DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL

UPRERARegistered

DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL is a RERA-registered commercial project by BOULEVARD PROJECTS PRIVATE LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ9759). Registered with a completion deadline of 23 Aug 2029.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
14%Q3'24
14%Q4'24
14%Q1'25
14%Q2'25
14%Q3'25
14%Q4'25
14%Q1'26
14%Q2'26

Construction stayed at 14% across 25 consecutive filed quarters (Apr–Jun 2020 to Apr–Jun 2026). The promoter filed the same figure each time. Quarters with no percentage filed are not counted either way.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ9759
Project categoryCommercial
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start10 Aug 2017
Original start24 Oct 2011
Project duration145 months
AddressPlot No-001/A, block no. C,in sector-16B, NOIDA U.P, Gautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressMax House 1, Dr. Jha Marg, Okhla Phase 3, Okhla Industrial Estate, South Delhi, New Delhi, India - 110020
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    NOIDA/BC/BP-IV-1309/468

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. to

    Extension granted

  7. Permit revalidated (4)

  8. 3 building permits sanctioned

  9. Permit revalidated (2)

  10. 2 building permits sanctioned

  11. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered11 Aug 2017
Original completion31 Dec 2023
Revised completion23 Aug 2029
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹3,57,000
Sanctioning authorityNoida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors327 · 4 · 36 (units from plan)
Homes · commercial units128 · 199 (shops and offices filed in the same plan)
  • Office Space168 51%
  • 1 BHK58 18%
  • 3 BHK33 10%
  • SHOP31 9%
  • 4 BHK22 7%
  • Other15 4%
ConfigurationUnitsCarpet area
OTHER861-272
SHOP3138-873
4 BHK22444-458
3 BHK33214-399
PENTHOUSE7859-876
1 BHK58400-463
Office Space16843-1,416
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Nexus Tower (Commercial) · OTHER, SHOP, Office Space164857-495
Office Tower-B · OTHER, SHOP, Office Space2715138-1,416
Services Residence Tower-1 · OTHER, SHOP, 4 BHK, 3 BHK, PENTHOUSE3667214-1,030
Services Residence Tower-2 · OTHER, SHOP, 1 BHK3661272-925
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.The plan also files 916.07 m² for a OTHER, 1,029.71 m² for a OTHER, 925.08 m² for a OTHER, far outside the rest of that type, so the ranges above leave them out.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Gaurav Gupta (RSP Design Consultant Private Limited)
License CA/2001/27400
Unit 103, Bestech Business Tower, Sector 48, Sohna Road, Gurgaon - 122018
Engineer
VINTECH CONSULTANTS
C-35, PAMPOSH ENCLAVE, GK-I, NEW DELHI-48
Contractor
Aditya Enterprises
Basement, A-169, A Block, Shivalik, Malviya Nagar, Delhi - 110017
Sr.Development work declared to RERA
1Demarcation of Plots
The Plot No. C -001/A, Sector 16B, Noida has been demarcated on site.
2Boundary Wall
1.5 m to 2 m high Boundary Wall with elegant design Integrated with MS railing.
3Road Work
Peripheral loop of road (Carriageway from 6 m to 7.5 m of width) connecting to each tower
4Footpaths
Networks of Footpaths connects with various parts in the Landscape and Towers
5Water Supply Including Drinking Water Facilities
Potable water supply from the municipal water supply shall be collected in an underground collection tank and pumped to an overhead water tank. The supply of water to individual Units shall be from the said overhead water tanks.
6Sewer System
Centralized STP to treat Sewage and every tower has its own down-comers connected to main sewage line.
7Drain
Drainage through network of Pipe and Catch Basin to nearest Storm Water Drain and shall be connected to Noida Authority drain.
8Parks
Green area to be provided as per the approved plan.
9Tree Planting
The trees will be planted at all suitable locations of the project and along the boundary walls. The tree selection, flora, and vegetation shall be as per the climatic conditions. Trees will be planted in a manner to ensure that there is no hindrance to the services/ usage in the project.
10Design For Electric Supply Including Street Lighting
LED lights will be used for street lighting on external poles/lights proposed.
11Community Buildings
The community area is within the building footprint and will be developed as per the approved plan.
12Treatment and Disposal System of Sewage and Sullage water
Central STP for the entire Project and all towers shall be connected to STP.
13Solid Waste Management And Disposal System
Project shall have waste segregation area and OWC for treatment of organic waste.
14Water Conservation System
Rainwater harvesting pits , 10 in number, shall be provided for groundwater recharging and overflow to be discharged in the municipal drains. Treated sewage shall be used for irrigation and flushing.
15Energy Management System Including Use of Renewable Energy
A solar panel system of 150 KW will be used to reduce the energy consumption, and electrical appliances with a star rating will be used in the community building.
16Fire Protection And Fire Safety System
Sprinklers, fire doors, yard hydrants, smoke detectors, fire alarm system and external and internal hydrants will be provided as applicable aligned with applicable Fire norms
17Social Infrastructure And Other Public Amenities Including Public Health Services
Retail Ameneties shall be developed as per the approved plan.
18Emergency Evacuation Services
Fire staircases and Refuge areas shall be provided as per the approved fire drawing for evacuation to open areas.
19Other Miscellaneous Work
Proper Security system including Security Guard, CCTV Cameras and controlled access shall be provided.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

6 permits

An approval and the date it runs to - not proof the work matching it was done.

6 sanctioning permits are on record with UPRERA, the latest valid to 17 Jun 2031. All 6 carry a revalidation, the latest valid to 7 Dec 2030.

Sanctioned by Noida Authority · 34,697 sqm of land · an approved plan of 4 blocks and 327 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
NOIDA/BC/BP-IV-1309/46824 Oct 201123 Oct 20167 Dec 203530 Jun 20248 Dec 2025
valid to 7 Dec 2030
as 2025/09/04/12961
2025/09/04/129618 Dec 20257 Dec 20307 Dec 203530 Jun 20248 Dec 2025
2025/09/04/129618 Dec 20257 Dec 20307 Dec 203530 Jun 20248 Dec 2025
2025/09/04/129618 Dec 20257 Dec 20307 Dec 203530 Jun 20248 Dec 2025
2026/04/28/1394018 Jun 202617 Jun 203117 Jun 203623 Aug 202918 Jun 2026
2026/04/28/1394018 Jun 202617 Jun 203117 Jun 203623 Aug 202918 Jun 2026
Plans and approvals filed with RERA
DocumentFile
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 23 Aug 2029.

#Granted fromExtended uptoNote
131 Dec 202330 Jun 2024Six months extension in view of force majeure caused by covid-19 pandemic
230 Jun 202423 Aug 2029—

Land & documents

4 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
--—
C-001/A, Sector 16B, NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN-20130134696.72Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 29 Jun 2010.

Registry no.DateTypeArea
SN 2668 Book 1, Vol-1971, Pg 33 to 10629 Jun 2010self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · Lease Deed No. 2668
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · Sub- Lease Deed No. 1811
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · Sub-Lease Deed No. 1809
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old11 Aug 2017 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old26 Oct 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterAS PER SUPPLY
Fire safety (as filed with RERA)YES, SPRINKLERS, FIRE TANKS, FHC, EFHC, FIRE TENDER PATH
Other facilitiesPOWER BACK UP THROUGH DG, ELECTRICAL AND LV SERVICES, AIR CONDITIONING, BASEMENT MECHANICAL VENTILLATION

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

25 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

25 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.

QuarterConstructionCertificates
2020-Q114%CA ↗ · Arch ↗ · Eng ↗
2020-Q214%CA ↗ · Arch ↗ · Eng ↗
2020-Q314%CA ↗ · Arch ↗ · Eng ↗
2020-Q414%CA ↗ · Arch ↗ · Eng ↗
2021-Q114%CA ↗ · Arch ↗ · Eng ↗
2021-Q214%CA ↗ · Arch ↗ · Eng ↗
2021-Q314%CA ↗ · Arch ↗ · Eng ↗
2021-Q414%CA ↗ · Arch ↗ · Eng ↗
2022-Q114%CA ↗ · Arch ↗ · Eng ↗
2022-Q214%CA ↗ · Arch ↗ · Eng ↗
2022-Q314%CA ↗ · Arch ↗ · Eng ↗
2022-Q414%CA ↗ · Arch ↗ · Eng ↗
2023-Q114%CA ↗ · Arch ↗ · Eng ↗
2023-Q214%CA ↗ · Arch ↗ · Eng ↗
2023-Q314%CA ↗ · Arch ↗ · Eng ↗
2023-Q414%CA ↗ · Arch ↗ · Eng ↗
2024-Q114%CA ↗ · Arch ↗ · Eng ↗
2024-Q214%CA ↗ · Arch ↗ · Eng ↗
2024-Q314%CA ↗ · Arch ↗ · Eng ↗
2024-Q414%CA ↗ · Arch ↗ · Eng ↗
2025-Q114%CA ↗ · Arch ↗ · Eng ↗
2025-Q214%CA ↗ · Arch ↗ · Eng ↗
2025-Q314%CA ↗ · Arch ↗ · Eng ↗
2025-Q414%CA ↗ · Arch ↗ · Eng ↗
2026-Q114%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameBOULEVARD PROJECTS PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM9075
PANAAECB1358H
CIN / TANU70200DL2010PTC203764
Name of chairmanAnshul Gaurav
Registered addressMax House 1, Dr. Jha Marg, Okhla Phase 3, Okhla Industrial Estate, South Delhi, New Delhi, India - 110020
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Boulevard Projects Pvt Ltd Collection Account for Delhi OneBankICICI BankBranchNoida - Sector 18Branch addressK1, Senior Mall, Sector 18, Noida, Uttar Pradesh - 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0000031Branch emailgbnoida[at]icici.bank.in, sharma.kom[at]icici.bank.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Boulevard Projects Pvt Ltd Separate Bank Account for Delhi OneBankICICI BankBranchNoida - Sector 18Branch addressK1, Senior Mall, Sector 18, Noida, Uttar Pradesh - 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0000031Branch emailGBONOIDA[at]icici.bank.in, sharma.kom[at]icici.bank.in
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Boulevard Projects Pvt Ltd RERA Transaction Account for Delhi OneBankICICI BankBranchNoida - Sector 18Branch addressK1, Senior Mall, Sector 18, Noida, Uttar Pradesh - 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0000031Branch emailgbnoida[at]icici.bank.in, sharma.kom[at]icici.bank.in
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)18 (Under Registration - 1 ) → 18 (Under Registration - 0 )
changed in Estanzo’s record
29 Sept 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 29 Sept 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL

Is DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL RERA registered?

Yes. DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL is registered with UPRERA under registration number UPRERAPRJ9759, registered on 11 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL?

The completion date filed with UPRERA is 23 Aug 2029. No completion certificate is on record yet.

Who is the builder of DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL?

BOULEVARD PROJECTS PRIVATE LIMITED is the promoter entity that filed DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL with UPRERA (promoter RERA ID UPRERAPRM9075). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL more time to complete?

UPRERA's record carries 2 completion extensions for DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL, the latest running to 23 Aug 2029. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL located?

DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL?

The unit plan filed with UPRERA lists OTHER, SHOP, 4 BHK, 3 BHK, PENTHOUSE, 1 BHK and Office Space. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL?

The approved unit plan filed with UPRERA runs from 38 to 1,416 m² of carpet area (about 409 to 15,240 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL?

The approved unit plan describes 4 blocks and 327 units of which 128 are homes and 199 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL?

About 38 units per acre: 327 planned units across 8.57 acres (34,697 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗