GANPATI WORLD - SAUBHAGYA HOUSING SCHEME

UPRERARegistered

GANPATI WORLD - SAUBHAGYA HOUSING SCHEME is a RERA-registered residential project by GANPATI INFRASTRUCTURE DEVELOPMENT COMPANY LIMITED in Agra (RERA ID UPRERAPRJ797749). Registered with a completion deadline of 31 Dec 2023.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Oct–Dec 2023
Quarters shown are calendar quarters. UP-RERA files them by financial year.
8%Q1'22
8%Q2'22
8%Q3'22
8%Q4'22
8%Q1'23
8%Q2'23
8%Q3'23
8%Q4'23

Construction stayed at 8% across 12 consecutive filed quarters (Jan–Mar 2021 to Oct–Dec 2023). The promoter filed the same figure each time. Quarters with no percentage filed are not counted either way.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ797749
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAgra Development Authority
Proposed start30 Mar 2021
Project duration34 months
AddressAgra, Agra
TehsilAgra
Applicant typeCompany
Applicant address31/472 C1,IST FLORE ,GANASH PLAZA SULTAN GANJ PULIYA PIPASS ROAD AGRA
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    505/BFT/07/10-11

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered19 May 2021
Original completion31 Dec 2023
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹80,500
Sanctioning authorityAgra Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors390 · 5 · 13 (units from plan)
  • 3 BHK234 60%
  • 2 BHK156 40%
ConfigurationUnitsCarpet area
2 BHK15652
3 BHK23477
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
CALIFORNIA TOWER · 3 BHK137877
DUBAI TOWER · 2 BHK137852
MEXICO TOWER · 3 BHK137877
PARIS TOWER · 3 BHK137877
TOKYO TOWER · 2 BHK137852
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
TAPAN KUMAR
License CA/2022/30011
A-302, AADITYA CELEBRITY HOMES, NOIDA
Engineer
SANTOSH KUMAR
H/121B, SWAROOP NAGAR, KANPUR
Contractor
AMANDEEP NIRMAN
103, HAVELI APARTMENT, MAU ROAD, KHANDARI, AGRA
Sr.Development work declared to RERA
1Demarcation of Plots
COMPLETED AND DEMARCATED WITH BOUNDARY WALL.
2Boundary Wall
6 FEET HIGH AND BRICK WORK WALL
3Road Work
ROAD WORK COMPLETED AT SITE
4Footpaths
IN PLANNING WITH PAVER BLOCK
5Water Supply Including Drinking Water Facilities
DRINKING WATER SUPPLY IS THROUGH BOREWELL THEN TO UGT .
6Sewer System
STP ALREADY CONSTRUCTED AT SITE.
7Drain
RWH IS ALREADY INTO PLANNING
8Parks
ALREADY DEVELOPED
9Tree Planting
ALREADY DEVELOPED
10Design For Electric Supply Including Street Lighting
ALREADY EXIST
11Community Buildings
COMMUNITY HALL AND CLUB HOUSE ALREADY WELL DEVELOPED
12Treatment and Disposal System of Sewage and Sullage water
STP ALREADY EXIST WITH DUAL FLUSHING SYSTEM
13Solid Waste Management And Disposal System
THE PROJECT SITE FALLS UNDER THE AREA NAGAR NIGAM AGRA. HENCE SOLID WASTE IS BEING MANAGED BY THEM.
14Water Conservation System
RWH IN PLANNING
15Energy Management System Including Use of Renewable Energy
N/A
16Fire Protection And Fire Safety System
BY ISI GRADE COMPANY AS PER FIRE DEPARTMENT NORMS
17Social Infrastructure And Other Public Amenities Including Public Health Services
IN PLANNING
18Emergency Evacuation Services
AS PER FIRE DEPARTMENT NORMS
19Other Miscellaneous Work
AS PER PROJECT REQUIRMENT
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 15 Jul 2019.

Sanctioned by Agra Development Authority · 15,083 sqm of land · an approved plan of 5 blocks and 390 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
505/BFT/07/10-1116 Jul 201415 Jul 201916 Jul 202231 Dec 2023
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

18 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
1, 20928235Khasra
1, 20928235Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 7058
The registered deed by which the promoter bought the land.
PDF ↗
Registry document · HIGH COURT MERGER ORDER
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Sale deed · 12751
The registered deed by which the promoter bought the land.
PDF ↗
Registry document · KHATONI 209 & 1
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · REVISED UNIT DETAILS UPTO 14th FLOOR
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · REVISED UNIT DETAILS UPTO 14th FLOOR
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New24 Apr 2021 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New30 Mar 2021 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New30 Mar 2021 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New30 Mar 2021 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New24 Apr 2021 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New24 Apr 2021 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New24 Apr 2021 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New30 Mar 2021 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New30 Mar 2021 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New30 Mar 2021 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New30 Mar 2021 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New30 Mar 2021 ↗

Quarterly progress reports

12 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

12 quarterly progress reports are on file with UPRERA, covering 2020-Q4 to 2023-Q3.

QuarterConstructionCertificates
2020-Q48%CA ↗ · Arch ↗ · Eng ↗
2021-Q18%CA ↗ · Arch ↗ · Eng ↗
2021-Q28%CA ↗ · Arch ↗ · Eng ↗
2021-Q38%CA ↗ · Arch ↗ · Eng ↗
2021-Q48%CA ↗ · Arch ↗ · Eng ↗
2022-Q18%CA ↗ · Arch ↗ · Eng ↗
2022-Q28%CA ↗ · Arch ↗ · Eng ↗
2022-Q38%CA ↗ · Arch ↗ · Eng ↗
2022-Q48%CA ↗ · Arch ↗ · Eng ↗
2023-Q18%CA ↗ · Arch ↗ · Eng ↗
2023-Q28%CA ↗ · Arch ↗ · Eng ↗
2023-Q38%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2023-Q3. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameGANPATI INFRASTRUCTURE DEVELOPMENT COMPANY LIMITED
RolePromoter · current
RERA IDUPRERAPRM2735
PANAAECG6731F
CIN / TANU70102UP2012PLC049767
Name of chairmanANIL AGARWAL
Registered address31/472 C1,IST FLORE ,GANASH PLAZA SULTAN GANJ PULIYA PIPASS ROAD AGRA
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Agra

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
GANPATI INFRASTRUCTURE DEVLOPMENT COMPANY LIMITEDBankYES BANKBranchKAMLA NAGAR AGRAA/C no.IFSCYESB0000711
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)24 (Under Registration - 1 ) → 24 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 23 Aug 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about GANPATI WORLD - SAUBHAGYA HOUSING SCHEME

Is GANPATI WORLD - SAUBHAGYA HOUSING SCHEME RERA registered?

Yes. GANPATI WORLD - SAUBHAGYA HOUSING SCHEME is registered with UPRERA under registration number UPRERAPRJ797749, registered on 19 May 2021. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for GANPATI WORLD - SAUBHAGYA HOUSING SCHEME?

The completion date filed with UPRERA is 31 Dec 2023. No completion certificate is on record yet.

Who is the builder of GANPATI WORLD - SAUBHAGYA HOUSING SCHEME?

GANPATI INFRASTRUCTURE DEVELOPMENT COMPANY LIMITED is the promoter entity that filed GANPATI WORLD - SAUBHAGYA HOUSING SCHEME with UPRERA (promoter RERA ID UPRERAPRM2735). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does GANPATI WORLD - SAUBHAGYA HOUSING SCHEME have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is GANPATI WORLD - SAUBHAGYA HOUSING SCHEME located?

GANPATI WORLD - SAUBHAGYA HOUSING SCHEME is registered in Agra, as filed with UPRERA.

What configurations are available in GANPATI WORLD - SAUBHAGYA HOUSING SCHEME?

The unit plan filed with UPRERA lists 2 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in GANPATI WORLD - SAUBHAGYA HOUSING SCHEME?

The approved unit plan filed with UPRERA runs from 52 to 77 m² of carpet area (about 563 to 831 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in GANPATI WORLD - SAUBHAGYA HOUSING SCHEME?

The approved unit plan describes 5 blocks and 390 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is GANPATI WORLD - SAUBHAGYA HOUSING SCHEME?

About 105 units per acre: 390 planned units across 3.73 acres (15,083 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗