Galactic City-Universal Tower is a RERA-registered commercial project by Homes Connect Developers Private Limited in Gautam Budh Nagar (RERA ID UPRERAPRJ15254). Registered with a completion deadline of 31 Dec 2027.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ15254 |
| Project category | Commercial |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Greater Noida Authority |
| Proposed start | 1 Mar 2018 |
| Project duration | 118 months |
| Address | Gautam Budh Nagar |
| Applicant type | Company |
| Applicant address | A-19, Sector-64, Noida, Uttar Pradesh-201301 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
- valid to
Permit revalidated
BP3625/1103
3 building permits sanctioned
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
Permit revalidated (2)
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 21 Feb 2018 |
| Original completion | 28 Feb 2022 |
| Revised completion | 31 Dec 2027 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹45,000 |
| Sanctioning authority | Greater Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- OTHER340 91%
- SHOP35 9%
| Configuration | Units | Carpet area |
|---|---|---|
| SHOP | 35 | 7-25 |
| OTHER | 340 | 16-38 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| BLOCK-3 AND 12 · SHOP, OTHER | 11 | 375 | 7-38 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
Permits & extensions
3 permits
An approval and the date it runs to - not proof the work matching it was done.
3 sanctioning permits are on record with UPRERA, the latest valid to 14 Feb 2023. All 3 carry a revalidation, the latest valid to 14 Feb 2028.
Sanctioned by Greater Noida Authority · 3,435 sqm of land · an approved plan of 1 block and 375 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| BP3625/1103 | 15 Feb 2018 | 14 Feb 2023 | 12 Feb 2031 | 27 Aug 2022 | 11 Apr 2025 valid to 13 Feb 2028 as PLG/BP-SM-04-DEC-2024;23257 | |
| BP3625/1103 | 15 Feb 2018 | 14 Feb 2023 | 13 Feb 2031 | 27 Aug 2022 | 15 Feb 2018 valid to 14 Feb 2028 | |
| BP3625/1103 | 15 Feb 2018 | 14 Feb 2023 | 13 Feb 2028 | 27 Aug 2022 | 11 Apr 2025 valid to 13 Feb 2028 as PLG/BP-SM-04-DEC-2024;23257 |
| Document | File |
|---|---|
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
UPRERA’s record carries 2 completion extensions for this project, the latest running to 31 Dec 2027.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 28 Feb 2022 | 27 Aug 2022 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 2 | 27 Aug 2022 | 31 Dec 2027 | — |
Land & documents
1 filing
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary1 registry or lease-deed filing is on this project’s record with UPRERA, dated 8 Sept 2015.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 19963 | 8 Sept 2015 | other | — |
| Lease deed · 18767 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Lease deed · 18767 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Lease deed · 18767 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Lease deed · 18767 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 10 Mar 2018 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | Yes |
| Fire safety (as filed with RERA) | Yes |
| Health service | Yes |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
21 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
21 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2025-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | 0% | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | 0% | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | 0% | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | 0% | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | 0% | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | 0% | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | 0% | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | 0% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | 1.74% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | 8.15% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | 16.45% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | 28.66% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | 34.72% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | 38.45% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | 41.88% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | 42.03% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | 42.66% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | 43.12% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | 44.1% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | 46.67% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | 46.73% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Homes Connect Developers Private Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM37473 |
| PAN | AADCH5437L |
| CIN / TAN | U70102DL2015PTC275741 |
| Name of chairman | Mr. Rishabh Jain (Chairman/Director) |
| Registered address | A-19, Sector-64, Noida, Uttar Pradesh-201301 |
| RERA contact | |
| Registered since | 2018 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | Homes Connect Developers Private LimitedBankIndusind BankBranchSector-63, Noida, U.PA/C no.IFSCINDB0000162 |
What has changed on this record
2 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 12 (Under Registration - 1 ) → 12 (Under Registration - 0 ) changed in Estanzo’s record | 23 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 12 (Under Registration - 2 ) → 12 (Under Registration - 1 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 23 Sept 2026 · 2 movements on record |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No khasra or plot detail is published for this project.Ask which khasra numbers the project stands on, so the plot can be matched against the deed and the revenue record.
Common questions about Galactic City-Universal Tower
Is Galactic City-Universal Tower RERA registered?
Yes. Galactic City-Universal Tower is registered with UPRERA under registration number UPRERAPRJ15254, registered on 21 Feb 2018. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Galactic City-Universal Tower?
The completion date filed with UPRERA is 31 Dec 2027. No completion certificate is on record yet.
Who is the builder of Galactic City-Universal Tower?
Homes Connect Developers Private Limited is the promoter entity that filed Galactic City-Universal Tower with UPRERA (promoter RERA ID UPRERAPRM37473). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Galactic City-Universal Tower more time to complete?
UPRERA's record carries 2 completion extensions for Galactic City-Universal Tower, the latest running to 31 Dec 2027. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Galactic City-Universal Tower have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Galactic City-Universal Tower located?
Galactic City-Universal Tower is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in Galactic City-Universal Tower?
The unit plan filed with UPRERA lists SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in Galactic City-Universal Tower?
The approved unit plan filed with UPRERA runs from 7 to 38 m² of carpet area (about 75 to 406 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in Galactic City-Universal Tower?
The approved unit plan describes 1 block and 375 units of which 340 are homes and 35 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Galactic City-Universal Tower?
About 442 units per acre: 375 planned units across 0.85 acres (3,435 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗