CHARMS CASTLE

UPRERARegistered

CHARMS CASTLE is a RERA-registered residential project by Mr. Sanjay Singhal in Ghaziabad (RERA ID UPRERAPRJ6777). Registered with a completion deadline of 30 Dec 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
82.1%Q3'25
83.89%Q4'25
86.1%Q1'26
81.93%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ6777
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start16 May 2017
Project duration116 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeIndividual
Applicant addressSE - 111, Shastri Nagar, Ghaziabad, U.P.
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Permit revalidated (4)

  2. 6 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. to

    Extension granted

  8. valid to

    Permit revalidated

    613/GMP/MULTI/ZONE1/16-17

  9. valid to

    Permit revalidated

    GH/06159/GDA/BP/23-24/1364/29122023

  10. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered31 Jul 2017
Original completion15 May 2022
Revised completion30 Dec 2026
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,30,500
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors1,320 · 9 · 26 (units from plan)
Homes · commercial units1,292 · 28 (shops and offices filed in the same plan)
  • 2 BHK536 41%
  • 3 BHK448 34%
  • OTHER308 23%
  • SHOP28 2%
ConfigurationUnitsCarpet area
3 BHK44870-106
2 BHK53651-79
SHOP2814-15
OTHER30820-32
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A · 3 BHK25149106
Commercial · SHOP42814-15
EWS/LIG-EWS · OTHER2215420
EWS/LIG-LIG · OTHER2215432
F · 2 BHK2519952-69
G · 2 BHK2519752-69
H1 · 3 BHK, 2 BHK2514951-78
H2 · 3 BHK, 2 BHK2514951-78
I · 3 BHK, 2 BHK2014170-79
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Space Designers International
License CA/98/23185
B-34, Sec - 67, Noida, U.P.
Engineer
Vikas Kumar Garg
52, Sec - 5, Vaishali, Ghaziabad, U.P.
Contractor
B.L. GOEL & COMPANY
A-15, Grnd Floor, Jangpura Ext., New Delhi - 14
Sr.Development work declared to RERA
1Demarcation of Plots
Total Plot Area 25007 Sqmtr. located in Khasra No. 1055, 1056 & 1099
2Boundary Wall
2100 mm height, along entire periphery
3Road Work
Interlocking Pavers
4Footpaths
Interlocking Pavers
5Water Supply Including Drinking Water Facilities
Two underground tanks of capacity 250 KL
6Sewer System
Underground Systems using RCC-NP-3 Pipes
7Drain
Underground Systems using RCC-NP-3 Pipes
8Parks
Parks having total area of 2500 Sqmtr.
9Tree Planting
83 Nos. of trees (along with parks and boundary wall area)
10Design For Electric Supply Including Street Lighting
Two electricity transformers of 1250 KVA capacity each shall be
11Community Buildings
Built up area of community building shall be 972 Sq.mtr.
12Treatment and Disposal System of Sewage and Sullage water
STP of capacity of 400 KLD shall be provided treated water.
13Solid Waste Management And Disposal System
Manual collection and organic waste converter shall be provided.
14Water Conservation System
Rain water harvesting facilities shall be provided.
15Energy Management System Including Use of Renewable Energy
Solar panels shall be provided on terrace for renewable energy.
16Fire Protection And Fire Safety System
Fire tender path shall be provided as per NBC, fire fighting system provided.
17Emergency Evacuation Services
Staircases shall be provided in basement and all the towers for fire escape/exit.
18Other Miscellaneous Work
Building spaces/plots for school, retail shops
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

11 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1Daksh SiinghUPRERAAGT14790
2DINESH KUMARUPRERAAGT11019
3GAURAV JAINUPRERAAGT11716
4Hem Raj SinghUPRERAAGT13355
5RAHUL CHAURASIYAUPRERAAGT14046
6RISHABH JAINUPRERAAGT14347
7Sehlot realtors & developersUPRERAAGT11769
8SQUARE YARDS CONSULTING PRIVATE LIMITEDUPRERAAGT10119
9SYED ANWAR ZAIDIUPRERAAGT13761
10TANUJ SHARMAUPRERAAGT12133
11Vaibhav NarayanUPRERAAGT11713
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

6 permits

An approval and the date it runs to - not proof the work matching it was done.

6 sanctioning permits are on record with UPRERA, the latest valid to 14 Nov 2022. All 6 carry a revalidation, the latest valid to 15 May 2025.

Sanctioned by Ghaziabad Development Authority · 25,007 sqm of land · an approved plan of 9 blocks and 1320 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
278/GH/Z-1/116-1716 May 201715 Sept 202215 May 202215 May 202216 May 2017
valid to 15 May 2022
as 278/GH/Z-1/16-17
278/GH/Z-1/116-1716 May 201715 May 202215 May 202215 May 202216 May 2017
valid to 15 May 2022
278/GH/Z-1/116-1716 May 201715 May 202215 May 202215 May 202216 May 2017
278/GH/Z-1/116-1716 May 201715 May 202230 Dec 202614 Nov 202231 Dec 2023
valid to 15 May 2025
as GH/06159/GDA/BP/23-24/1364/29122023
278/GH/Z-1/116-1716 May 201714 Nov 202215 May 202514 Nov 202216 May 2017
valid to 15 May 2025
278/GH/Z-1/116-1716 May 201714 Nov 202215 May 202514 Nov 202216 Dec 2023
valid to 15 May 2025
as 613/GMP/MULTI/ZONE1/16-17
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 30 Dec 2026.

#Granted fromExtended uptoNote
115 May 202214 Nov 2022Six months extension in view of force majeure caused by covid-19 pandemic
214 Nov 202230 Dec 2026—

Land & documents

28 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
10551060 meters—
10564783.88—
109934920—
10551060Khasra
10564783.88Khasra
109934920Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

10 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 4 Jun 2007.

Registry no.DateTypeArea
1280626 Sept 2012self—
1280026 Sept 2012self—
1280726 Sept 2012self—
1280326 Sept 2012self—
42664 Jun 2007self—
701320 Sept 2007self—
701020 Sept 2007self—
109763 Nov 2011self—
109773 Nov 2011self—
1280226 Sept 2012self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1421 - 1426
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1421 - 1426
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1421 - 1426
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 12807
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 12806
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 12803
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 12802
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 12800
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 7013
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 7010
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4266
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Sale deed · 10976
The registered deed by which the promoter bought the land.
PDF ↗
Registry document · 10977
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 10976
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New7 May 2020 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New6 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New6 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New6 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New4 Mar 2020 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New4 Mar 2020 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New4 Mar 2020 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
Old31 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old11 Oct 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old11 Oct 2017 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old16 Dec 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old16 Dec 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old23 Jan 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old23 Jan 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
Old23 Jan 2018 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYes
Fire safety (as filed with RERA)Yes
Renewable energyYes
Other facilitiesYes

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

25 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

25 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q282.1%CA ↗ · Arch ↗ · Eng ↗
2025-Q383.89%CA ↗ · Arch ↗ · Eng ↗
2025-Q486.1%CA ↗ · Arch ↗ · Eng ↗
2026-Q181.93%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameMr. Sanjay Singhal
RolePromoter · current
RERA IDUPRERAPRM13442
PANAFSPS2189F
Registered addressSE - 111, Shastri Nagar, Ghaziabad, U.P.
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Charms India Pvt. Ltd.BankHDFC Bank Ltd.BranchVaishali, GhaziabadA/C no.IFSCHDFC0000422
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about CHARMS CASTLE

Is CHARMS CASTLE RERA registered?

Yes. CHARMS CASTLE is registered with UPRERA under registration number UPRERAPRJ6777, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for CHARMS CASTLE?

The completion date filed with UPRERA is 30 Dec 2026. No completion certificate is on record yet.

Who is the builder of CHARMS CASTLE?

Mr. Sanjay Singhal is the promoter entity that filed CHARMS CASTLE with UPRERA (promoter RERA ID UPRERAPRM13442). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted CHARMS CASTLE more time to complete?

UPRERA's record carries 2 completion extensions for CHARMS CASTLE, the latest running to 30 Dec 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does CHARMS CASTLE have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is CHARMS CASTLE located?

CHARMS CASTLE is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in CHARMS CASTLE?

The unit plan filed with UPRERA lists 3 BHK, 2 BHK, SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in CHARMS CASTLE?

The approved unit plan filed with UPRERA runs from 14 to 106 m² of carpet area (about 147 to 1,142 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in CHARMS CASTLE?

The approved unit plan describes 9 blocks and 1,320 units of which 1,292 are homes and 28 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is CHARMS CASTLE?

About 214 units per acre: 1,320 planned units across 6.18 acres (25,007 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗