DKUMARS Shree Niketan (Formerly Shree Niketan)

UPRERACompleted

DKUMARS Shree Niketan (Formerly Shree Niketan) is a RERA-registered residential project by D.KUMAR & COMPANY in Prayagraj (RERA ID UPRERAPRJ928855). RERA status: Completed on 14 Aug 2024.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Completed.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ928855
Project categoryResidential
Registration typeNew
RERA statusCompleted
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAllahabad Development Authority
Proposed start1 Feb 2021
Project duration47 months
AddressAllahabad **, Prayagraj
TehsilAllahabad **
Applicant typePartnership Firm
Applicant address14/22/28 New Elgin Road, Civil Lines, Prayagraj - 211 001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    137/Pra.Aa.(Ta.Sa.)/Zone-1/Gru.Hou./FAR/2019-20

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion certificate filed

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Completed.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered19 Mar 2021
Original completion31 Dec 2024
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary14 Aug 2024
Registration fee₹16,000
Sanctioning authorityAllahabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors50 · 1 · 9 (units from plan)
  • 4 BHK16 32%
  • 2 BHK16 32%
  • 3 BHK16 32%
  • 1 BHK2 4%
ConfigurationUnitsCarpet area
4 BHK16124-129
2 BHK1664-69
3 BHK1697-104
1 BHK235-36
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A · 4 BHK, 2 BHK, 3 BHK, 1 BHK95035-129
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Manish Gujral
License CA/97/21330
52/25 B, Muir Road , Prayagraj
Engineer
Dr. Santosh Kumar
7/121 (B), The Heritage, Swaroop Nagar, Kanpur-208002
Contractor
Self
14/22/28 New Elgin Road, Civil Lines Prayagraj
Sr.Development work declared to RERA
1Demarcation of Plots
Demarcated by 6 feet high Brick Boundary Wall.
2Boundary Wall
6 Feet high thick Brickwork and RCC work in the column and beam.
3Road Work
From the main entrance gate, we have CC / Cement tile road throughout the project.
4Footpaths
We would not provide any footpaths.
5Water Supply Including Drinking Water Facilities
We will provide an underground and Overhead water tank for the requirement of the allottees.
6Sewer System
Underground sewage pipe shall be provided. all sewage water shall be connected with the municipal sewerage system.
7Drain
Stormwater shall be provided. Stormwater from roads and other Landscape area shall be connected to the stormwater drain channel and go to the rainwater harvesting pit for recharge of the groundwater and overflow shall be connected with the municipal drain line.
8Parks
We will provide the green area with different activities and the green area will have gaming facilities for kids.
9Tree Planting
We will provide many types of trees all along the boundary wall and green area.
10Design For Electric Supply Including Street Lighting
We will design and implement the system as per the local electricity board and will consider the Centralized Transformer, HT Panel, LT Panel, Feeder Pillar, and DG back for common services like External Lighting, Fountain, STP, Pump Room, etc.
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
Underground sewage pipe shall be provided. all sewage water shall connect with the municipal sewage system.
13Solid Waste Management And Disposal System
There is a proper garbage collection area provided for the solid waste management.
14Water Conservation System
We will suggest to individuals to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the groundwater level.
15Energy Management System Including Use of Renewable Energy
We will use LED lights fitting in the external area. In the pump room also all the equipment shall have an energy-efficient motor. And we will suggest Individual also to use. A solar water heater for kitchen taps is also proposed.
16Fire Protection And Fire Safety System
This project has only Residential flats. Hence we will provide a Fire Fighting Facility in common areas while the individual owner can install their own system as per their and local authority requirement.
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
As per Norms
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 24 Sept 2025.

Sanctioned by Allahabad Development Authority · 2,161 sqm of land · an approved plan of 1 block and 50 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
137/Pra.Aa.(Ta.Sa.)/Zone-1/Gru.Hou./FAR/2019-2025 Sept 202024 Sept 202524 Sept 202831 Dec 2024
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

19 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
9/2 Tashkand Marg Prayagraj2161Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 5214
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 5213
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 775
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 2175
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 2518
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 5129
The registered deed by which the promoter bought the land.
PDF ↗
Khatauni extract · Reply to Query Letter
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Affidavit on new registration
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New11 Feb 2021 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New11 Feb 2021 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New11 Feb 2021 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New11 Feb 2021 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New10 Mar 2021 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New10 Mar 2021 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New10 Mar 2021 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New11 Feb 2021 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New2 Mar 2021 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New18 Mar 2021 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New16 Mar 2021 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New16 Mar 2021 ↗

Quarterly progress reports

16 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

16 quarterly progress reports are on file with UPRERA, covering 2020-Q4 to 2024-Q3.

QuarterConstructionCertificates
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameD.KUMAR & COMPANY
RolePromoter · current
RERA IDUPRERAPRM88044
PANAANFD3202A
CIN / TANALDD01835B
Registered address14/22/28 New Elgin Road, Civil Lines, Prayagraj - 211 001
RERA contact
Registered since2019
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameDINESH KUMAR AGARWAL
RoleCo-promoter
Applicant typeIndividual
Address14/22/28, New Elgin Road, Near Maruti Showroom Civil Lines Prayagraj 211001
RERA contact

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

2 of the 3 account headings UPRERA publishes are filed for this project: collection and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
D.KUMAR AND CO COLLECTION ACC FOR SHREE NIKETANBankSTATE BANK OF INDIABranchSME, PRAYAGRAJBranch addressSME, PRAYAGRAJBranch districtAllahabaadA/C no.IFSCSBIN0003126
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
D.KUMAR AND CO RERA TRANSACTION ACC FOR SHREE NIKETANBankSTATE BANK OF INDIABranchSME, PRAYAGRAJBranch addressSME, PRAYAGRAJBranch districtAllahabaadA/C no.IFSCSBIN0003126
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
RERA statusregistered → completed
changed in Estanzo’s record
21 Sept 2026
When these facts last moved
RERA statuschanged in Estanzo’s record · 21 Sept 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about DKUMARS Shree Niketan (Formerly Shree Niketan)

Is DKUMARS Shree Niketan (Formerly Shree Niketan) RERA registered?

Yes. DKUMARS Shree Niketan (Formerly Shree Niketan) is registered with UPRERA under registration number UPRERAPRJ928855, registered on 19 Mar 2021. Estanzo reproduces that filing; it does not verify the work behind it.

Has DKUMARS Shree Niketan (Formerly Shree Niketan) been completed?

UPRERA lists DKUMARS Shree Niketan (Formerly Shree Niketan) as completed, with a completion certificate dated 14 Aug 2024, against a filed deadline of 31 Dec 2024.

Who is the builder of DKUMARS Shree Niketan (Formerly Shree Niketan)?

D.KUMAR & COMPANY is the promoter entity that filed DKUMARS Shree Niketan (Formerly Shree Niketan) with UPRERA (promoter RERA ID UPRERAPRM88044). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does DKUMARS Shree Niketan (Formerly Shree Niketan) have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is DKUMARS Shree Niketan (Formerly Shree Niketan) located?

DKUMARS Shree Niketan (Formerly Shree Niketan) is registered in Prayagraj, as filed with UPRERA.

What configurations are available in DKUMARS Shree Niketan (Formerly Shree Niketan)?

The unit plan filed with UPRERA lists 4 BHK, 2 BHK, 3 BHK and 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in DKUMARS Shree Niketan (Formerly Shree Niketan)?

The approved unit plan filed with UPRERA runs from 35 to 129 m² of carpet area (about 372 to 1,387 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in DKUMARS Shree Niketan (Formerly Shree Niketan)?

The approved unit plan describes 1 block and 50 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is DKUMARS Shree Niketan (Formerly Shree Niketan)?

About 94 units per acre: 50 planned units across 0.53 acres (2,161 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗