protection And Fire Safety System
YES
17Social Infrastructure And Other Public Amenities Including Public Health Services
YES
18Emergency Evacuation Services
YES
19Other Miscellaneous Work
NO
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 7 Jan 2019.

Sanctioned by Noida Authority · 16,316 sqm of land · an approved plan of 3 blocks and 462 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
NOIDA/CAP/2013/III-250/7158 Jan 20147 Jan 20197 Jan 202431 Dec 2021
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 30 Jun 2022.

#Granted fromExtended uptoNote
131 Dec 202130 Jun 2022Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

14 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 8 Jun 2011.

Registry no.DateTypeArea
49718 Jun 2011self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 2537
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New31 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New31 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New31 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New31 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New31 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New31 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old29 Jul 2017 ↗

Quarterly progress reports

7 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

7 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q3.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameLOGIX CITY DEVELOPERS PVT.LTD.
RolePromoter · current
RERA IDUPRERAPRM7752
PANAABCL9744L
CIN / TANU70101DL2011PTC215320
Name of chairmanShakti Nath
Registered address301-A, WORLD TRADE TOWER, BARAKHAMBA LANE, CONNAUGHT PLACE, NEW DELHI-110001
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

4 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No project bank account is published for this project.Ask which RERA-designated account payments are to be made to, and check the details against the UP-RERA page before paying anything.
  • No khasra or plot detail is published for this project.Ask which khasra numbers the project stands on, so the plot can be matched against the deed and the revenue record.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
  • No architect, engineer or contractor is published for this project.Ask who the architect and engineer of record are - they are the professionals who certify each quarterly filing.

Common questions about BLOSSOM ZEST(PHASE -3 TOWER- SAT- 3,4,&7)

Is BLOSSOM ZEST(PHASE -3 TOWER- SAT- 3,4,&7) RERA registered?

Yes. BLOSSOM ZEST(PHASE -3 TOWER- SAT- 3,4,&7) is registered with UPRERA under registration number UPRERAPRJ4870, registered on 3 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for BLOSSOM ZEST(PHASE -3 TOWER- SAT- 3,4,&7)?

The completion date filed with UPRERA is 30 Jun 2022. No completion certificate is on record yet.

Who is the builder of BLOSSOM ZEST(PHASE -3 TOWER- SAT- 3,4,&7)?

LOGIX CITY DEVELOPERS PVT.LTD. is the promoter entity that filed BLOSSOM ZEST(PHASE -3 TOWER- SAT- 3,4,&7) with UPRERA (promoter RERA ID UPRERAPRM7752). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted BLOSSOM ZEST(PHASE -3 TOWER- SAT- 3,4,&7) more time to complete?

UPRERA's record carries 1 completion extension for BLOSSOM ZEST(PHASE -3 TOWER- SAT- 3,4,&7), the latest running to 30 Jun 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Where is BLOSSOM ZEST(PHASE -3 TOWER- SAT- 3,4,&7) located?

BLOSSOM ZEST(PHASE -3 TOWER- SAT- 3,4,&7) is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in BLOSSOM ZEST(PHASE -3 TOWER- SAT- 3,4,&7)?

The unit plan filed with UPRERA lists STUDIO. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in BLOSSOM ZEST(PHASE -3 TOWER- SAT- 3,4,&7)?

The approved unit plan filed with UPRERA runs from 87 to 179 m² of carpet area (about 934 to 1,931 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in BLOSSOM ZEST(PHASE -3 TOWER- SAT- 3,4,&7)?

The approved unit plan describes 3 blocks and 462 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is BLOSSOM ZEST(PHASE -3 TOWER- SAT- 3,4,&7)?

About 115 units per acre: 462 planned units across 4.03 acres (16,316 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗