Celebrity Meadows Block D

UPRERARegistered

Celebrity Meadows Block D is a RERA-registered residential project by R. R. Civil Tech Pvt Ltd in Lucknow (RERA ID UPRERAPRJ6743). Registered with a completion deadline of 28 Mar 2022.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ6743
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start15 Oct 2015
Original start15 Oct 2015
Project duration78 months
AddressLucknow, Lucknow
TehsilLucknow
Applicant typeCompany
Applicant addressGround Floor, Raja Ram Kumar Plaza, 75 Hazratganj, Lucknow - 226001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    38981

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. to

    Extension granted

  7. to

    Extension granted

  8. to

    Extension granted

  9. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  10. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered31 Jul 2017
Original completion31 Mar 2020
Revised completion28 Mar 2022
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary2 Nov 2022
Registration fee₹31,000
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors56 · 1 · 17 (units from plan)
  • 2 BHK28 50%
  • 3 BHK28 50%
ConfigurationUnitsCarpet area
2 BHK2892-94
3 BHK28145
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
D Celebrity Meadows · 2 BHK, 3 BHK, OTHER175692-145
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Viresh Kumar
License CA/2005/35401
REPL, Ground Floor, Yuva Bhawan, YMCA Complex, 13 Rana Pratap Marg, Lucknow
Engineer
Ashok Gupta
2/127 Vijay Khand, Gomti Nagar, Lucknow
Contractor
Nazir Khan
Sant Kabeer Nagar, Faizulla Ganj, Lucknow
Sr.Development work declared to RERA
1Demarcation of Plots
Part of the entire project of Celebrity Meadows having 15 towers.
2Boundary Wall
Boundary Wall along the entire project.
3Road Work
Yes
4Footpaths
Yes
5Water Supply Including Drinking Water Facilities
Yes
6Sewer System
Yes
7Drain
Yes
8Parks
Yes
9Tree Planting
Yes
10Design For Electric Supply Including Street Lighting
Yes
11Community Buildings
No
12Treatment and Disposal System of Sewage and Sullage water
No
13Solid Waste Management And Disposal System
No
14Water Conservation System
Yes
15Energy Management System Including Use of Renewable Energy
No
16Fire Protection And Fire Safety System
Yes
17Social Infrastructure And Other Public Amenities Including Public Health Services
Yes-In the township
18Emergency Evacuation Services
Yes
19Other Miscellaneous Work
No
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

3 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1M.S. ConsultantsUPRERAAGT10079
2SHREE SHRADDHA PROPERTIESUPRERAAGT10301
3STRAIGHTEDGE REAL ESTATE PRIVATE LIMITEDUPRERAAGT10067
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 14 Oct 2020.

Sanctioned by Lucknow Development Authority · 5,143 sqm of land · an approved plan of 1 block and 56 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoRevised endDocuments filed
3898115 Oct 201514 Oct 202014 Oct 2020
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 4 completion extensions for this project, the latest running to 28 Mar 2022.

#Granted fromExtended uptoNote
131 Mar 202030 Sept 2020Six months extension in view of force majeure caused by covid-19 pandemic
230 Sept 202014 Oct 2020—
314 Oct 202029 Sept 2021—
429 Sept 202128 Mar 2022—

Land & documents

5 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
591566.50Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 7 Aug 2010.

Registry no.DateTypeArea
Nil7 Aug 2010other—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 8425
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New1 Jun 2019 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New6 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New3 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New3 Jul 2018 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterOwn Boring and Tubewell
Fire safety (as filed with RERA)As per NBC Norms
Renewable energyN.A.
Other facilitiesN.A.

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

7 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

7 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q4.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameR. R. Civil Tech Pvt Ltd
RolePromoter · current
RERA IDUPRERAPRM5860
PANAADCR8302A
CIN / TANU45400UP2008PTC034469
Name of chairmanRahul Agarwal
Registered addressGround Floor, Raja Ram Kumar Plaza, 75 Hazratganj, Lucknow - 226001
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
R. R. CIVIL TECH PVT LTDBankINDIAN BANKBranchHAZRATGANJ LUCKNOWA/C no.IFSCIDIB000L002
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

20 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Filed document
viewprojects · 5
ENGINEERS CERTIFICATE
newly filed with RERA
21 Oct 2026
Filed document
viewprojects · 4
ARCHITECT CERTIFICATE
newly filed with RERA
21 Oct 2026
Filed document
viewprojects · 3
CA CERTIFICATE
newly filed with RERA
21 Oct 2026
Filed document
viewprojects · 2
Other Plan(If Any)
newly filed with RERA
21 Oct 2026
Filed document
viewprojects · 1
Details of Encumbrances
newly filed with RERA
21 Oct 2026
Filed document
summary · 5
ARCHITECT CERTIFICATE
no longer on the record
21 Oct 2026
Filed document
summary · 4
ENGINEERS CERTIFICATE
no longer on the record
21 Oct 2026
Filed document
summary · 3
CA CERTIFICATE
no longer on the record
21 Oct 2026
Filed document
summary · 2
Details of Encumbrances
no longer on the record
21 Oct 2026
Filed document
summary · 1
Other Plan(If Any)
no longer on the record
21 Oct 2026
Filed document
summary · 5
ARCHITECT CERTIFICATE
newly filed with RERA
19 Oct 2026
Filed document
summary · 4
ENGINEERS CERTIFICATE
newly filed with RERA
19 Oct 2026
Filed document
summary · 3
CA CERTIFICATE
newly filed with RERA
19 Oct 2026
Filed document
summary · 2
Details of Encumbrances
newly filed with RERA
19 Oct 2026
Filed document
summary · 1
Other Plan(If Any)
newly filed with RERA
19 Oct 2026
Filed document
viewprojects · 5
ENGINEERS CERTIFICATE
no longer on the record
19 Oct 2026
Filed document
viewprojects · 4
ARCHITECT CERTIFICATE
no longer on the record
19 Oct 2026
Filed document
viewprojects · 3
CA CERTIFICATE
no longer on the record
19 Oct 2026
Filed document
viewprojects · 2
Other Plan(If Any)
no longer on the record
19 Oct 2026
Filed document
viewprojects · 1
Details of Encumbrances
no longer on the record
19 Oct 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 21 Sept 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about Celebrity Meadows Block D

Is Celebrity Meadows Block D RERA registered?

Yes. Celebrity Meadows Block D is registered with UPRERA under registration number UPRERAPRJ6743, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has Celebrity Meadows Block D been completed?

UPRERA still lists Celebrity Meadows Block D as Registered, so it is not shown as completed here. A completion certificate dated 2 Nov 2022 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Celebrity Meadows Block D?

R. R. Civil Tech Pvt Ltd is the promoter entity that filed Celebrity Meadows Block D with UPRERA (promoter RERA ID UPRERAPRM5860). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Celebrity Meadows Block D more time to complete?

UPRERA's record carries 4 completion extensions for Celebrity Meadows Block D, the latest running to 28 Mar 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Celebrity Meadows Block D have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Celebrity Meadows Block D located?

Celebrity Meadows Block D is registered in Lucknow, as filed with UPRERA.

What configurations are available in Celebrity Meadows Block D?

The unit plan filed with UPRERA lists 2 BHK, 3 BHK and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Celebrity Meadows Block D?

The approved unit plan filed with UPRERA runs from 92 to 145 m² of carpet area (about 993 to 1,564 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Celebrity Meadows Block D?

The approved unit plan describes 1 block and 56 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Celebrity Meadows Block D?

About 44 units per acre: 56 planned units across 1.27 acres (5,143 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗