EWS CITY 2

UPRERARegistered

EWS CITY 2 is a RERA-registered residential project by SGS CONSTRUCTION & DEVELOPERS PRIVATE LIMITED in Village Shahbad urf Mithepur and Village Mirzapur, Ghaziabad (RERA ID UPRERAPRJ242345). Registered with a completion deadline of 5 Dec 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
9.59%Q4'24
9.59%Q1'25
9.59%Q2'25
9.59%Q3'25
25.32%Q4'25
43.22%Q1'26
64.05%Q2'26
—Q3'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ242345
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start1 Nov 2024
Project duration26 months
AddressKhasra No. 44M and 45 at Village Shahbad urf Mithepur, Khasra No. 123, 124, 125, 126 and 129 at Village Mirzapur, NH-24, Ghaziabad, Village Shahbad urf Mithepur and Village Mirzapur, Ghaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant addressR-10, Green Park Main, New Delhi - 110016
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    229 MAP No. 17/PMAY GDA/M.P./2018-19

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered3 Oct 2025
Original completion6 Aug 2026
Revised completion5 Dec 2026
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹93,000
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors1,493 · 3 · 19 (units from plan)
ConfigurationUnitsCarpet area
1 BHK1,49323-23
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
PMAY EWS Block 1 · 1 BHK1956623-23
PMAY EWS Block 2 · 1 BHK1956623-23
PMAY EWS Block 3 · 1 BHK1936123-23
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Ar.J. Mamtha
License CA/2005/37087
SF-A, 2nd Floor, Prakruthi Royale Appartments, No.6, 13th main, Ganganagar, Hebbal Post, Bangalore-560024
Engineer
Er. Vinod Kumar
Registered Office No. 47, 19th A cross, Bhuvneshwari Nagar, Hebbal, Kempapura, Bangalore- 560024, Karnataka, India
Contractor
Prestige Projects Pvt. Ltd.
Prestige Falcon Tower no. 19, Brunton Road, Bangalore, Karnataka, India, 560025
Sr.Development work declared to RERA
1Demarcation of Plots
TOTAL PLOT AREA - 17589.02 SQMT, PMAY SCHEME AT VILLAGE SHAHBAD URF MITHEPUR, KHASRA NO. 44M, 45 VILLAGE MIRZAPUR, KHASRA NO. 123,124,125,126,129 NEAR INDIRAPURAM NH24
2Boundary Wall
LENGTH- 255 MTR, HEIGHT- 2.4 meter high wall, MATERIAL- RCC/BLOCKWORK WITH PAINT FINISH
3Road Work
LENGTH- 256 MTR, WIDTH- 9 MTR, MATERIAL- All roads will be combination of concrete pavers and concrete.
4Footpaths
All footpath in the complex will be in combination of concrete pavers.
5Water Supply Including Drinking Water Facilities
Connections- 2 No, Tank capacity for EWS CITY 2- Domestic water tank - 300 KLD and Raw Water Tank- 300 KLD, Fire Water tank- 300 KLD, Hydrants- Yes Provided, Source of water- Municipal water supply. water treatment method- water treatment using dual media and activated carbon filters.
6Sewer System
Pipes are running in External Site plan by gravity, pipe size- 160/200/250/300mm Dia, pipe material IS 16098 UPVC SN-8/ DWC Manholes type (gravity)- as per external Site plan Network design.
7Drain
Length- 765-mtrs, Width- 450mm dia and 150 mm dia (Dia of pipe), storm water system is planned using pipe system, Pipe material- DWC SN8 Pipes for road crossings and areas subjected to vehicular loads. SN4 DWC pipes are generally suitable only for non-traffic zones or light-duty applications., Disposal method- Using rainwater harvesting and external drain.
8Parks
Number of Park- 01, AREA- 1941 SQMT
9Tree Planting
Evergreen trees as per local species in the variety of tall and wide spread bushes.
10Design For Electric Supply Including Street Lighting
Number of External poles/lights- Approx. 15 Nos, Transformer units-8 Nos, Type of lighting (Led/solar)-LED, Illumination design- Yes as per norms.
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
STP capacity (KLD)- 670 KLD, Number of treatment units- 1 No, type of STP- SBR, Treated water use - Flushing, horticulture, Regulatory compliance- As per norms.
13Solid Waste Management And Disposal System
Waste generated (Kg/Day)- 720 Kg/Day, Collected in organic waste convertor for treatment.
14Water Conservation System
Number and size of harvesting pits- 4 Nos. of 65 m3 capacity each, recharge wells- Provided, Water- efficient fixture- Reuse/recharge strategy -rain water will be used for ground water recharge, system efficiency- As per norms.
15Energy Management System Including Use of Renewable Energy
Provision of Energy Efficient Lighting of Common Areas is considered.
16Fire Protection And Fire Safety System
Number of hydrants - 11 Nos. (External), 225 Hydrants (internal), Sprinklers; system type (manual/automatic)- Automatic, NBC compliance - Yes.
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
Fire Staircases shall be provided as per the approved fire drawing for evacuation to open areas.
19Other Miscellaneous Work
As per approved plan.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 6 Aug 2026.

Sanctioned by Ghaziabad Development Authority · 17,589 sqm of land · an approved plan of 3 blocks and 1493 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
229 MAP No. 17/PMAY GDA/M.P./2018-197 Aug 20216 Aug 20266 Aug 20296 Aug 2026
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 5 Dec 2026.

#Granted fromExtended uptoNote
16 Aug 20265 Dec 2026Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026

Land & documents

17 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
As per sheet attached17589Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · Khasra wise Land Details
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4306 Part1 of Sale Deed
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4306 Part2 of Sale Deed
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4306 Part3 of Sale Deed
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 2909 Part1 of JDA
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 2909 Part2 of JDA
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4536 Addendum to JDA
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New2 Sept 2025 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New31 Aug 2025 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New31 Aug 2025 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New31 Aug 2025 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New23 Sept 2025 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New31 Aug 2025 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New31 Aug 2025 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New31 Aug 2025 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New2 Sept 2025 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New24 Sept 2025 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New23 Sept 2025 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New2 Sept 2025 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New31 Aug 2025 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New31 Aug 2025 ↗

Quarterly progress reports

8 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

8 quarterly progress reports are on file with UPRERA, covering 2024-Q3 to 2026-Q2.

QuarterConstructionCertificates
2024-Q39.59%CA ↗ · Arch ↗ · Eng ↗
2024-Q49.59%CA ↗ · Arch ↗ · Eng ↗
2025-Q19.59%CA ↗ · Arch ↗ · Eng ↗
2025-Q29.59%CA ↗ · Arch ↗ · Eng ↗
2025-Q325.32%CA ↗ · Arch ↗ · Eng ↗
2025-Q443.22%CA ↗ · Arch ↗ · Eng ↗
2026-Q164.05%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSGS CONSTRUCTION & DEVELOPERS PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM320581
PANAAHCS7169Q
CIN / TANU40101DL2001PTC112938
Name of chairmanMr. Venkata Sridevi Swarup Kumar Kurapati
Registered addressR-10, Green Park Main, New Delhi - 110016
RERA contact
Registered since2024
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal namePrestige Projects Pvt. Ltd.
RoleCo-promoter · current
RERA IDUPRERAPRM325805
Applicant typeCompany
PANAAECP7361E
CIN / TANU45201KA2008PTC046784
Name of chairmanZayd Noaman
Registered addressPrestige Falcon Tower no. 19, Brunton Road, Bangalore, Karnataka, India, 560025
RERA contact
Registered since2024

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
SGS Construction & Developers Private Limited Collection AC for EWS City 2BankICICI BankBranchGhaziabad- Indirapuram BranchBranch addressICICI Bank Ltd. AG- 1, Plot No. 3, Aditya City Centre, Vaibhav Khand, Indirapuram, Ghaziabad - 201012, UPBranch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0000718Branch emailtxbmgops@icicibank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
SGS Construction and Developers Private Limited Separate Bank AC for EWS City 2BankICICI BankBranchGhaziabad - Indirapuram BranchBranch addressICICI Bank Ltd. AG-1, Plot No. 3, Aditya City Centre, Vaibhav Khand, Indirapuram, Ghaziabad- 201012, UPBranch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0000718
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
SGS Construction and Developers Private Limited RERA Transaction AC for EWS City 2BankICICI BankBranchGhaziabad- Indirapuram BranchBranch addressICICI Bank Ltd. AG-1, Plot No. 3, Aditya City Centre, Vaibhav Khand, Indirapuram, Ghaziabad- 201012 UPBranch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0000718
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

4 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
19 Oct 2026
Revised completion date on file2026-12-06 → 2026-12-05
changed in Estanzo’s record
7 Sept 2026
Completion extension
no. 1 — extended upto
2026-12-06 → 2026-12-05
changed in Estanzo’s record
7 Sept 2026
Revised completion date on file2026-08-06 → 2026-12-06
changed in Estanzo’s record
5 Sept 2026
When these facts last moved
Revised completion date on filechanged in Estanzo’s record · 7 Sept 2026 · 2 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about EWS CITY 2

Is EWS CITY 2 RERA registered?

Yes. EWS CITY 2 is registered with UPRERA under registration number UPRERAPRJ242345, registered on 3 Oct 2025. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for EWS CITY 2?

The completion date filed with UPRERA is 5 Dec 2026. No completion certificate is on record yet.

Who is the builder of EWS CITY 2?

SGS CONSTRUCTION & DEVELOPERS PRIVATE LIMITED is the promoter entity that filed EWS CITY 2 with UPRERA (promoter RERA ID UPRERAPRM320581). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted EWS CITY 2 more time to complete?

UPRERA's record carries 1 completion extension for EWS CITY 2, the latest running to 5 Dec 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does EWS CITY 2 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is EWS CITY 2 located?

EWS CITY 2 is registered in Village Shahbad urf Mithepur and Village Mirzapur, Ghaziabad, as filed with UPRERA.

What configurations are available in EWS CITY 2?

The unit plan filed with UPRERA lists 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in EWS CITY 2?

The approved unit plan filed with UPRERA runs from 23 to 23 m² of carpet area (about 246 to 247 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in EWS CITY 2?

The approved unit plan describes 3 blocks and 1,493 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is EWS CITY 2?

About 344 units per acre: 1,493 planned units across 4.35 acres (17,589 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗