GAYATRI LIFE

UPRERANCLT

GAYATRI LIFE is a RERA-registered residential project by GAYATRI INFRA PLANNER PRIVATE LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ7360). RERA status: NCLT (since 28 Mar 2023). UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: NCLT.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ7360
Project categoryResidential
Registration typeOngoing
RERA statusNCLTNCLTThe tribunal that hears company insolvency cases. UP-RERA lists projects whose promoter is before it.Read the full entry in the glossary
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start27 Aug 2014
Original start30 Jan 2014
Project duration134 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant address1/7098, 2nd Floor, Gali No. 5, Shivaji Park, Shahdara, Delhi -110032
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    BP-3131/GH/CPJ-3355

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. valid to

    Permit revalidated

    PLG/(BP)3137/8475

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. to

    Extension granted

  8. NCLT order

  9. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as NCLT. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered31 Jul 2017
Original completion27 Aug 2020
Revised completion30 Sept 2025
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹94,000
Sanctioning authorityGreater Noida Authority
NCLT order date28 Mar 2023

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors852 · 5 · 25 (units from plan)
Homes · commercial units829 · 23 (shops and offices filed in the same plan)
  • 2 BHK458 54%
  • 3 BHK252 30%
  • 1 BHK83 10%
  • 4 BHK36 4%
  • SHOP23 3%
ConfigurationUnitsCarpet area
SHOP2320-49
1 BHK8330-30
2 BHK45830-59
3 BHK25267-89
4 BHK36102
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
AQUA · OTHER, 2 BHK2518358-59
BREEZE & AZURE · OTHER, 3 BHK, 4 BHK2028867-102
LIFE SUITS · SHOP, 1 BHK, 2 BHK1012720-49
TERRA · OTHER, 2 BHK2525250-59
TERRA (24TH FLOOR) · 2 BHK1250
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
SPACE DESIGNER ARCHITECTS PRIVATE LIMITED
License CA/98/23185
B-34, SECTOR 67, NOIDA, UTTAR PRADESH
Engineer
Optimum Design Pvt. Ltd(V.D. SHARMA)
B-24, SECTOR-67, NOIDA, UTTAR PRADESH
Contractor
AADHAAR SHRI INFRATECH PRIVATE LIMITED
CS06, SHOP NO 04, GYAN KHAND INDIRAPURAM, GHAZIABAD, UTTAR PRADESH
Sr.Development work declared to RERA
1Demarcation of Plots
The plot is Demarcated by its boundaries (latitude and longitude of the end points)_ 24 Meter Road to the North, Plot No GH-01C, 01D, 01E to the South, 45 Meter Road to the East, GH-01A to the West of Plot.
2Boundary Wall
The boundary wall proposed to be constructed shall be constructed by use of RCC Column beam, brick work and grills.
3Road Work
• The work of external road has already been carried by (Greater Noida Industrial Development Authority) in accordance with Lease Deed and sanctioned plan; • Internal roads are RCC Roads.
4Footpaths
The work of footpath is proposed. Design Footpath will be constructed by use of cover blocks, cemented bricks and ancillary products
5Water Supply Including Drinking Water Facilities
Municipal and Ground Treated Water supply.
6Sewer System
Sewerage Treatment Plant shall be constructed.
7Drain
Strom Water Line with Rain water harvesting
8Parks
The area of park has been designed to accommodate playing area for children’s and sitting area for allottee/people as a general course of practice.
9Tree Planting
Landscaping and 138 Trees shall be planted.
10Design For Electric Supply Including Street Lighting
Electricity shall be supplied by prescribed authority / Company at the relevant point of time. For Back up Electricity, a DG Set shall be installed as per requirement.
11Community Buildings
The Community Building shall comprise of Club, Fitness Centre, & Community Hall.
12Treatment and Disposal System of Sewage and Sullage water
The sewerage and sullage water shall be treated firstly in Sewerage Treatment Plant. Accordingly, the water will be disposed either in Flush line constructed by GNIDA or will be used in gardening and ancillary purposes as the case may be.
13Solid Waste Management And Disposal System
The facility shall be operated in accordance with the practice at the relevant point of time and in accordance with guidelines/ directions issued by GNIDA or the competent authority for the time being in force.
14Water Conservation System
Rain Water Harvesting
15Energy Management System Including Use of Renewable Energy
Solar Management System according to relevant rules/directions prescribed by the Greater Noida Industrial Development Authority and or by relevant authority for the time being in force shall be installed.
16Fire Protection And Fire Safety System
Smoke detector, springler and ancilillary products or such other products as may prescribed by the competent department / authority shall be installed and be operated accordingly.
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
Fire Stairs shall be constructed as per guidelines issued by the relevant authority.
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

1 agent

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1Earth Homes Pvt. LtdUPRERAAGT11244
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 21 May 2018. It carries a revalidation, valid to 10 Dec 2022.

Sanctioned by Greater Noida Authority · 17,775 sqm of land · an approved plan of 5 blocks and 852 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
BP-3131/GH/CPJ-335522 May 201321 May 201821 May 202327 Aug 202011 Dec 2017
valid to 10 Dec 2022
as PLG/(BP)3137/8475
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 30 Sept 2025.

#Granted fromExtended uptoNote
127 Aug 202026 Feb 2021Six months extension in view of force majeure caused by covid-19 pandemic
226 Feb 202130 Sept 2025—

Land & documents

20 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
GH-01F17775.09Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 4446
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Allotment letter from the authority · Builders/BRS-04/2011/702
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New6 Jul 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New6 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New6 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New6 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New6 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New6 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New6 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New6 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New6 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New6 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New6 Jul 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old31 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old31 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old31 Jul 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old31 Jul 2017 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old31 Jul 2017 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old15 Nov 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking wateryes
Fire safety (as filed with RERA)yes
Renewable energyyes

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameGAYATRI INFRA PLANNER PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM5277
PANAAECG8895N
CIN / TANU45400DL2011PTC300950
Name of chairmanMR. RAKESH KUMAR SRIVASTAVAMR. HITESH BHASIN
Registered address1/7098, 2nd Floor, Gali No. 5, Shivaji Park, Shahdara, Delhi -110032
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
GAYATRI INFRA PLANNNER PVT LTDBankHDFC BANK LTDBranchHDFC BANK LTD SECTOR 16 NOIDAA/C no.IFSCHDFC0001351
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)105 (Under Registration - 1 ) → 106 (Under Registration - 2 )
changed in Estanzo’s record
27 Sept 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 27 Sept 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.

Common questions about GAYATRI LIFE

Is GAYATRI LIFE RERA registered?

Yes. GAYATRI LIFE is registered with UPRERA under registration number UPRERAPRJ7360, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for GAYATRI LIFE?

The completion date filed with UPRERA is 30 Sept 2025. No completion certificate is on record yet.

Who is the builder of GAYATRI LIFE?

GAYATRI INFRA PLANNER PRIVATE LIMITED is the promoter entity that filed GAYATRI LIFE with UPRERA (promoter RERA ID UPRERAPRM5277). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does GAYATRI LIFE show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted GAYATRI LIFE more time to complete?

UPRERA's record carries 2 completion extensions for GAYATRI LIFE, the latest running to 30 Sept 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does GAYATRI LIFE have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is GAYATRI LIFE located?

GAYATRI LIFE is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in GAYATRI LIFE?

The unit plan filed with UPRERA lists SHOP, 1 BHK, 2 BHK, OTHER, 3 BHK and 4 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in GAYATRI LIFE?

The approved unit plan filed with UPRERA runs from 20 to 102 m² of carpet area (about 220 to 1,098 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in GAYATRI LIFE?

The approved unit plan describes 5 blocks and 852 units of which 829 are homes and 23 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is GAYATRI LIFE?

About 194 units per acre: 852 planned units across 4.39 acres (17,775 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗