G.H.I. CITY -2

UPRERARegistered

G.H.I. CITY -2 is a RERA-registered residential project by CZAR BUILDCON PRIVATE LIMITED in Miyapur near TDI City Fatehabad Road Agra, Agra (RERA ID UPRERAPRJ937180). Registered with a completion deadline of 30 Sept 2028.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
16%Q2'25
36%Q3'25
45%Q4'25
51%Q1'26
61.5%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ937180
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAny Other Competent Authority
Proposed start1 May 2025
Project duration41 months
AddressA/55 part of Kh. no 93 , Miyapur, TDI City Phase 1, Agra -282006, Miyapur near TDI City Fatehabad Road Agra, Agra, Agra
TehsilAgra
Applicant typeCompany
Applicant addressH-69,UGF,OUTER CIRCLE ABOVE HDFC BANK, CONNAUGHT PLACE NEW DELHI DL 110001 IN
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    4887 ZILA PANCHAYAT AGRA

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered23 Feb 2026
Original completion30 Sept 2028
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,12,500
Sanctioning authorityAny Other Competent Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
RAHUL KUMAR
License CA/2018/97802
SHOP NO. 02 FIRST FLOOR BLOCK -C9, CLOTH MARKET , SANJAY PLACE , AGRA -282002
Engineer
AMIT NIGAM
PLOT NO. 153M SHIV SHAKTI ENCLAVE , SECTOR 81 , NOIDA , UP -201305
Contractor
ARYAN CONSTRUCTION
H NO. 01, H BLOCK, GOVARDHAN KUNJ OPP. BSF CAMP , BHONDSI GURUGRAM -122001
Sr.Development work declared to RERA
1Demarcation of Plots
LAYOUT OF THE SITE ACCORDING TO BOTH THE SURVEY AND THE APPROVED LAYOUT PLAN USING A TOTAL STATION , TOTAL NUMBER OF PLOTS ARE 236
2Boundary Wall
THE M30 RCC WALL WITH GRILLS , PRECAST BOUNDARY WALL OF 6 FEET HEIGHT, THE WHOLE PROJECT WILL BE FULLY SECURED BY A BOUNDARY
3Road Work
ROAD WILL BE FINISH WITH TRIMIX/ CONCRETE PAVERS AS PER DESIGN AND LAAID OVER COMPACTED EARTH , GRANULAR SBBASE (GSB), WBM, PCC ((1. 4.8) AND SAND BED, 11048 SQ MTRS OF ROAD AREA WITH 200 MM W.B.M ALONG WITH BITUMEN CARPETING
4Footpaths
SUFFICIENT AREA OF FOOTPATH HAS BEEN ALLOTTED FOR PEDESTRIAN USE.
5Water Supply Including Drinking Water Facilities
THE PORTABLE WATER SUPPLY OF DESIREDQUALITY AND PURITY SHALL BE ENSURED BY TAPPING UNDERGROUND WATER. THE PRIMARY TREATMENT FACILITY SHALL BE ENSURED BEFORE MAKING IT SUPPLIED TO THE USE OF PEOPLE, WATER SUPPLY VIA UNDERGROUND WATER TANKS OF 200 KLD CAPACITY ALONG WITH PUMPING STATIONS AND DI WATER LINES
6Sewer System
AN EFFICIENTLY DESIGNED SEWERAGE SYSTEM CONNECTED TO STP, SEWERAGE PIPELINES 300 MM TO 150 MM ALONG WITH SEWARAGE TREATMENT PLANT
7Drain
EFFICIENT UNDERGROUND DRAINAGE SYSTEM PROPOSED. THE SURFACERUNOFF FROM THE ROD, OPEN SPACES AND AREA TOHER THAN ROOF TOPS WILL BE TRANSPORTED THROUGH THE SYSTEM TO THE NEARESTEXISTING WATER BODY FOR THE HARVESTING AND THE OVERFLOW FROM THE WATER BODIES WILL BE DISPOSED OFF IN THE EXISTING DRAIN, STORM WATER RCC LINE WITH 250 MM TO 300 MM
8Parks
GREENERY DEVELOPMENT IN TOWNSHIP IS PROPOSED IN THE PARK. THESE GREEN SPACES ARE PROVIDEDWITH THE SECTORS CREATINGHEALTHY AND MODERATE ENVIRONMENT FOR THE RESIDENTS OF HOUSING, SPACIOUS PARK AREA 1590 SQ MTRS
9Tree Planting
PLANT LOCAL SPECIES TREES ON THEBOUNDARIES, ROADS, PARKS AND ON THECOMMON AREAS, PLANTS AND GRASS HAVE CONSISTENTLY BEING PLANTED AND MORE WILL BE PLANTED AS THE PROJECT CONTINUES.
10Design For Electric Supply Including Street Lighting
THE PROPOSED HOUSING SHALL SUPPLY ELECTRIC SUPPLYTHEROUGH 33KV -STATION FROM WHERE POWER SHALL BE SUPPLIED AT11 KV LEVEL THROUGH VARIOUSUNDERGROUND 11KV FEEDERS TO THE DISTRIBUATION TRANSFORMERSOF 11KV/433KV VARIATIONAND THE LT UNDERGROUND DISTRIBUTION SYSTEM, 100 SOLAR LIGHTINGS FOR STREET LIGHTING WITH ELECTRIC SUPPLY AS APPROVED BY DVVNL
11Community Buildings
COMMUNITY BUILDINGWITH VARIOUSCOMMUNITY ACTIVITIES PROPOSED IN HOUSING, COMMUNITY SPACE OF 1526 SQ MTRS IS PROVIDED
12Treatment and Disposal System of Sewage and Sullage water
TREATMENT AND DISPOSAL SYSTEM OF SEWAGE AND SULLAGE WATER SHALL BE TREATED IN THE STP PROPOSED IN THE VARIOUS ZONES IN HOUSING, SEWERAGE TREATMENT PLANT OF 250 KLD CAPACITY WITH MBBR TECHNOLOGY
13Solid Waste Management And Disposal System
AS ALL WASTE SHALL BE SEGREGATED AT SOURCE ONLY AFTER THAT ALL THE ORGANIC WASTE GENERATED IN THE HOUSING SHALL BE USED IN THE TOWNSHIP AFTER ITS TREATMENT TO MAKE IT ZERO WASTE DISCHARGE HOUSING. HOWEVER THE E-WASTE AND TOXIC WASTE AND RECYCLABLE WASTE SHALL BE HANDED OVER TO AGENCY SUGGESTED BY ADA, ELSE WE SHALL HAND OVER SUCH WASTE TO THE HIRED GOVERNMENT APPROVED SOLID WASTE MANAGEMENT AGENCY, THROUGH STP
14Water Conservation System
EVERY HOUSEHOLD SHALL GETPIPED WATER SUPPLY THROUGH A DESIGNED SYSTEM AND NO AREA SHALL BE ALLOWED TO INSTALL THEIR OWN INDIVIDUAL SYSTEMOF WATER SUPPLY .I.E JET PUMPS, HAND PUMPS, INDIVIDUAL BORWELL, 3 NUMBER RAIN WATER HARVESTING PITS
15Energy Management System Including Use of Renewable Energy
SOLAR LIGHT IN THE PARK/COMMON AND AREA SHALL BE PROVIDED PARTIALLY TO SAVE THE ENERGY.
16Fire Protection And Fire Safety System
NA
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
SUFFICIENT OPEN SPACES PROVIDED IN THETOWNSHIP FOR THE GATHERINGOF PEOPLE IN EMERGENCY
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 10 Feb 2030.

Sanctioned by Any Other Competent Authority · 36,138 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
4887 ZILA PANCHAYAT AGRA11 Feb 202510 Feb 203010 Feb 203230 Sept 2028
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗

Land & documents

18 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
472, 451, 46736138Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 6695
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 7101
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 7902
The registered deed by which the promoter bought the land.
PDF ↗
Khatauni extract · 01/07/2022
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 01/07/2022
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · ACKNOWLEDGEMENT OF KHATAUNI KHASRA 472
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 01/07/2022
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New7 Oct 2025 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New17 Sept 2025 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New17 Sept 2025 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New19 Sept 2025 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New8 Oct 2025 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New17 Sept 2025 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New17 Sept 2025 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New6 Oct 2025 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New6 Oct 2025 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New10 Oct 2025 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New17 Sept 2025 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New17 Sept 2025 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New6 Oct 2025 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New6 Oct 2025 ↗

Quarterly progress reports

5 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

5 quarterly progress reports are on file with UPRERA, covering 2025-Q1 to 2026-Q1.

QuarterConstructionCertificates
2025-Q116%CA ↗ · Arch ↗ · Eng ↗
2025-Q236%CA ↗ · Arch ↗ · Eng ↗
2025-Q345%CA ↗ · Arch ↗ · Eng ↗
2025-Q451%CA ↗ · Arch ↗ · Eng ↗
2026-Q161.5%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameCZAR BUILDCON PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM318302
PANAAFCC1251R
CIN / TANDELC13903B
Name of chairmanNaveen Gambhir
Registered addressH-69,UGF,OUTER CIRCLE ABOVE HDFC BANK, CONNAUGHT PLACE NEW DELHI DL 110001 IN
RERA contact
Registered since2024
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Agra

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
CBPL COLLECTION AC FOR GHI CITY 2BankHDFC BANKBranchTAJ NAGARI AGRABranch addressTAJ NAGARI PHASE II FATEHABAD ROAD AGRABranch districtAgraA/C no.IFSCHDFC0005144Branch emailsunny.arora1@hdfcbank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
CBPL SEPARATE BANK AC FOR GHI CITY 2BankHDFC BANKBranchTAJ NAGARI AGRABranch addressTAJ NAGARI PHASE II FATEHABAD ROAD AGRABranch districtAgra, Uttar PradeshA/C no.IFSCHDFC0005144
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
CBPL RERA TRANSACTION AC FOR GHI CITY 2BankHDFC BANKBranchTAJ NAGARIBranch addressTAJ NAGARI PHASE II FATEHABAD ROAD AGRABranch districtAgra, Uttar PradeshA/C no.IFSCHDFC0005144
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about G.H.I. CITY -2

Is G.H.I. CITY -2 RERA registered?

Yes. G.H.I. CITY -2 is registered with UPRERA under registration number UPRERAPRJ937180, registered on 23 Feb 2026. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for G.H.I. CITY -2?

The completion date filed with UPRERA is 30 Sept 2028. No completion certificate is on record yet.

Who is the builder of G.H.I. CITY -2?

CZAR BUILDCON PRIVATE LIMITED is the promoter entity that filed G.H.I. CITY -2 with UPRERA (promoter RERA ID UPRERAPRM318302). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does G.H.I. CITY -2 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is G.H.I. CITY -2 located?

G.H.I. CITY -2 is registered in Miyapur near TDI City Fatehabad Road Agra, Agra, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗