DKUMARS Shree Niketan (Formerly Shree Niketan) is a RERA-registered residential project by D.KUMAR & COMPANY in Prayagraj (RERA ID UPRERAPRJ928855). RERA status: Completed on 14 Aug 2024.
RERA status as reported: Completed.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ928855 |
| Project category | Residential |
| Registration type | New |
| RERA status | Completed |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Allahabad Development Authority |
| Proposed start | 1 Feb 2021 |
| Project duration | 47 months |
| Address | Allahabad **, Prayagraj |
| Tehsil | Allahabad ** |
| Applicant type | Partnership Firm |
| Applicant address | 14/22/28 New Elgin Road, Civil Lines, Prayagraj - 211 001 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
137/Pra.Aa.(Ta.Sa.)/Zone-1/Gru.Hou./FAR/2019-20
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion certificate filed
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 19 Mar 2021 |
| Original completion | 31 Dec 2024 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 14 Aug 2024 |
| Registration fee | ₹16,000 |
| Sanctioning authority | Allahabad Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 4 BHK16 32%
- 2 BHK16 32%
- 3 BHK16 32%
- 1 BHK2 4%
| Configuration | Units | Carpet area |
|---|---|---|
| 4 BHK | 16 | 124-129 |
| 2 BHK | 16 | 64-69 |
| 3 BHK | 16 | 97-104 |
| 1 BHK | 2 | 35-36 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| A · 4 BHK, 2 BHK, 3 BHK, 1 BHK | 9 | 50 | 35-129 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Demarcated by 6 feet high Brick Boundary Wall. |
| 2 | Boundary Wall 6 Feet high thick Brickwork and RCC work in the column and beam. |
| 3 | Road Work From the main entrance gate, we have CC / Cement tile road throughout the project. |
| 4 | Footpaths We would not provide any footpaths. |
| 5 | Water Supply Including Drinking Water Facilities We will provide an underground and Overhead water tank for the requirement of the allottees. |
| 6 | Sewer System Underground sewage pipe shall be provided. all sewage water shall be connected with the municipal sewerage system. |
| 7 | Drain Stormwater shall be provided. Stormwater from roads and other Landscape area shall be connected to the stormwater drain channel and go to the rainwater harvesting pit for recharge of the groundwater and overflow shall be connected with the municipal drain line. |
| 8 | Parks We will provide the green area with different activities and the green area will have gaming facilities for kids. |
| 9 | Tree Planting We will provide many types of trees all along the boundary wall and green area. |
| 10 | Design For Electric Supply Including Street Lighting We will design and implement the system as per the local electricity board and will consider the Centralized Transformer, HT Panel, LT Panel, Feeder Pillar, and DG back for common services like External Lighting, Fountain, STP, Pump Room, etc. |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water Underground sewage pipe shall be provided. all sewage water shall connect with the municipal sewage system. |
| 13 | Solid Waste Management And Disposal System There is a proper garbage collection area provided for the solid waste management. |
| 14 | Water Conservation System We will suggest to individuals to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the groundwater level. |
| 15 | Energy Management System Including Use of Renewable Energy We will use LED lights fitting in the external area. In the pump room also all the equipment shall have an energy-efficient motor. And we will suggest Individual also to use. A solar water heater for kitchen taps is also proposed. |
| 16 | Fire Protection And Fire Safety System This project has only Residential flats. Hence we will provide a Fire Fighting Facility in common areas while the individual owner can install their own system as per their and local authority requirement. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services As per Norms |
| 19 | Other Miscellaneous Work NA |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 24 Sept 2025.
Sanctioned by Allahabad Development Authority · 2,161 sqm of land · an approved plan of 1 block and 50 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 137/Pra.Aa.(Ta.Sa.)/Zone-1/Gru.Hou./FAR/2019-20 | 25 Sept 2020 | 24 Sept 2025 | 24 Sept 2028 | 31 Dec 2024 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
19 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 9/2 Tashkand Marg Prayagraj | 2161 | Plot |
| Sale deed · 5214 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 5213 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 775 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 2175 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 2518 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 5129 The registered deed by which the promoter bought the land. | PDF ↗ |
| Khatauni extract · Reply to Query Letter An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Affidavit on new registration An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 11 Feb 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 11 Feb 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 11 Feb 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 11 Feb 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 10 Mar 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 10 Mar 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 10 Mar 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 11 Feb 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 2 Mar 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 18 Mar 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 16 Mar 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 16 Mar 2021 ↗ |
Quarterly progress reports
16 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
16 quarterly progress reports are on file with UPRERA, covering 2020-Q4 to 2024-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | D.KUMAR & COMPANY |
| Role | Promoter · current |
| RERA ID | UPRERAPRM88044 |
| PAN | AANFD3202A |
| CIN / TAN | ALDD01835B |
| Registered address | 14/22/28 New Elgin Road, Civil Lines, Prayagraj - 211 001 |
| RERA contact | |
| Registered since | 2019 |
| Legal name | DINESH KUMAR AGARWAL |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | 14/22/28, New Elgin Road, Near Maruti Showroom Civil Lines Prayagraj 211001 |
| RERA contact |
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
2 of the 3 account headings UPRERA publishes are filed for this project: collection and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | D.KUMAR AND CO COLLECTION ACC FOR SHREE NIKETANBankSTATE BANK OF INDIABranchSME, PRAYAGRAJBranch addressSME, PRAYAGRAJBranch districtAllahabaadA/C no.IFSCSBIN0003126 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | D.KUMAR AND CO RERA TRANSACTION ACC FOR SHREE NIKETANBankSTATE BANK OF INDIABranchSME, PRAYAGRAJBranch addressSME, PRAYAGRAJBranch districtAllahabaadA/C no.IFSCSBIN0003126 |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| RERA status | registered → completed changed in Estanzo’s record | 21 Sept 2026 |
| RERA status | changed in Estanzo’s record · 21 Sept 2026 |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about DKUMARS Shree Niketan (Formerly Shree Niketan)
Is DKUMARS Shree Niketan (Formerly Shree Niketan) RERA registered?
Yes. DKUMARS Shree Niketan (Formerly Shree Niketan) is registered with UPRERA under registration number UPRERAPRJ928855, registered on 19 Mar 2021. Estanzo reproduces that filing; it does not verify the work behind it.
Has DKUMARS Shree Niketan (Formerly Shree Niketan) been completed?
UPRERA lists DKUMARS Shree Niketan (Formerly Shree Niketan) as completed, with a completion certificate dated 14 Aug 2024, against a filed deadline of 31 Dec 2024.
Who is the builder of DKUMARS Shree Niketan (Formerly Shree Niketan)?
D.KUMAR & COMPANY is the promoter entity that filed DKUMARS Shree Niketan (Formerly Shree Niketan) with UPRERA (promoter RERA ID UPRERAPRM88044). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does DKUMARS Shree Niketan (Formerly Shree Niketan) have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is DKUMARS Shree Niketan (Formerly Shree Niketan) located?
DKUMARS Shree Niketan (Formerly Shree Niketan) is registered in Prayagraj, as filed with UPRERA.
What configurations are available in DKUMARS Shree Niketan (Formerly Shree Niketan)?
The unit plan filed with UPRERA lists 4 BHK, 2 BHK, 3 BHK and 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in DKUMARS Shree Niketan (Formerly Shree Niketan)?
The approved unit plan filed with UPRERA runs from 35 to 129 m² of carpet area (about 372 to 1,387 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in DKUMARS Shree Niketan (Formerly Shree Niketan)?
The approved unit plan describes 1 block and 50 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is DKUMARS Shree Niketan (Formerly Shree Niketan)?
About 94 units per acre: 50 planned units across 0.53 acres (2,161 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗