DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL is a RERA-registered commercial project by BOULEVARD PROJECTS PRIVATE LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ9759). Registered with a completion deadline of 23 Aug 2029.
RERA status as reported: Registered.Construction progress
Construction stayed at 14% across 25 consecutive filed quarters (Apr–Jun 2020 to Apr–Jun 2026). The promoter filed the same figure each time. Quarters with no percentage filed are not counted either way.
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ9759 |
| Project category | Commercial |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Noida Authority |
| Proposed start | 10 Aug 2017 |
| Original start | 24 Oct 2011 |
| Project duration | 145 months |
| Address | Plot No-001/A, block no. C,in sector-16B, NOIDA U.P, Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | Max House 1, Dr. Jha Marg, Okhla Phase 3, Okhla Industrial Estate, South Delhi, New Delhi, India - 110020 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
NOIDA/BC/BP-IV-1309/468
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
Permit revalidated (4)
3 building permits sanctioned
Permit revalidated (2)
2 building permits sanctioned
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 11 Aug 2017 |
| Original completion | 31 Dec 2023 |
| Revised completion | 23 Aug 2029 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹3,57,000 |
| Sanctioning authority | Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- Office Space168 51%
- 1 BHK58 18%
- 3 BHK33 10%
- SHOP31 9%
- 4 BHK22 7%
- Other15 4%
| Configuration | Units | Carpet area |
|---|---|---|
| OTHER | 8 | 61-272 |
| SHOP | 31 | 38-873 |
| 4 BHK | 22 | 444-458 |
| 3 BHK | 33 | 214-399 |
| PENTHOUSE | 7 | 859-876 |
| 1 BHK | 58 | 400-463 |
| Office Space | 168 | 43-1,416 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| Nexus Tower (Commercial) · OTHER, SHOP, Office Space | 16 | 48 | 57-495 |
| Office Tower-B · OTHER, SHOP, Office Space | 27 | 151 | 38-1,416 |
| Services Residence Tower-1 · OTHER, SHOP, 4 BHK, 3 BHK, PENTHOUSE | 36 | 67 | 214-1,030 |
| Services Residence Tower-2 · OTHER, SHOP, 1 BHK | 36 | 61 | 272-925 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots The Plot No. C -001/A, Sector 16B, Noida has been demarcated on site. |
| 2 | Boundary Wall 1.5 m to 2 m high Boundary Wall with elegant design Integrated with MS railing. |
| 3 | Road Work Peripheral loop of road (Carriageway from 6 m to 7.5 m of width) connecting to each tower |
| 4 | Footpaths Networks of Footpaths connects with various parts in the Landscape and Towers |
| 5 | Water Supply Including Drinking Water Facilities Potable water supply from the municipal water supply shall be collected in an underground collection tank and pumped to an overhead water tank. The supply of water to individual Units shall be from the said overhead water tanks. |
| 6 | Sewer System Centralized STP to treat Sewage and every tower has its own down-comers connected to main sewage line. |
| 7 | Drain Drainage through network of Pipe and Catch Basin to nearest Storm Water Drain and shall be connected to Noida Authority drain. |
| 8 | Parks Green area to be provided as per the approved plan. |
| 9 | Tree Planting The trees will be planted at all suitable locations of the project and along the boundary walls. The tree selection, flora, and vegetation shall be as per the climatic conditions. Trees will be planted in a manner to ensure that there is no hindrance to the services/ usage in the project. |
| 10 | Design For Electric Supply Including Street Lighting LED lights will be used for street lighting on external poles/lights proposed. |
| 11 | Community Buildings The community area is within the building footprint and will be developed as per the approved plan. |
| 12 | Treatment and Disposal System of Sewage and Sullage water Central STP for the entire Project and all towers shall be connected to STP. |
| 13 | Solid Waste Management And Disposal System Project shall have waste segregation area and OWC for treatment of organic waste. |
| 14 | Water Conservation System Rainwater harvesting pits , 10 in number, shall be provided for groundwater recharging and overflow to be discharged in the municipal drains. Treated sewage shall be used for irrigation and flushing. |
| 15 | Energy Management System Including Use of Renewable Energy A solar panel system of 150 KW will be used to reduce the energy consumption, and electrical appliances with a star rating will be used in the community building. |
| 16 | Fire Protection And Fire Safety System Sprinklers, fire doors, yard hydrants, smoke detectors, fire alarm system and external and internal hydrants will be provided as applicable aligned with applicable Fire norms |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Retail Ameneties shall be developed as per the approved plan. |
| 18 | Emergency Evacuation Services Fire staircases and Refuge areas shall be provided as per the approved fire drawing for evacuation to open areas. |
| 19 | Other Miscellaneous Work Proper Security system including Security Guard, CCTV Cameras and controlled access shall be provided. |
Permits & extensions
6 permits
An approval and the date it runs to - not proof the work matching it was done.
6 sanctioning permits are on record with UPRERA, the latest valid to 17 Jun 2031. All 6 carry a revalidation, the latest valid to 7 Dec 2030.
Sanctioned by Noida Authority · 34,697 sqm of land · an approved plan of 4 blocks and 327 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| NOIDA/BC/BP-IV-1309/468 | 24 Oct 2011 | 23 Oct 2016 | 7 Dec 2035 | 30 Jun 2024 | 8 Dec 2025 valid to 7 Dec 2030 as 2025/09/04/12961 | |
| 2025/09/04/12961 | 8 Dec 2025 | 7 Dec 2030 | 7 Dec 2035 | 30 Jun 2024 | 8 Dec 2025 | |
| 2025/09/04/12961 | 8 Dec 2025 | 7 Dec 2030 | 7 Dec 2035 | 30 Jun 2024 | 8 Dec 2025 | |
| 2025/09/04/12961 | 8 Dec 2025 | 7 Dec 2030 | 7 Dec 2035 | 30 Jun 2024 | 8 Dec 2025 | |
| 2026/04/28/13940 | 18 Jun 2026 | 17 Jun 2031 | 17 Jun 2036 | 23 Aug 2029 | 18 Jun 2026 | |
| 2026/04/28/13940 | 18 Jun 2026 | 17 Jun 2031 | 17 Jun 2036 | 23 Aug 2029 | 18 Jun 2026 |
| Document | File |
|---|---|
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
UPRERA’s record carries 2 completion extensions for this project, the latest running to 23 Aug 2029.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 Dec 2023 | 30 Jun 2024 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 2 | 30 Jun 2024 | 23 Aug 2029 | — |
Land & documents
4 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| - | - | — |
| C-001/A, Sector 16B, NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN-201301 | 34696.72 | Plot |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 29 Jun 2010.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| SN 2668 Book 1, Vol-1971, Pg 33 to 106 | 29 Jun 2010 | self | — |
| Lease deed · Lease Deed No. 2668 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Lease deed · Sub- Lease Deed No. 1811 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Lease deed · Sub-Lease Deed No. 1809 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 11 Aug 2017 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 26 Oct 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | AS PER SUPPLY |
| Fire safety (as filed with RERA) | YES, SPRINKLERS, FIRE TANKS, FHC, EFHC, FIRE TENDER PATH |
| Other facilities | POWER BACK UP THROUGH DG, ELECTRICAL AND LV SERVICES, AIR CONDITIONING, BASEMENT MECHANICAL VENTILLATION |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
25 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
25 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | 14% | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | 14% | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | 14% | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | 14% | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | 14% | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | 14% | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | 14% | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | 14% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | 14% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | 14% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | 14% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | 14% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | 14% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | 14% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | 14% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | 14% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | 14% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | 14% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | 14% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | 14% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | 14% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 14% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 14% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 14% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 14% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | BOULEVARD PROJECTS PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM9075 |
| PAN | AAECB1358H |
| CIN / TAN | U70200DL2010PTC203764 |
| Name of chairman | Anshul Gaurav |
| Registered address | Max House 1, Dr. Jha Marg, Okhla Phase 3, Okhla Industrial Estate, South Delhi, New Delhi, India - 110020 |
| RERA contact | |
| Registered since | 2017 |
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Boulevard Projects Pvt Ltd Collection Account for Delhi OneBankICICI BankBranchNoida - Sector 18Branch addressK1, Senior Mall, Sector 18, Noida, Uttar Pradesh - 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0000031Branch emailgbnoida[at]icici.bank.in, sharma.kom[at]icici.bank.in |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Boulevard Projects Pvt Ltd Separate Bank Account for Delhi OneBankICICI BankBranchNoida - Sector 18Branch addressK1, Senior Mall, Sector 18, Noida, Uttar Pradesh - 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0000031Branch emailGBONOIDA[at]icici.bank.in, sharma.kom[at]icici.bank.in |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Boulevard Projects Pvt Ltd RERA Transaction Account for Delhi OneBankICICI BankBranchNoida - Sector 18Branch addressK1, Senior Mall, Sector 18, Noida, Uttar Pradesh - 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0000031Branch emailgbnoida[at]icici.bank.in, sharma.kom[at]icici.bank.in |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 18 (Under Registration - 1 ) → 18 (Under Registration - 0 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 29 Sept 2026 |
Common questions about DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL
Is DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL RERA registered?
Yes. DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL is registered with UPRERA under registration number UPRERAPRJ9759, registered on 11 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL?
The completion date filed with UPRERA is 23 Aug 2029. No completion certificate is on record yet.
Who is the builder of DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL?
BOULEVARD PROJECTS PRIVATE LIMITED is the promoter entity that filed DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL with UPRERA (promoter RERA ID UPRERAPRM9075). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL more time to complete?
UPRERA's record carries 2 completion extensions for DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL, the latest running to 23 Aug 2029. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL located?
DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL?
The unit plan filed with UPRERA lists OTHER, SHOP, 4 BHK, 3 BHK, PENTHOUSE, 1 BHK and Office Space. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL?
The approved unit plan filed with UPRERA runs from 38 to 1,416 m² of carpet area (about 409 to 15,240 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL?
The approved unit plan describes 4 blocks and 327 units of which 128 are homes and 199 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is DELHI ONE TOWER B, FS HOTEL, RESI 1,2,3 AND RETAIL?
About 38 units per acre: 327 planned units across 8.57 acres (34,697 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗