construction of 259 multi storied flat at GH-9

UPRERARegistered

construction of 259 multi storied flat at GH-9 is a RERA-registered residential project by Ghaziabad Development Authority in Ghaziabad (RERA ID UPRERAPRJ6013). Registered with a completion deadline of 14 Apr 2018.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ6013
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start15 Jul 2016
Original start15 Jul 2016
Project duration21 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompetent authority
Applicant addressVikas Path, Near Purana Bus Adda, Hapur Road, Ghaziabad 201001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    678/NEYO-ANU/2016

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  6. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered2 Aug 2017
Original completion14 Apr 2018
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary1 Oct 2019
Registration fee₹39,500
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors259 · 3 · 9 (units from plan)
ConfigurationUnitsCarpet area
2 BHK25951
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
TOWER A · 2 BHK913551
TOWER B · 2 BHK99051
TOWER C · 2 BHK93451
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
ashish srivastva
License CA/93/15850
P.N. 306 3rd floor, kasmanda regent apartment ,2 park road lucknow
Engineer
S.N. Sharan
1/353 i, vinamra khand gomati nagar lucknow
Contractor
Anand buildtech pvt ltd
H-169/8 Sector 12 noida gautam budha nagar ,up
Sr.Development work declared to RERA
1Demarcation of Plots
YES
2Boundary Wall
YES
3Road Work
YES
4Footpaths
AVAILABLE
5Water Supply Including Drinking Water Facilities
AVAILABLE
6Sewer System
AVAILABLE
7Drain
AVAILABLE
8Parks
AVAILABLE
9Tree Planting
AVAILABLE
10Design For Electric Supply Including Street Lighting
AVAILABLE
11Community Buildings
AVAILABLE
12Treatment and Disposal System of Sewage and Sullage water
NA
13Solid Waste Management And Disposal System
NA
14Water Conservation System
NA
15Energy Management System Including Use of Renewable Energy
NA
16Fire Protection And Fire Safety System
AVAILABLE
17Social Infrastructure And Other Public Amenities Including Public Health Services
AVAILABLE
18Emergency Evacuation Services
NA
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 13 Jan 2019.

Sanctioned by Ghaziabad Development Authority · 6,821 sqm of land · an approved plan of 3 blocks and 259 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
678/NEYO-ANU/201628 Apr 201613 Jan 201930 Jun 201914 Apr 2018
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗

Land & documents

15 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
431MI, 446MI6821Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1420-1425
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New28 Dec 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New28 Dec 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New28 Dec 2018 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New28 Dec 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New29 Dec 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New29 Dec 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New28 Dec 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New29 Dec 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New28 Dec 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old11 Oct 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterprovision for water supply
Fire safety (as filed with RERA)provision for fire fighting
Other facilitiesplot for community facility

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameGhaziabad Development Authority
RolePromoter · current
RERA IDUPRERAPRM11404
PANAAALG0072C
CIN / TANMRTG00108D
Registered addressVikas Path, Near Purana Bus Adda, Hapur Road, Ghaziabad 201001
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
V.C.GDA K.E.Y.S.-PROJECT 11Bankvijaya bankBranchGDA ext. counter navyug marketA/C no.IFSCVIJB0001786
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.

Common questions about construction of 259 multi storied flat at GH-9

Is construction of 259 multi storied flat at GH-9 RERA registered?

Yes. construction of 259 multi storied flat at GH-9 is registered with UPRERA under registration number UPRERAPRJ6013, registered on 2 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has construction of 259 multi storied flat at GH-9 been completed?

UPRERA still lists construction of 259 multi storied flat at GH-9 as Registered, so it is not shown as completed here. A completion certificate dated 1 Oct 2019 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of construction of 259 multi storied flat at GH-9?

Ghaziabad Development Authority is the promoter entity that filed construction of 259 multi storied flat at GH-9 with UPRERA (promoter RERA ID UPRERAPRM11404). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does construction of 259 multi storied flat at GH-9 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is construction of 259 multi storied flat at GH-9 located?

construction of 259 multi storied flat at GH-9 is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in construction of 259 multi storied flat at GH-9?

The unit plan filed with UPRERA lists 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

How many towers and units are planned in construction of 259 multi storied flat at GH-9?

The approved unit plan describes 3 blocks and 259 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is construction of 259 multi storied flat at GH-9?

About 154 units per acre: 259 planned units across 1.69 acres (6,821 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗