Buildia Galaxy

UPRERARegistered

Buildia Galaxy is a RERA-registered residential project by BUILDIA CONSTRUCTION PRIVATE LIMITED in Lucknow (RERA ID UPRERAPRJ12630). Registered with a completion deadline of 28 Dec 2021.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ12630
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAny Other Competent Authority
Proposed start1 Dec 2015
Original start1 Dec 2015
Project duration58 months
AddressBakshi Ka Talab**, Lucknow
TehsilBakshi Ka Talab**
Applicant typeCompany
Applicant addressSEDARPUR, KARORA, GOSAIGANJ, LUCKNOW- 227125
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Permit revalidated (2)

  2. 2 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. to

    Extension granted

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  8. to

    Extension granted

  9. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  10. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered31 Oct 2017
Original completion31 Dec 2019
Revised completion28 Dec 2021
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary10 Mar 2026
Registration fee₹17,500
Sanctioning authorityAny Other Competent Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors72 · 1 · 7 (units from plan)
  • 2 BHK37 51%
  • 1 BHK23 32%
  • 3 BHK12 17%
ConfigurationUnitsCarpet area
3 BHK12101
2 BHK3759-87
1 BHK2359-60
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
BUILDIA GALAXY · 3 BHK, 2 BHK, 1 BHK, OTHER77259-101
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Md Sohrab Khan
License CA/2014/64170
655/605 Adil Nagar Ring Road Lko
Engineer
sanjay sinha
Vinay Associates Shop No. 9 Arif Chamber 3 Sector H Aliganj Lucknow

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 21 Sept 2020. All 2 carry a revalidation, the latest valid to 21 Sept 2020.

Sanctioned by Any Other Competent Authority · an approved plan of 1 block and 72 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
99429 Oct 201521 Sept 202026 Sept 202415 Sept 202029 Oct 2015
valid to 21 Sept 2020
99429 Oct 201521 Sept 202026 Sept 202415 Sept 202029 Oct 2015
valid to 21 Sept 2020
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 3 completion extensions for this project, the latest running to 28 Dec 2021.

#Granted fromExtended uptoNote
131 Dec 201930 Dec 2020—
230 Dec 202029 Jun 2021Six months extension in view of force majeure caused by covid-19 pandemic
329 Jun 202128 Dec 2021—

Land & documents

3 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
224 and 497 ka25859 sqft—
224 AND 497 KA2402.359Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 31 Aug 2015.

Registry no.DateTypeArea
1131031 Aug 2015other—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · IN-UP01296411440396N
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · IN-UP01296411440396N
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old31 Oct 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking wateryes
Fire safety (as filed with RERA)applied for
Health serviceno
Renewable energyno
Other facilitiesno

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameBUILDIA CONSTRUCTION PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM24003
PANAAFCB8558C
CIN / TANLKON11111F
Name of chairmanMOHD MOAZZAM
Registered addressSEDARPUR, KARORA, GOSAIGANJ, LUCKNOW- 227125
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
BUILDIA CONSTRUCTION PVT LTDBankICICI BANKBranchLEKHRAJ PANNA MARKETA/C no.IFSCICIC0006959
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.

Common questions about Buildia Galaxy

Is Buildia Galaxy RERA registered?

Yes. Buildia Galaxy is registered with UPRERA under registration number UPRERAPRJ12630, registered on 31 Oct 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has Buildia Galaxy been completed?

UPRERA still lists Buildia Galaxy as Registered, so it is not shown as completed here. A completion certificate dated 10 Mar 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Buildia Galaxy?

BUILDIA CONSTRUCTION PRIVATE LIMITED is the promoter entity that filed Buildia Galaxy with UPRERA (promoter RERA ID UPRERAPRM24003). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Buildia Galaxy more time to complete?

UPRERA's record carries 3 completion extensions for Buildia Galaxy, the latest running to 28 Dec 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Buildia Galaxy have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Buildia Galaxy located?

Buildia Galaxy is registered in Lucknow, as filed with UPRERA.

What configurations are available in Buildia Galaxy?

The unit plan filed with UPRERA lists 3 BHK, 2 BHK, 1 BHK and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Buildia Galaxy?

The approved unit plan filed with UPRERA runs from 59 to 101 m² of carpet area (about 640 to 1,090 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Buildia Galaxy?

The approved unit plan describes 1 block and 72 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗