Divyarv Grande

UPRERARegistered

Divyarv Grande is a RERA-registered commercial project by Sukadiv Projects LLP in Delta-II, Greater Noida, Gautam Budh Nagar (RERA ID UPRERAPRJ327475). Registered with a completion deadline of 18 Sept 2030.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
0%Q3'25
0%Q4'25
0.8%Q1'26
3.23%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ327475
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start25 Sept 2025
Project duration60 months
AddressPlot No SLC-8/G/4, Delta-II, Greater Noida, Dadri, Gautam Budh Nagar
TehsilDadri
Applicant typeLimited Liability Partnership (LLP)
Applicant addressTH 020, JAYPEE GREENS WISH TOWN, SECTOR 128 NOIDA, Maharishi Nagar, Gautam Budh Nagar, Noida, 201304, Uttar Pradesh, India
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    SM-23-May-202524907

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered17 Oct 2025
Original completion18 Sept 2030
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹34,000
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors215 · 1 · 24 (units from plan)
Homes · commercial units124 · 91 (shops and offices filed in the same plan)
  • STUDIO124 58%
  • SHOP91 42%
ConfigurationUnitsCarpet area
SHOP916-40
STUDIO1248-38
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Divyarv Grande · SHOP, STUDIO, OTHER242156-40
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Ar Rajesh Verma
License CA/93/16081
A-80, Rail Nagar, Sector 50, Noida, UP 201301
Engineer
Mr Rakesh Kumar Chugh
87, Sector 30, Gurugram, Haryana 122001
Contractor
Mr Lukman
H-4, Road No NH4, New Friends Colony, Masuri Ghaziabad 201015
Sr.Development work declared to RERA
1Demarcation of Plots
East - Plot no 3, West- Plot no 5, North Delta )) Residential, South - Road
2Boundary Wall
Made of RCC, Brick Work with MS Railing and Gate. Side Boundary Wall of 2000 mm height and Front Boundary Wall of 1500 MM high with 500 high MS Railing
3Road Work
Total proposed development will be having approximate Road area of 906.21 Sq Meter and the Road will be made of Trimix Concrete and Pavers over the WMM /WBM.
4Footpaths
The Proposed development will be having Pavers, Natural stone like Granite/Marble and Tiles on footpaths/ alongside the road and the total area will approximately 135 Sq Meter.
5Water Supply Including Drinking Water Facilities
From GNIDA with WTP of adequate capacity as per design to cater the daily Water Requirement of 13,25,000 Liter per day.
6Sewer System
Sewerage and Sullage will be treated in multistage process at STP of 77 KLD Capacity. The process includes screening and grit removal, primary settling of the Solids, biological breakdown of organic matter and disinfection along with Advanced Filtration Treatment. Sludge will be separated and disposed of or reused, while the Final treated Water (effluent) will be reused in Horticulture and AC System or Discharged. The MBBR Technology will be most appropriate to be used.
7Drain
Overflow of rain Water harvesting pit to storm Water Drain of GNIDA is being proposed. Peak hourly discharge has been taken 78.29 Nu meters. One Number of Rain water Harvesting Pit is also proposed to be installed to recharge the Ground water.
8Parks
Green area is being provided as per GNIDA Norms. The Green Area Required as Total Site Area is 347.39 Sq Meter . However the Proposed Green Area is 348.49 Sq Meter.
9Tree Planting
Evergreen Tree Planted as per GNIDA Norms. 14 nos Trees are required as per the Development Authority Norms. Keeping the commitment of Green Noida, 16 nos of Evergreen Trees are Proposed for better and developed Green areas. The Details of Trees are mentioned in the Attached Landscape Plan.
10Design For Electric Supply Including Street Lighting
Electrical load calculated as per requirement and prevailing norms. Street Lighting with Energy saving LED Street Lights. are Proposed. Total Electrical is 1084 KVA with 0.95 Power Factor. The Proposed Transformer Capacity is 1275 KW with 0.85 Loading. One Number DG Set of 750 KVA is also Proposed with 0.5 Loading Factor.
11Community Buildings
Not Provided
12Treatment and Disposal System of Sewage and Sullage water
Sewage and Sullage will be treated in a Multistage Process at STP with Advanced Filtration system. Sludge is separated and will be used / disposed off, while the final treated water will be reused in Flushing, gardening and AC system. Separate Kitchen waste line connected to ETP through grease Trap
13Solid Waste Management And Disposal System
Separating waste into different categories at the source to facilitate reuse, recycling as per norms. The residue waste will be sent for processing or disposal Sites.
14Water Conservation System
Techniques and Technologies to manage the Water resources efficiently, aiming to reduce waste Rain Water Harvesting, reduction in wastage of Water by using Low Flow Fixtures.
15Energy Management System Including Use of Renewable Energy
Optimize energy distribution system to reduce wastage and overall energy usage by installing Low energy consuming Light Fixtures etc. Install Solar Panels and Install Heat Efficient glass to reduce heat gain.
16Fire Protection And Fire Safety System
Combination of strategies, equipment and protocols designated to prevent, detect, control, and suppress fires. Ensuring the safety of people and property. It consists Fire Safety Systems- Active and Passive Components. Active Components such as Fire Alarms, Sprinklers an Extinguishers, While Passive Systems like Fire Resistant Materials, and Fire Barriers, Contain and Limit Fire Spread. All Installations will as Per NBC norms to prevent the Fire incidences, effective Fire Detection and Fire Fighting Systems.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Physical Facilities and Services that Support public well being such as Handicap Toilet, Public Toilet, Drinking Water Facilities etc. Each Shopping Floor from Lower Ground Till Third Floor will be having Ladies and Gents Toilet and a Differently Abled Toilet at LG Floor. is being Provided. The total nos of Toilets are as per Statuary requirements
18Emergency Evacuation Services
To Move people from a high risk location to safe areas like Fire Refuge Balconies, Fire Escape Staircases ahve been provided as per NBC Norms. 5th Floor Refuge Balcony Area = 51.649 Sq Mts. 9th Floor Refuge Balcony Area = 51.649 Sq. Mts. 14th Floor Refuge Balcony Area = 45.598 Sq. Mts 18th Floor Refuge Balcony Area = 45.598 Sq. Mts. 21st Floor Refuge Balcony Area = 45.598 Sq. Mts.
19Other Miscellaneous Work
Not Applicable
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 18 Sept 2030.

Sanctioned by Greater Noida Authority · 2,313 sqm of land · an approved plan of 1 block and 215 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
SM-23-May-20252490719 Sept 202518 Sept 203018 Sept 203518 Sept 2030
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

27 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
SLC-8/G/42313.47Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Allotment letter from the authority · GNIDA/COM/CPS-03/2003-24/4864
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Lease deed · Serial No 16241 at Bahi No1 Jild No 47064 page no 29 to 74
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New8 Oct 2025 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New21 Sept 2025 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New21 Sept 2025 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New8 Oct 2025 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New8 Oct 2025 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New21 Sept 2025 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New21 Sept 2025 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New21 Sept 2025 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New10 Oct 2025 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New10 Oct 2025 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New21 Sept 2025 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New21 Sept 2025 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New8 Oct 2025 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New8 Oct 2025 ↗

Quarterly progress reports

4 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

4 quarterly progress reports are on file with UPRERA, covering 2025-Q2 to 2026-Q1.

QuarterConstructionCertificates
2025-Q20%CA ↗ · Arch ↗ · Eng ↗
2025-Q30%CA ↗ · Arch ↗ · Eng ↗
2025-Q40.8%CA ↗ · Arch ↗ · Eng ↗
2026-Q13.23%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSukadiv Projects LLP
RolePromoter · current
RERA IDUPRERAPRM382859
PANAFMFS2594E
CIN / TANMRTS33397A
Registered addressTH 020, JAYPEE GREENS WISH TOWN, SECTOR 128 NOIDA, Maharishi Nagar, Gautam Budh Nagar, Noida, 201304, Uttar Pradesh, India
RERA contact
Registered since2025
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
S P LLP Divyarv Grande Collection A/CBankHDFC Bank LimitedBranchSector 143, NoidaBranch addressShopno 126-129, Ground Floor, Gulshan Ikebana, Sector 143 Gautam Budh Nagar UP 201306Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0009629Branch emailprashanth.gupta@hdfcbank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
S P LLP Divyarv Grande Separate A/CBankHDFC Bank LimitedBranchSector 143, NoidaBranch addressShop No 126-129, Ground Floor Gulshan Ikebana, Sector 143, Gaytam Budh Nagar UP 201306Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0009629
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
S P LLP Divyarv Grande RERA Transact A/CBankHDFC Bank LimitedBranchSector 143 NoidaBranch addressShop Nno 126-129, Ground Floor Gulshan Ikebana, Sector 143, Gautam Budh Nagar, UP 201306Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0009629
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Divyarv Grande

Is Divyarv Grande RERA registered?

Yes. Divyarv Grande is registered with UPRERA under registration number UPRERAPRJ327475, registered on 17 Oct 2025. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Divyarv Grande?

The completion date filed with UPRERA is 18 Sept 2030. No completion certificate is on record yet.

Who is the builder of Divyarv Grande?

Sukadiv Projects LLP is the promoter entity that filed Divyarv Grande with UPRERA (promoter RERA ID UPRERAPRM382859). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Divyarv Grande have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Divyarv Grande located?

Divyarv Grande is registered in Delta-II, Greater Noida, Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in Divyarv Grande?

The unit plan filed with UPRERA lists SHOP, STUDIO and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Divyarv Grande?

The approved unit plan filed with UPRERA runs from 6 to 40 m² of carpet area (about 60 to 430 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Divyarv Grande?

The approved unit plan describes 1 block and 215 units of which 124 are homes and 91 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Divyarv Grande?

About 376 units per acre: 215 planned units across 0.57 acres (2,313 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗