Eldeco City Phase I is a RERA-registered residential project by ELDECO INFRABUILD LIMITED in Bareilly (RERA ID UPRERAPRJ712792). Registered with a completion deadline of 30 Jun 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ712792 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Bareily Development Authority |
| Proposed start | 1 Mar 2020 |
| Project duration | 76 months |
| Address | Bareilly, Bareilly |
| Tehsil | Bareilly |
| Applicant type | Company |
| Applicant address | 201-212, 2nd Floor, Splendor Forum, Jasola District Centre, New Delhi -110025 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Permit revalidated (2)
3 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 6 Aug 2020 |
| Original completion | 30 Jun 2026 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹2,84,500 |
| Sanctioning authority | Bareily Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Done |
| 2 | Boundary Wall R.C.C & Brick work Structure with MS railing & with Plaster Finish & paint. As per Plan |
| 3 | Road Work 2 layer WBM, CC Pavers on top and Kerb stone etc |
| 4 | Footpaths Pavers over a base of PCC |
| 5 | Water Supply Including Drinking Water Facilities Water supply through Bore Well/ Municipal supply collected in under ground water tank and pumped to Overhead water tank, further distribution from Over Head tank to individual units under gravity |
| 6 | Sewer System Sewer system with RCC NP2 pipes connected to STP, treated water will be used for gardening and flushing, excess treated water would be disposed in Municipal line. |
| 7 | Drain Storm water Drain System with RCC NP2 pipes connected to Rain water harvesting pits. |
| 8 | Parks Parks will be provided as per approved plan |
| 9 | Tree Planting Tree planting will be provided as per approved plan |
| 10 | Design For Electric Supply Including Street Lighting Electrical supply including street light (GI poles) will be provided as per the Scheme approval. |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water Sewer system with RCC NP2 pipes connected to STP, treated water will be used for gardening and flushing, excess treated water would be disposed in Municipal line. |
| 13 | Solid Waste Management And Disposal System Would be provided as per guidelines given in EC approval. |
| 14 | Water Conservation System Rain water harvesting pits are planned (as required) for recharging of under ground water aquifers |
| 15 | Energy Management System Including Use of Renewable Energy Solar panel will be used as far as possible for energy conservation. CFL/ LED bulbs would be used for common area lighting. |
| 16 | Fire Protection And Fire Safety System Fire Hydrant would be provided as per norms |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Would be provided as per guidelines given in EC approval |
| 18 | Emergency Evacuation Services NA |
| 19 | Other Miscellaneous Work Boundary wall and main gate would be constructed for security of the complex, CCTV camera would be used on main gate for visitor monitoring |
Registered agents
10 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | Alka Srivastava | UPRERAAGT19188 |
| 2 | Amit Agarwal | UPRERAAGT17774 |
| 3 | Anup Singh Khelal | UPRERAAGT15672 |
| 4 | Ashutosh Sharma | UPRERAAGT19169 |
| 5 | Madhav Manocha | UPRERAAGT18785 |
| 6 | MUNNI DEVI | UPRERAAGT19147 |
| 7 | Rohit Ahuja | UPRERAAGT22113 |
| 8 | SACHIN GUPTA | UPRERAAGT15619 |
| 9 | SANJAY KUMAR TIRKHA | UPRERAAGT19160 |
| 10 | VISHAL JAUHRI | UPRERAAGT14898 |
Permits & extensions
3 permits
An approval and the date it runs to - not proof the work matching it was done.
3 sanctioning permits are on record with UPRERA, the latest valid to 23 May 2024. 2 of them carry a revalidation.
Sanctioned by Bareily Development Authority · 55,863 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| MAP20180928114059417 | 24 May 2019 | 23 May 2024 | 22 May 2027 | 30 Jun 2026 | — | |
| MAP20180928114059417 | 24 May 2019 | 23 May 2024 | 31 Dec 2026 | 30 Jun 2026 | 24 May 2019 | |
| MAP20180928114059417 | 24 May 2019 | 23 May 2024 | 31 Dec 2026 | 30 Jun 2026 | 24 May 2019 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
29 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 476P | 2572.01 | Khasra |
| 477P | 735.85 | Khasra |
| 501P | 5.25 | Khasra |
| 502P | 229.39 | Khasra |
| 503P | 15626.77 | Khasra |
| 506P | 2279.58 | Khasra |
| 507P | 1120.12 | Khasra |
| 509P | 2518.84 | Khasra |
| 513P | 499 | Khasra |
| 898 | 1861.29 | Khasra |
| 439P | 5347.44 | Khasra |
| 440 | 916 | Khasra |
| 512P | 22334.16 | Khasra |
| Sale deed · 700 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 699 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 6822 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 2484 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 9840 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 9838 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 11879 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 11082 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 2485 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 8300 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 8300 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 8457 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 8301 The registered deed by which the promoter bought the land. | PDF ↗ |
| Khatauni extract · 14231428 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · 186 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Sale deed · 3012 The registered deed by which the promoter bought the land. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 15 Feb 2020 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 15 Jul 2020 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 20 Jul 2020 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 20 Jul 2020 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 12 Feb 2020 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 27 Feb 2020 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 29 Feb 2020 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 27 Feb 2020 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 26 Feb 2020 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 13 Jul 2020 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 15 Feb 2020 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 15 Feb 2020 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 15 Feb 2020 ↗ |
Quarterly progress reports
25 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
25 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | ELDECO INFRABUILD LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM93592 |
| PAN | AAFCA9265K |
| CIN / TAN | DELA19219E |
| Name of chairman | Mohan Singh Rawat |
| Registered address | 201-212, 2nd Floor, Splendor Forum, Jasola District Centre, New Delhi -110025 |
| RERA contact | |
| Registered since | 2019 |
| Legal name | WELCOME INFRA DEVELOPERS PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | 201-212, 2nd Floor, Splendor Forum, Jasola District Centre, New Delhi -110025 |
| RERA contact |
| Legal name | POPULAR INFRATECH PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | 201-212, 2nd Floor, Splendor Forum, Jasola District Centre, New Delhi -110025 |
| RERA contact |
| Legal name | WELCOME INFRABUILD PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | 201-212, 2nd Floor, Splendor Forum, Jasola District Centre, New Delhi -110025 |
| RERA contact |
| Legal name | MARS BUILDTECH PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | 201-212, 2nd Floor, Splendor Forum, Jasola District Centre, New Delhi -110025 |
| RERA contact |
| Legal name | BANYAN INFRACON PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | 201-212, 2nd Floor, Splendor Forum, Jasola District Centre, New Delhi -110025 |
| RERA contact |
| Legal name | GLAZE REALTECH PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | 201-212, 2nd Floor, Splendor Forum, Jasola District Centre, New Delhi -110025 |
| RERA contact |
Nearby projects
Bareilly
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | ELDECO INFRABUILD LTD. RERA PROJECT ESCROW ACCOUNTBankHDFC BANK LTD.BranchPRIYADARSHINI NAGAR BAREILLYA/C no.IFSCHDFC0000860 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Eldeco City Phase I
Is Eldeco City Phase I RERA registered?
Yes. Eldeco City Phase I is registered with UPRERA under registration number UPRERAPRJ712792, registered on 6 Aug 2020. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Eldeco City Phase I?
The completion date filed with UPRERA is 30 Jun 2026. No completion certificate is on record yet.
Who is the builder of Eldeco City Phase I?
ELDECO INFRABUILD LIMITED is the promoter entity that filed Eldeco City Phase I with UPRERA (promoter RERA ID UPRERAPRM93592). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Eldeco City Phase I have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Eldeco City Phase I located?
Eldeco City Phase I is registered in Bareilly, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗