GALAXY ROYALE ,Phase-2(Tower C Vrindavan,Club)

UPRERARegistered

GALAXY ROYALE ,Phase-2(Tower C Vrindavan,Club) is a RERA-registered residential project by PRITHVEELINK BUILDWELL PRIVATE LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ5836). Registered with a completion deadline of 29 Nov 2021.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ5836
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start7 Jun 2017
Project duration54 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant address105 , First Floor , Vardhmans Sidhant Shopping Plaza , LSC savita Vihar , Delhi-110092
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Permit revalidated

    PLG(BP) 3208/7567

  2. 2 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. Completion certificate filed

  6. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  7. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  8. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered28 Sept 2017
Original completion31 May 2021
Revised completion29 Nov 2021
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary13 Jul 2020
Registration fee₹31,000
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors209 · 1 · 18 (units from plan)
  • 2 BHK204 98%
  • 4 BHK5 2%
ConfigurationUnitsCarpet area
2 BHK20452-66
4 BHK5142
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
TOWER C · 2 BHK, 4 BHK1820952-142
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
ANUJ AGARWAL
License CA/96/19503
A-244,KAUSHAMBI,GHAZIABAD,U.P.
Engineer
Sumit Gola
132,MITHILA APARTMENT,76,IP EXTENSION,DELHI-110092
Contractor
S S Buildtech
H.No. B/92,Flat No. FF2,Ramparsath chandra Nagar, Ghaziabad - 201010
Sr.Development work declared to RERA
1Demarcation of Plots
Plot No.- GC-3J/GH-03, Sector-16C, Greater Noida,
2Boundary Wall
3 Sides - other occupants and 1 Side own boundary
3Road Work
Cement Concrete Internal Roads
4Footpaths
Interlocking Pavers
5Water Supply Including Drinking Water Facilities
From GNIDA and Storage Will be Done Under Ground Water Tank
6Sewer System
Main Sewer Line has been designed as per Norms
7Drain
Underground Pipe Drain with Chamber
8Parks
Park Area has been Designed as per Authority Guidelines
9Tree Planting
Tree Planting has been Designed as per Authority Guidelines
10Design For Electric Supply Including Street Lighting
Design has been done as per UP Electricity Board Guidelines
11Community Buildings
Club - as per authority norms with necessary facilities
12Treatment and Disposal System of Sewage and Sullage water
STP 300 KLD Has been installed
13Solid Waste Management And Disposal System
Door to door collection and will be disposed
14Water Conservation System
Recycling of Treated Water and Provide Rain Water System
15Energy Management System Including Use of Renewable Energy
Solar Panel has been provided as per norms at Suitable place
16Fire Protection And Fire Safety System
As per Fire Department Guidelines
17Social Infrastructure And Other Public Amenities Including Public Health Services
GYM, Jogging Track, Space for Yoga etc.
18Emergency Evacuation Services
POWER BACKUP
19Other Miscellaneous Work
N/A
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

23 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2AADHAR PROPMART PRIVATE LIMITEDUPRERAAGT10142
3ACUBE SOLUTIONSUPRERAAGT10220
4ALOK UPADHYAYUPRERAAGT12497
5Amit DobriyalUPRERAAGT13637
6ANAROCK Property Consultants Private LimitedUPRERAAGT10265
7ATN BUILDTECH PVT. LTD.UPRERAAGT13348
8BULLMEN REALTY INDIA PRIVATE LIMITEDUPRERAAGT10138
9CITYMAX PROPMART PRIVATE LIMITEDUPRERAAGT13792
10GATEWAY PROPMART PVT LTDUPRERAAGT10384
11NEOBRIX CONSULTING PVT LTDUPRERAAGT10059
12OXBUILT INFRATECH PRIVATE LIMITEDUPRERAAGT10517
13Pegasus Infra Consulting Pvt Ltd ( formerly known as Investors Infrahome Pvt Ltd)UPRERAAGT10062
14PROPSHOPUPRERAAGT10129
15Regrob Infrastructure Pvt LtdUPRERAAGT12681
16SANG INFRATECH PVT. LTD.UPRERAAGT10024
17SANTOSH KUMARUPRERAAGT10156
18Santosh KumarUPRERAAGT13874
19SMC Real Estate Advisors Private LimitedUPRERAAGT10113
20TRUHOMES REALTYUPRERAAGT10997
21URBAN AVENUES LLPUPRERAAGT10834
22URWASHIUPRERAAGT14672
23VALUEMAX ADVISORS CONSULTING PRIVATE LIMITEDUPRERAAGT11361
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 14 Oct 2021. 1 of them carries a revalidation.

Sanctioned by Greater Noida Authority · 5,118 sqm of land · an approved plan of 1 block and 209 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
PLG(BP) 3208/756714 Oct 201614 Oct 2021—31 May 2021—
PLG(BP) 3208/756714 Oct 201614 Oct 202114 Oct 202131 May 202114 Oct 2016
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 29 Nov 2021.

#Granted fromExtended uptoNote
131 May 202129 Nov 2021Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

23 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
GC-3J/GH-0311095Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 24 Mar 2013.

Registry no.DateTypeArea
696524 Mar 2013self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 6965 IN BOOK NO 1, VOL NO 12865 AT GNIDA
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New13 Jun 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New13 Jun 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New13 Jun 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New13 Jun 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New13 Jun 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New13 Jun 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New13 Jun 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New13 Jun 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New13 Jun 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New18 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New13 Jun 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New13 Jun 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old30 Jul 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old30 Jul 2017 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old30 Jul 2017 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
Old30 Jul 2017 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
Old30 Jul 2017 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
Old30 Jul 2017 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
Old30 Jul 2017 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
Old30 Jul 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterGanga Jal Nigam
Fire safety (as filed with RERA)Fire Staircase
Health serviceFirst Aid
Renewable energySolar Lighting (Common Area)
Other facilitiesCommon Swimming Pool

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

6 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

6 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q3.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal namePRITHVEELINK BUILDWELL PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM11789
PANAAGCP9083M
CIN / TANU70109DL2012PTC244147
Name of chairmanPRADEEP KUMAR AGRAWALLA
Registered address105 , First Floor , Vardhmans Sidhant Shopping Plaza , LSC savita Vihar , Delhi-110092
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Prithiveelink Buildwell Pvt. LtdBankICICI BANKBranch215, F. P. House, Free Press Marg, Nariman Point- 400021 (Mumbai),A/C no.IFSCICIC0000004
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about GALAXY ROYALE ,Phase-2(Tower C Vrindavan,Club)

Is GALAXY ROYALE ,Phase-2(Tower C Vrindavan,Club) RERA registered?

Yes. GALAXY ROYALE ,Phase-2(Tower C Vrindavan,Club) is registered with UPRERA under registration number UPRERAPRJ5836, registered on 28 Sept 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has GALAXY ROYALE ,Phase-2(Tower C Vrindavan,Club) been completed?

UPRERA still lists GALAXY ROYALE ,Phase-2(Tower C Vrindavan,Club) as Registered, so it is not shown as completed here. A completion certificate dated 13 Jul 2020 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of GALAXY ROYALE ,Phase-2(Tower C Vrindavan,Club)?

PRITHVEELINK BUILDWELL PRIVATE LIMITED is the promoter entity that filed GALAXY ROYALE ,Phase-2(Tower C Vrindavan,Club) with UPRERA (promoter RERA ID UPRERAPRM11789). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted GALAXY ROYALE ,Phase-2(Tower C Vrindavan,Club) more time to complete?

UPRERA's record carries 1 completion extension for GALAXY ROYALE ,Phase-2(Tower C Vrindavan,Club), the latest running to 29 Nov 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does GALAXY ROYALE ,Phase-2(Tower C Vrindavan,Club) have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is GALAXY ROYALE ,Phase-2(Tower C Vrindavan,Club) located?

GALAXY ROYALE ,Phase-2(Tower C Vrindavan,Club) is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in GALAXY ROYALE ,Phase-2(Tower C Vrindavan,Club)?

The unit plan filed with UPRERA lists 2 BHK and 4 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in GALAXY ROYALE ,Phase-2(Tower C Vrindavan,Club)?

The approved unit plan filed with UPRERA runs from 52 to 142 m² of carpet area (about 555 to 1,529 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in GALAXY ROYALE ,Phase-2(Tower C Vrindavan,Club)?

The approved unit plan describes 1 block and 209 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is GALAXY ROYALE ,Phase-2(Tower C Vrindavan,Club)?

About 165 units per acre: 209 planned units across 1.26 acres (5,118 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗