DWARIKA GALAXY is a RERA-registered residential project by RADHIKA BUILDTECH PRIVATE LIMITED in Agra (RERA ID UPRERAPRJ868408). Registered with a completion deadline of 23 Jul 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ868408 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Agra Development Authority |
| Proposed start | 1 Oct 2021 |
| Project duration | 58 months |
| Address | Agra, Agra |
| Tehsil | Agra |
| Applicant type | Company |
| Applicant address | SHOP NO. 5, FIRST FLOOR, VASHISHT COMM.COMPLEX OPP. SHRIRAM MANDIR, BYE PASS ROAD, AGRA UP 282004 IN |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
Plotted Developmnent/01051/ADA/LD/20-21/1109/23032021
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion certificate filed
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 22 Dec 2021 |
| Original completion | 23 Jul 2026 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 15 Jul 2024 |
| Registration fee | ₹76,500 |
| Sanctioning authority | Agra Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots There are Total of 94 Plots as per Sanctioned map by Agra Development Authority. All the Plots will be demarcated as per the Size and alignment of the plots will are being done as per the approved map. |
| 2 | Boundary Wall The boundary wall of approximately 6 feet height topped by the Iron grill will be constructed along the project boundary . The boundary wall will be constructed with brick and mortar. The wall will be plastered and painted . The wall will be earth quake resistant. |
| 3 | Road Work Flexible Pavement with Compacted Subgrade, 150mm Compacted Granular Sbu-base, topped with Water Bound Macadam and 20mm Pre-mix carpet as wearing course. The Slopes- Longitudinal and transverse will be maintained to assist smooth ride and quick removal of water. |
| 4 | Footpaths Compacted Earth Topped with 50-75 mm sand bed and then 4to6 inches interlocking paver tiles to assist safe walking with anti skid all weather surface. The Strength of Paving blocks will be approximately M-10 |
| 5 | Water Supply Including Drinking Water Facilities Ground water will be pumped through a submersible pump. The Portable water will be lead to Overhead tank. From there the water will travel to individual units through an underground piping arrangement. The slopes will be so maintained to create desired head at each unit. |
| 6 | Sewer System Sewer lines to be laid over PCC 150mm Thk maintaining the invert level, the level difference at inlet and end crossing trough man holes for inspection. 600mm dia. hume pipes to be laid for the easy removal of the domestic sewer. |
| 7 | Drain Lined Surface and subsurface drains will be laid over PCC. The Trapezium shaped trains are laid to slopes to ensure rapid flow of drain water. The design is done to avoid any leaks from the drains. |
| 8 | Parks Park will be laid as per the layout approved by Agra development Authority. The lush green park will also be having sitting and playing area. |
| 9 | Tree Planting Multiple type of trees will be planted in the projects common areas, along the boundary wall and the periphery of the park. The plants selected will such as to have long life without causing any hindrance to the service activity of the project |
| 10 | Design For Electric Supply Including Street Lighting The Electrical Design for the domestic usage and common areas of the project will be provided by the electrical department. The separate transformer and the electrical room will be provided for the project. 4.5 meter high street lights will be installed and the electrical connection will be provided to each unit through distribution box |
| 11 | Community Buildings Not Applicable |
| 12 | Treatment and Disposal System of Sewage and Sullage water State-of-the-art- Sewage treatment plant will e installed in the project with multi stage treatment option to treat the domestic waste to permissible effluents limits before being disposed to the designated area. |
| 13 | Solid Waste Management And Disposal System Dalab ghar is to be constructed in the project for solid waste management. in additions garbage collection bins will be installed at common areas to keep the project premise clean. |
| 14 | Water Conservation System Rain water harvesting pit/s will be constructed in the project to collect storm and rain water. The water will be collected in the collection chamber which will be put through series of granular filtration inclusive of charcoal to clear the water. which will the be taken down to the water table through perforate PVC pipe |
| 15 | Energy Management System Including Use of Renewable Energy Not Applicable- Still all the common energy consumptions will be reduced trough better technologies. |
| 16 | Fire Protection And Fire Safety System Not Applicable |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Not Applicable |
| 18 | Emergency Evacuation Services Not Applicable |
| 19 | Other Miscellaneous Work As per project Requirement |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 23 Jul 2026.
Sanctioned by Agra Development Authority · 14,267 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| Plotted Developmnent/01051/ADA/LD/20-21/1109/23032021 | 24 Jul 2021 | 23 Jul 2026 | 22 Jul 2029 | 23 Jul 2026 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
36 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| Plot at Kh. No. 258, Mauja Dehtora, Agra | 1504.98 | Plot |
| Plot at Kh.No. 258, Mauja Dehtora, Agra | 1839.42 | Plot |
| Plot at Kh. No. 258, Mauja Dehtora, Agra | 3650 | Plot |
| Land at Kh. no 258, Mauja Dehtora, Agra | 969.875 | Khasra |
| land at Kh. No. 258, Mauja Dehtora, Agra | 1002.38 | Khasra |
| land at Kh. No. 258, Mauja Dehtora, Agra | 3000 | Khasra |
| Plot No. B-27 and B-28, Kh.No. 258, Mauja Dehtora, Agra | 297.27 | Plot |
| Plot No. A-18 and A-19, Kh. No. 258, Mauja Dehtora,, Agra | 167.22 | Plot |
| Plot No. B-36, Kh.No. 258, Mauja Dehtora, Agra | 125.41 | Plot |
| Plot No. B-33, Kh.No. 258, Mauja Dehtora, Agra | 125.55 | Plot |
| Plot No. B-37, Kh. No. 258, Mauja Dehtora, Agra | 125.41 | Plot |
| Plot No. B-32, Kh. No. 258, Mauja Dehtora, Agra | 125.41 | Plot |
| Plot No. C-29, Kh.No. 258, Mauja Dehtora, Agra | 167.22 | Plot |
| Plot no. B-25, Kh. No. 258, Mauja Dehtora, Agra | 125.41 | Plot |
| Plot No. B-22, Kh. No. 258, Mauja Dehtora, Agra | 125.41 | Plot |
| Plot No. B-24, Kh. No. 258, Mauja Dehtora, Agra | 125.41 | Plot |
| Plot Np. A-25, Kh.No.258, Mauja Dehtora, Agra | 104.51 | Plot |
| Plot No. C-6, Kh.No. 258, Mauja Dehtora, Agra | 196.90 | Plot |
| Plot No. A-47, Kh.No. 258, Mauja Dehtora, Agra | 104.51 | Plot |
| Plot No. B-29, Kh. no. 258, Mauja Dehtora, Agra | 125.41 | Plot |
| Plot No. C-32, Kh.No. 258, Mauja Dehtora, Agra | 183.94 | Plot |
| Plot no. A-36, Kh. No. 258, Mauja Dehtora, Agra | 83.61 | Plot |
| Registry document · 15088 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 15089 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 16755 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9623 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9621 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9622 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6254 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9594 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 10146 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 10145 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 10421 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 10504 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 10432 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 10542 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 10567 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 10543 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 13888 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 158 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 157 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5894 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6260 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6252 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1425-1430 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 7 Dec 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 6 Dec 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 6 Dec 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 5 Dec 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 2 Dec 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 2 Dec 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 2 Dec 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 2 Dec 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 2 Dec 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 2 Dec 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 6 Dec 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 6 Dec 2021 ↗ |
Quarterly progress reports
18 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
18 quarterly progress reports are on file with UPRERA, covering 2021-Q3 to 2025-Q4.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | RADHIKA BUILDTECH PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM155176 |
| PAN | AADCR3597B |
| CIN / TAN | U45201UP2006PTC031218 |
| Name of chairman | MAHESH CHAND AGARWAL |
| Registered address | SHOP NO. 5, FIRST FLOOR, VASHISHT COMM.COMPLEX OPP. SHRIRAM MANDIR, BYE PASS ROAD, AGRA UP 282004 IN |
| RERA contact | |
| Registered since | 2021 |
| Legal name | RADHIKA INFRASYS PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | PLOT NO. 351/218, NEERAV NIKUNJ, MAUZA KAKRETHA, SIKANDRA AGRA Agra UP 282007 IN |
| RERA contact |
| Legal name | RADHEYSHYAM INFRADEVELOPERS PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | SHOP NO. 5, FIRST FLOOR, VASHISHT COMM.COMPLEX OPP. SHRIRAM MANDIR, BYE PASS ROAD AGRA UP 282005 IN |
| RERA contact |
Nearby projects
Agra
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Radhika Buildtech Pvt. Ltd. Collection Account For Dwarika GalaxyBankCanara BankBranchSSI, Branch, AgraBranch addressG Block No.1, Sanjay Place Agra-282002Branch districtAgraA/C no.IFSCCNRB0002376 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Radhika Buildtech Pvt. Ltd. Separate Account For Dwarika GalaxyBankCanara BankBranchSSI Branch, AgraBranch addressG Block No.1, Sanjay Place, Agra 282002Branch districtAgraA/C no.IFSCCNRB0002376 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Radhika Buildtech Pvt. Ltd. Transaction Account For Dwarika GalaxyBankCanara BankBranchSSI Branch, AgraBranch addressG Block No. 1, Sanjay Place Agra, 282002A/C no.IFSCCNRB0002376 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about DWARIKA GALAXY
Is DWARIKA GALAXY RERA registered?
Yes. DWARIKA GALAXY is registered with UPRERA under registration number UPRERAPRJ868408, registered on 22 Dec 2021. Estanzo reproduces that filing; it does not verify the work behind it.
Has DWARIKA GALAXY been completed?
UPRERA still lists DWARIKA GALAXY as Registered, so it is not shown as completed here. A completion certificate dated 15 Jul 2024 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of DWARIKA GALAXY?
RADHIKA BUILDTECH PRIVATE LIMITED is the promoter entity that filed DWARIKA GALAXY with UPRERA (promoter RERA ID UPRERAPRM155176). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does DWARIKA GALAXY have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is DWARIKA GALAXY located?
DWARIKA GALAXY is registered in Agra, as filed with UPRERA.