GAYATRI AURA is a RERA-registered residential project by GAYATRI HOSPITALITY AND REAL CON LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ7084). RERA status: NCLT (since 5 Oct 2026).
RERA status as reported: NCLT.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ7084 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | NCLTNCLTThe tribunal that hears company insolvency cases. UP-RERA lists projects whose promoter is before it.Read the full entry in the glossary |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Greater Noida Authority |
| Proposed start | 10 Jul 2014 |
| Original start | 22 Jan 2014 |
| Project duration | 121 months |
| Address | Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | GH11, SECTOR 1, GREATER NOIDA(WEST), GAUTAM BUDH NAGAR, UTTAR PRADESH |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
BP-2681/GH/ORA-5370
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- valid to
Permit revalidated
PLG/(BP)2681/1145
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
NCLT order
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 31 Jul 2017 |
| Original completion | 19 Jan 2024 |
| Revised completion | 18 Jul 2024 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹1,85,000 |
| Sanctioning authority | Greater Noida Authority |
| NCLT order date | 5 Oct 2026 |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK956 55%
- 2 BHK544 31%
- STUDIO181 10%
- SHOP47 3%
| Configuration | Units | Carpet area |
|---|---|---|
| 3 BHK | 956 | 63-149 |
| SHOP | 47 | 7-78 |
| STUDIO | 181 | 22-50 |
| 2 BHK | 544 | 52-58 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| A · OTHER, 3 BHK | 19 | 135 | 64-86 |
| B · OTHER, 3 BHK, 2 BHK | 19 | 135 | 54-64 |
| C · OTHER, 3 BHK | 22 | 113 | 67-72 |
| D · OTHER, 3 BHK, 2 BHK | 22 | 153 | 52-72 |
| E · OTHER, 3 BHK, 2 BHK | 19 | 135 | 54-64 |
| F · OTHER, 3 BHK, 2 BHK | 19 | 135 | 54-86 |
| G · OTHER, 3 BHK | 27 | 143 | 67-89 |
| H · OTHER, 2 BHK | 27 | 198 | 52-58 |
| I · OTHER, 2 BHK, 3 BHK | 25 | 179 | 52-67 |
| J · 3 BHK, OTHER | 24 | 174 | 71-149 |
| Studio Tower · SHOP, STUDIO, OTHER | 24 | 228 | 7-78 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots The plot is Demarcated by its boundaries (latitude and longitude of the end points)_ 24 Meter Road to the North, 60 Meter Road to the South, 24 Meter Road to the East, GH-01A to the West of Plot. |
| 2 | Boundary Wall The boundary wall proposed to be constructed shall be constructed by use of RCC Column beam, brick work and grills. |
| 3 | Road Work • The work of external road has already been carried by (Greater Noida Industrial Development Authority) in accordance with Lease Deed and sanctioned plan; • Internal roads are RCC Roads |
| 4 | Footpaths The work of footpath is proposed. Design Footpath will be constructed by use of cover blocks, cemented bricks and ancillary products |
| 5 | Water Supply Including Drinking Water Facilities Municipal and Ground Treated Water supply. |
| 6 | Sewer System Sewerage Treatment Plant shall be constructed. |
| 7 | Drain Strom Water Line with Rain water harvesting |
| 8 | Parks The area of park has been designed to accommodate playing area for children’s and sitting area for allottee/people as a general course of practice. |
| 9 | Tree Planting Landscaping and Trees shall be planted as norms of authority//234 trees at the relevant point of time. |
| 10 | Design For Electric Supply Including Street Lighting Electricity shall be supplied by prescribed authority / Company at the relevant point of time. For Back up Electricity, a DG Set shall be installed as per requirement. |
| 11 | Community Buildings The Community Building shall comprise of Club, Fitness Centre, & Community Hall. |
| 12 | Treatment and Disposal System of Sewage and Sullage water The sewerage and sullage water shall be treated firstly in Sewerage Treatment Plant. Accordingly, the water will be disposed either in Flush line constructed by GNIDA or will be used in gardening and ancillary purposes as the case may be. |
| 13 | Solid Waste Management And Disposal System The facility shall be operated in accordance with the practice at the relevant point of time and in accordance with guidelines/ directions issued by GNIDA or the competent authority for the time being in force. |
| 14 | Water Conservation System Rain Water Harvesting |
| 15 | Energy Management System Including Use of Renewable Energy Solar Management System according to relevant rules/directions prescribed by the Greater Noida Industrial Development Authority and or by relevant authority for the time being in force shall be installed. |
| 16 | Fire Protection And Fire Safety System Smoke detector, springler and ancilillary products or such other products as may prescribed by the competent department / authority shall be installed and be operated accordingly. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services Fire Stairs shall be constructed as per guidelines issued by the relevant authority and Greater Noida Industrial Development Authority. |
| 19 | Other Miscellaneous Work NA |
Registered agents
1 agent
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | Earth Homes Pvt. Ltd | UPRERAAGT11244 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 27 Aug 2018. It carries a revalidation, valid to 19 Jan 2024.
Sanctioned by Greater Noida Authority · 36,000 sqm of land · an approved plan of 11 blocks and 1728 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| BP-2681/GH/ORA-5370 | 28 Aug 2013 | 27 Aug 2018 | 19 Jan 2024 | 19 Jan 2024 | 16 Feb 2018 valid to 19 Jan 2024 as PLG/(BP)2681/1145 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 18 Jul 2024.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 19 Jan 2024 | 18 Jul 2024 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
23 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| GH11, SECTOR 1, GREATER NOIDA WEST | 36002.95 | Plot |
| Registry document · 2421/2011/01 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 14 Jul 2018 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 14 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 14 Jul 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 14 Jul 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 14 Jul 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 14 Jul 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 14 Jul 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 14 Jul 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 14 Jul 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 14 Jul 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 14 Jul 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 23 Feb 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 23 Feb 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 23 Feb 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 23 Feb 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 23 Feb 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 23 Feb 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 23 Feb 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 23 Feb 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 24 Feb 2018 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | yes |
| Fire safety (as filed with RERA) | yes |
| Renewable energy | yes |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
18 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
18 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2024-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | GAYATRI HOSPITALITY AND REAL CON LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM11470 |
| PAN | AADCG8654J |
| CIN / TAN | U70101DL2010PLC205416 |
| Name of chairman | HARI OM DIXIT VISHNU DIXIT PURSHOTTAM DAS GOKANI |
| Registered address | GH11, SECTOR 1, GREATER NOIDA(WEST), GAUTAM BUDH NAGAR, UTTAR PRADESH |
| RERA contact | |
| Registered since | 2017 |
| Legal name | FLORAL HOMES PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | delhi |
| RERA contact |
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | GAYATRI HOSPITALITY AND REAL CON LIMITEDBankCANARA BANKBranchSECTOR 63 NOIDAA/C no.IFSCCNRB0002886 |
What has changed on this record
8 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 205 (Under Registration - 4 ) → 205 (Under Registration - 3 ) changed in Estanzo’s record | 3 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 205 (Under Registration - 5 ) → 205 (Under Registration - 4 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 205 (Under Registration - 7 ) → 205 (Under Registration - 5 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 204 (Under Registration - 6 ) → 205 (Under Registration - 7 ) changed in Estanzo’s record | 21 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 204 (Under Registration - 7 ) → 204 (Under Registration - 6 ) changed in Estanzo’s record | 9 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 202 (Under Registration - 5 ) → 204 (Under Registration - 7 ) changed in Estanzo’s record | 3 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 200 (Under Registration - 3 ) → 202 (Under Registration - 5 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | 200 (Under Registration - 4 ) → 200 (Under Registration - 3 ) changed in Estanzo’s record | 10 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 3 Oct 2026 · 8 movements on record |
Common questions about GAYATRI AURA
Is GAYATRI AURA RERA registered?
Yes. GAYATRI AURA is registered with UPRERA under registration number UPRERAPRJ7084, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for GAYATRI AURA?
The completion date filed with UPRERA is 18 Jul 2024. No completion certificate is on record yet.
Who is the builder of GAYATRI AURA?
GAYATRI HOSPITALITY AND REAL CON LIMITED is the promoter entity that filed GAYATRI AURA with UPRERA (promoter RERA ID UPRERAPRM11470). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted GAYATRI AURA more time to complete?
UPRERA's record carries 1 completion extension for GAYATRI AURA, the latest running to 18 Jul 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does GAYATRI AURA have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is GAYATRI AURA located?
GAYATRI AURA is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in GAYATRI AURA?
The unit plan filed with UPRERA lists 3 BHK, SHOP, STUDIO, OTHER and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in GAYATRI AURA?
The approved unit plan filed with UPRERA runs from 7 to 149 m² of carpet area (about 75 to 1,600 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in GAYATRI AURA?
The approved unit plan describes 11 blocks and 1,728 units of which 1,681 are homes and 47 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is GAYATRI AURA?
About 194 units per acre: 1,728 planned units across 8.90 acres (36,000 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗