CONSTRUCTION OF 192 HOUSES AT POCKET-D INDRAPRASTH YOJANA LONI GHAZIABAD is a RERA-registered residential project by Ghaziabad Development Authority in Ghaziabad (RERA ID UPRERAPRJ440273). Registered with a completion deadline of 14 Aug 2021. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ440273 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Ghaziabad Development Authority |
| Proposed start | 16 Aug 2018 |
| Project duration | 36 months |
| Address | Ghaziabad, Ghaziabad |
| Tehsil | Ghaziabad |
| Applicant type | Competent authority |
| Applicant address | Vikas Path, Near Purana Bus Adda, Hapur Road, Ghaziabad 201001 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Building permit sanctioned
43/4EEZONE-8/2020-21
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 29 Jul 2020 |
| Original completion | 14 Aug 2021 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹27,000 |
| Sanctioning authority | Ghaziabad Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 2 BHK144 75%
- 1 BHK48 25%
| Configuration | Units | Carpet area |
|---|---|---|
| 1 BHK | 48 | 37 |
| 2 BHK | 144 | 48-50 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| tower D · 1 BHK | 12 | 24 | 37 |
| tower D (2 BHK, Type-1) · 2 BHK | 12 | 48 | 48 |
| tower D (2 BHK, Type-2) · 2 BHK | 12 | 24 | 50 |
| tower E · 1 BHK | 12 | 24 | 37 |
| tower E (2 BHK, type-1) · 2 BHK | 12 | 48 | 48 |
| tower E (2 BHK, type-2) · 2 BHK | 12 | 24 | 50 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots East-Group housing plots, West- Block-C of Indraprastha Scheme, North- 18m wide road, South- Park and UGR |
| 2 | Boundary Wall Boundary wall had been constructed on all outer sides of building with column and brick work and plaster has been done. |
| 3 | Road Work Main Approach road mohan nagar to loni already exist. 18m wide road has constructed on north side of buildings. Cement Concrete road is constructed in front of houses with M-25 grade cement concrete |
| 4 | Footpaths 1.5 m wide Footpath has been made with interlocking tiles. |
| 5 | Water Supply Including Drinking Water Facilities Underground UGR has been constructed for drinking water and 110 mm dia PVC pipe line from UGR is connected to 80mm PVC pipe line which provide the water to the flats. |
| 6 | Sewer System Providing and laying 300 mm NP-2 RCC hume pipe for sewer disposal connected with the existing main sewer line. |
| 7 | Drain Surface drain is constructed both sides of the cement concrete road and it will be covered with pre-cast perforated RCC cover block. |
| 8 | Parks providing and fixing of curve stone surrounding of the park |
| 9 | Tree Planting tree planting will be provide |
| 10 | Design For Electric Supply Including Street Lighting electricity transformers has been installed and street light will install all around the proposed building |
| 11 | Community Buildings it is not proposed in the scheme. |
| 12 | Treatment and Disposal System of Sewage and Sullage water Disposal System of Sewage and Sullage water by existing sewer line. |
| 13 | Solid Waste Management And Disposal System it is not proposed in the scheme. |
| 14 | Water Conservation System water conservation system will be provided with rain water harvesting system after completion of the building work |
| 15 | Energy Management System Including Use of Renewable Energy Through power backup |
| 16 | Fire Protection And Fire Safety System Fire Protection And Fire Safety System will be installed |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Social Infrastructure And Other Public Amenities Including Public Health Services is nearby the scheme. |
| 18 | Emergency Evacuation Services Emergency Evacuation Services is proposed in all side of buildings |
| 19 | Other Miscellaneous Work Retro reflective signage board will be provided at the main gates |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 14 Aug 2021.
Sanctioned by Ghaziabad Development Authority · 4,352 sqm of land · an approved plan of 6 blocks and 192 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 43/4EEZONE-8/2020-21 | 30 Jun 2020 | 14 Aug 2021 | 29 Jun 2029 | 14 Aug 2021 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
16 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 490 | 0.8507 | Khasra |
| Khatauni extract · 1423-1428 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 1 Jul 2020 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 24 Oct 2019 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 1 Jul 2020 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 21 Jul 2020 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 24 Oct 2019 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 14 Jul 2020 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 14 Jul 2020 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 14 Jul 2020 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 24 Oct 2019 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 1 Jul 2020 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 14 Jul 2020 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 1 Jul 2020 ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Ghaziabad Development Authority |
| Role | Promoter · current |
| RERA ID | UPRERAPRM11404 |
| PAN | AAALG0072C |
| CIN / TAN | MRTG00108D |
| Registered address | Vikas Path, Near Purana Bus Adda, Hapur Road, Ghaziabad 201001 |
| RERA contact | |
| Registered since | 2017 |
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | VC GDA ESCROW ACCOUNT SAMABankvijaya bankBranchNavyug marketA/C no.IFSCVIJB0007113 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about CONSTRUCTION OF 192 HOUSES AT POCKET-D INDRAPRASTH YOJANA LONI GHAZIABAD
Is CONSTRUCTION OF 192 HOUSES AT POCKET-D INDRAPRASTH YOJANA LONI GHAZIABAD RERA registered?
Yes. CONSTRUCTION OF 192 HOUSES AT POCKET-D INDRAPRASTH YOJANA LONI GHAZIABAD is registered with UPRERA under registration number UPRERAPRJ440273, registered on 29 Jul 2020. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for CONSTRUCTION OF 192 HOUSES AT POCKET-D INDRAPRASTH YOJANA LONI GHAZIABAD?
The completion date filed with UPRERA is 14 Aug 2021. No completion certificate is on record yet.
Who is the builder of CONSTRUCTION OF 192 HOUSES AT POCKET-D INDRAPRASTH YOJANA LONI GHAZIABAD?
Ghaziabad Development Authority is the promoter entity that filed CONSTRUCTION OF 192 HOUSES AT POCKET-D INDRAPRASTH YOJANA LONI GHAZIABAD with UPRERA (promoter RERA ID UPRERAPRM11404). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Why does CONSTRUCTION OF 192 HOUSES AT POCKET-D INDRAPRASTH YOJANA LONI GHAZIABAD show "default on QPR"?
UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.
Does CONSTRUCTION OF 192 HOUSES AT POCKET-D INDRAPRASTH YOJANA LONI GHAZIABAD have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is CONSTRUCTION OF 192 HOUSES AT POCKET-D INDRAPRASTH YOJANA LONI GHAZIABAD located?
CONSTRUCTION OF 192 HOUSES AT POCKET-D INDRAPRASTH YOJANA LONI GHAZIABAD is registered in Ghaziabad, as filed with UPRERA.
What configurations are available in CONSTRUCTION OF 192 HOUSES AT POCKET-D INDRAPRASTH YOJANA LONI GHAZIABAD?
The unit plan filed with UPRERA lists 1 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in CONSTRUCTION OF 192 HOUSES AT POCKET-D INDRAPRASTH YOJANA LONI GHAZIABAD?
The approved unit plan filed with UPRERA runs from 37 to 50 m² of carpet area (about 393 to 533 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in CONSTRUCTION OF 192 HOUSES AT POCKET-D INDRAPRASTH YOJANA LONI GHAZIABAD?
The approved unit plan describes 6 blocks and 192 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is CONSTRUCTION OF 192 HOUSES AT POCKET-D INDRAPRASTH YOJANA LONI GHAZIABAD?
About 179 units per acre: 192 planned units across 1.08 acres (4,352 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.