F PREMIERE (PHASE 1)

UPRERARegistered

F PREMIERE (PHASE 1) is a RERA-registered residential project by HOME AND SOUL INFRATECH PRIVATE LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ7115). Registered with a completion deadline of 31 Dec 2025.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Oct–Dec 2025
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q1'24
—Q2'24
—Q3'24
—Q4'24
—Q1'25
82.82%Q2'25
48.04%Q3'25
79.53%Q4'25

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ7115
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryYamuna Expressway Authority
Proposed start10 Oct 2014
Original start10 Oct 2014
Project duration135 months
AddressDadri, Gautam Budh Nagar
TehsilDadri
Applicant typeCompany
Applicant addressASPIRE 2-701, SUPERTECH EMERALD COURT, SECTOR 93B, NOIDA, (U.P.)
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. valid to

    Permit revalidated

    BP-55/1065

  2. 5 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. to

    Extension granted

  8. valid to

    Permit revalidated

    1175/2022

  9. to

    Extension granted

  10. valid to

    Permit revalidated

    Y.E.A./NIYOJAN-807/2024

  11. to

    Extension granted

  12. valid to

    Permit revalidated

    732/2024

  13. to

    Extension granted

  14. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  15. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered1 Aug 2017
Original completion30 Jun 2021
Revised completion31 Dec 2025
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary11 Jun 2026
Registration fee₹20,000
Sanctioning authorityYamuna Expressway Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors111 · 1 · 23 (units from plan)
ConfigurationUnitsCarpet area
2 BHK11161-67
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
TOWER C · 2 BHK2311161-67
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
MODARCHINDIA
License CA/98/22706
ARCHITECTURE, INTERIOR, ENVIRONMENTAL , PLOT NO.:-B-99 FIRST FLOOR, SECTOR-63 NOIDA
Engineer
OPTIMIZATION CONSULTANTS
202-203,HIMLAND HOUSE, KARAMPURA COMMERCIAL COMPLEX, NEW DELHI-110015
Contractor
CHAWLA TECHNO CONSTRUCT LIMITED
3, LOCAL SHOPPING CENTRE, UDAI PARK, NEW DELHI-110049,
Sr.Development work declared to RERA
1Demarcation of Plots
AS PER PLAN
2Boundary Wall
AS PER PLAN
3Road Work
AS PER PLAN
4Footpaths
AS PER PLAN
5Water Supply Including Drinking Water Facilities
Total water requirement is proposed to be catered by an underground tank . Potable Water will be supplied by Jaypee sports & treated water will be stored in compartment No -3 .RO unit proposed in each unit
6Sewer System
Soil & Waste from Toilet & Kitchen will be collected separately for soil & waster pipe line and after that sewer pipe line laid under ground with manhole & connected to Centralized STP of JP Sport City , Formula One
7Drain
Separate line for rain water with & Other line for soil & waste and connected to JP sport city line
8Parks
AS PER PLAN
9Tree Planting
AS PER PLAN
10Design For Electric Supply Including Street Lighting
Efficient & Effective design of substation with 100% Power back up & street light in walk way and parks . Adequate design to reduce losses in transmission & distribution .
11Community Buildings
AS PER PLAN
12Treatment and Disposal System of Sewage and Sullage water
Sewer water treatment through Centralized STP of Jaypee Sport City Township with their disposal arrangement
13Solid Waste Management And Disposal System
AS PER PLAN
14Water Conservation System
VFD based hydro pneumatic pumps used with sensor , treated STP water used for flushing & Horticulture
15Energy Management System Including Use of Renewable Energy
Pumps & equipment selected on best energy efficient point . Photoelectric senor used for external and common area light with provision of solar energy
16Fire Protection And Fire Safety System
Internal & external hydrant system , sprinklers, Heat Detector, smoke detector MCP & Fire Extinguishers in all floors . As per Fire norms
17Social Infrastructure And Other Public Amenities Including Public Health Services
AS PER PLAN
18Emergency Evacuation Services
AS PER PLAN
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

1 agent

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

5 permits

An approval and the date it runs to - not proof the work matching it was done.

5 sanctioning permits are on record with UPRERA, the latest valid to 9 Oct 2019. 4 of them carry a revalidation, the latest valid to 9 Oct 2024.

Sanctioned by Yamuna Expressway Authority · 2,997 sqm of land · an approved plan of 1 block and 111 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
BP-55/106510 Oct 201421 Feb 20199 Oct 202430 Jun 2021—
BP-55/106510 Oct 201421 Feb 201928 Sept 202428 Sept 20238 Jun 2022
valid to 28 Sept 2024
as 1175/2022
BP-55/106510 Oct 201421 Feb 201910 Jul 202530 Sept 20241 Oct 2024
valid to 9 Oct 2024
as 732/2024
BP-55/106510 Oct 20149 Oct 20199 Oct 202430 Sept 202410 Oct 2014
valid to 9 Oct 2024
BP-55/106510 Oct 201421 Feb 20199 Oct 202430 Sept 202430 Jul 2024
valid to 9 Oct 2024
as Y.E.A./NIYOJAN-807/2024
Plans and approvals filed with RERA
DocumentFile
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 5 completion extensions for this project, the latest running to 31 Dec 2025.

#Granted fromExtended uptoNote
130 Jun 202129 Dec 2021Six months extension in view of force majeure caused by covid-19 pandemic
229 Dec 202128 Sept 2023—
328 Sept 202330 Sept 2024—
430 Sept 202431 Mar 2025—
531 Mar 202531 Dec 2025—

Land & documents

9 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
GH-B32997Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 26769
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New16 Mar 2022 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New31 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New31 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New31 Jul 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old31 Jul 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old31 Jul 2017 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old31 Jul 2017 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old31 Jul 2017 ↗

Quarterly progress reports

23 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

23 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2025-Q3.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q182.82%CA ↗ · Arch ↗ · Eng ↗
2025-Q248.04%CA ↗ · Arch ↗ · Eng ↗
2025-Q379.53%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2025-Q3. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameHOME AND SOUL INFRATECH PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM2392
PANAACCV8946M
CIN / TANU45208DL2008PTC184425
Name of chairmanRAHUL RASTOGI (DIRECTOR)
Registered addressASPIRE 2-701, SUPERTECH EMERALD COURT, SECTOR 93B, NOIDA, (U.P.)
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
HOME & SOUL INFRATECH PVT LTD SEPARATE ESCROW BANK ACCOUNT FOR F-PREMIERE (PHASE 1)BankHDFC BANK LTDBranchSECTOR-18 HDFC BRANCHA/C no.IFSCHDFC0001592
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

4 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)55 (Under Registration - 3 ) → 56 (Under Registration - 4 )
changed in Estanzo’s record
19 Oct 2026
Promoter’s complaints tally (all their projects)54 (Under Registration - 2 ) → 55 (Under Registration - 3 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)54 (Under Registration - 3 ) → 54 (Under Registration - 2 )
changed in Estanzo’s record
23 Sept 2026
Promoter’s complaints tally (all their projects)53 (Under Registration - 2 ) → 54 (Under Registration - 3 )
changed in Estanzo’s record
9 Sept 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 19 Oct 2026 · 4 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about F PREMIERE (PHASE 1)

Is F PREMIERE (PHASE 1) RERA registered?

Yes. F PREMIERE (PHASE 1) is registered with UPRERA under registration number UPRERAPRJ7115, registered on 1 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has F PREMIERE (PHASE 1) been completed?

UPRERA still lists F PREMIERE (PHASE 1) as Registered, so it is not shown as completed here. A completion certificate dated 11 Jun 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of F PREMIERE (PHASE 1)?

HOME AND SOUL INFRATECH PRIVATE LIMITED is the promoter entity that filed F PREMIERE (PHASE 1) with UPRERA (promoter RERA ID UPRERAPRM2392). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted F PREMIERE (PHASE 1) more time to complete?

UPRERA's record carries 5 completion extensions for F PREMIERE (PHASE 1), the latest running to 31 Dec 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does F PREMIERE (PHASE 1) have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is F PREMIERE (PHASE 1) located?

F PREMIERE (PHASE 1) is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in F PREMIERE (PHASE 1)?

The unit plan filed with UPRERA lists 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in F PREMIERE (PHASE 1)?

The approved unit plan filed with UPRERA runs from 61 to 67 m² of carpet area (about 661 to 726 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in F PREMIERE (PHASE 1)?

The approved unit plan describes 1 block and 111 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is F PREMIERE (PHASE 1)?

About 150 units per acre: 111 planned units across 0.74 acres (2,997 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗