Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ837427
Project categoryResidential
Registration typeNew
RERA statusCompleted
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryKanpur Development Authority
Proposed start22 Feb 2022
Project duration50 months
AddressKanpur, Kanpur Nagar
TehsilKanpur
Applicant typeIndividual
Applicant addressHouse No.8/21, Arya Nagar, Kanpur Nagar-208002, U.P.
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Permit revalidated (4)

  2. 5 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. to

    Extension granted

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. Completion certificate filed

  8. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Completed.
Quarterly report cadence
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered2 Nov 2023
Original completion31 Mar 2025
Revised completion31 Mar 2026
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary19 Feb 2026
Registration fee₹1,41,500
Sanctioning authorityKanpur Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors520 · 2 · 9 (units from plan)
  • 2 BHK490 94%
  • 4 BHK30 6%
ConfigurationUnitsCarpet area
2 BHK49060
4 BHK30121
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
BLOCK A · 2 BHK, 4 BHK942860-121
CENTRAL BLOCK · 2 BHK89260
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Mr. Abhishek Singh
License CA/2013/60896
Gooba Garden, Kanpur
Engineer
Mr. A. K. Verma
Arya Nagar, Kanpur
Contractor
Gupta Contactor
Sachendi, Kanpur
Sr.Development work declared to RERA
1Demarcation of Plots
Project Land is duly demarcated having Boundary Wall.
2Boundary Wall
Boundary Wall having brick work and RCC Pillers.
3Road Work
20 Feets wide internal Roads already made.
4Footpaths
20 Feet wide Internal Roads.
5Water Supply Including Drinking Water Facilities
Available, Comleted and Facility is already operational.
6Sewer System
Available, Completed and Operational Modular Sewage Treatment Plant
7Drain
Available, Comleted and Operatinal
8Parks
In progess. To be provided as per Approved Map
9Tree Planting
In Progress. Platns of various varities to be planted.
10Design For Electric Supply Including Street Lighting
Completed and Operational.
11Community Buildings
In progress.
12Treatment and Disposal System of Sewage and Sullage water
Modular Sewage Treatment Plant already operational.
13Solid Waste Management And Disposal System
Yes, it will be as per Municipal guidelines.
14Water Conservation System
Yes
15Energy Management System Including Use of Renewable Energy
Yes
16Fire Protection And Fire Safety System
Provided as per guidelines of Fire Department.
17Social Infrastructure And Other Public Amenities Including Public Health Services
In Progess
18Emergency Evacuation Services
Yes Available and compelted
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

5 permits

An approval and the date it runs to - not proof the work matching it was done.

5 sanctioning permits are on record with UPRERA, the latest valid to 6 Apr 2027. 4 of them carry a revalidation, the latest valid to 6 Apr 2027.

Sanctioned by Kanpur Development Authority · 27,268 sqm of land · an approved plan of 2 blocks and 520 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
Group Housing/01152/KDA/BP/20-21/0261/2506202122 Feb 202221 Feb 202721 Feb 202931 Mar 2025—
GROUPHOUSING/01152/KDA/BP20-21/0261/2506202122 Feb 202221 Feb 20271 Mar 202831 Mar 202522 Feb 2022
valid to 3 Mar 2027
GROUPHOUSING/01152/KDA/BP20-21/0261/2506202122 Feb 20223 Mar 20277 Apr 202731 Mar 202622 Feb 2022
valid to 6 Apr 2027
14/ENF-2/SHAMAN/2025-2622 Feb 20226 Apr 20277 Apr 202731 Mar 202622 Feb 2022
14/ENF-2/SHAMAN/2025-2622 Feb 20226 Apr 20277 Apr 202731 Mar 202622 Feb 2022
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 31 Mar 2026.

#Granted fromExtended uptoNote
131 Mar 202531 Mar 2026—

Land & documents

42 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
530/22970Khasra
528/21740Khasra
529441Khasra
531/22460Khasra
532/1200Khasra
527/23840Khasra
533/21450Khasra
544410Khasra
5451130Khasra
532min.310Khasra
528/1310Khasra
531/1510Khasra
530Min.3280Khasra
533/17480Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1427-32
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1427-32
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Sale deed · 47
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1450
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1398
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 4197
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
General body resolution
The resolution authorising an apartment owners’ association to act as the registering entity.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New26 Sept 2023 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New22 Aug 2023 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New22 Aug 2023 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New13 Sept 2023 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New12 Sept 2023 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New6 Oct 2023 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New6 Oct 2023 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New26 Sept 2023 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New22 Aug 2023 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New26 Sept 2023 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New26 Sept 2023 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New22 Aug 2023 ↗
Affidavit on balance development work
The promoter’s sworn statement about the development work still to be finished.
New22 Aug 2023 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New26 Sept 2023 ↗

Quarterly progress reports

16 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

16 quarterly progress reports are on file with UPRERA, covering 2021-Q4 to 2025-Q3.

QuarterConstructionCertificates
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1100%CA ↗ · Arch ↗ · Eng ↗
2025-Q2100%CA ↗ · Arch ↗ · Eng ↗
2025-Q3—Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2025-Q2. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSHRI VIJAY KUMAR MEHROTRA
RolePromoter · current
RERA IDUPRERAPRM244641
PANABDPM6187G
Registered addressHouse No.8/21, Arya Nagar, Kanpur Nagar-208002, U.P.
RERA contact
Registered since2023
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameMRS. SWATI TANDON
RoleCo-promoter
Applicant typeIndividual
AddressFlat No.201 Tower No,08, Vaishali Nagar, Manglam Rangoli Greens, Panchyawala, Jaipur, Rajsthan-302034
RERA contact
Legal nameMRS. SUPERNA KAUSHAL
RoleCo-promoter
Applicant typeIndividual
AddressFlat No.765, 767, Anand Gooba Garden, Kalyanpur, Kanpur Nagar-208017, U.P.
RERA contact
Legal nameMRS. ABHA MEHROTRA
RoleCo-promoter
Applicant typeIndividual
AddressHouse No.8/21, Arya Nagar, Kanpur Nagar-208002, U.P.
RERA contact
Legal nameMRS. MAYURI TANDON
RoleCo-promoter
Applicant typeIndividual
AddressH. No.33 HIG-A Dr. A. S. Rao Nagar, Kushaiguda ECIL Post, Kapra Ranga Reddy District Hyderabad, Andhra Pradesh-500062
RERA contact
Legal nameMRS. SUDHA MEHROTRA
RoleCo-promoter
Applicant typeIndividual
AddressHouse No.8/21, Arya Nagar, Kanpur Nagar-208002, U.P.
RERA contact
Legal nameMR. NITESH MEHROTRA
RoleCo-promoter
Applicant typeIndividual
AddressHouse No.8/21, Arya Nagar, Kanpur Nagar-208002, U.P.
RERA contact
Legal nameMR. SANTOSH KUMAR MEHROTRA
RoleCo-promoter
Applicant typeIndividual
AddressHouse No.8/21, Arya Nagar, Kanpur Nagar-208002, U.P.
RERA contact
Legal nameMR. BHARAT MEHROTRA
RoleCo-promoter
Applicant typeIndividual
AddressHouse No.8/21, Arya Nagar, Kanpur Nagar-208002, U.P.
RERA contact

Nearby projects

Kanpur Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
VIJAY KUMAR MEHROTRA- COLLECTION ACCOUNT FOR GOOBA CITYBankINDIAN BANKBranchKANPUR BRANCHBranch address50/276, HALSEY ROAD, KANPURBranch districtKanpur Nagar, Uttar PradeshA/C no.IFSCIDIB000K014Branch emailk014attherateindianbank.co.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
VIJAY KUMAR MEHROTRA- SEPARATE ACCOUNT FOR GOOBA CITYBankINDIAN BANKBranchKANPUR BRANCHBranch address50/276, HALSEY ROAD, KANPURBranch districtKanpur Nagar, Uttar PradeshA/C no.IFSCIDIB000K014
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
VIJAY KUMAR MEHROTRA- TRANSACTION ACCOUNT FOR GOOBA CITYBankINDIAN BANKBranchKANPUR BRANCHBranch address50/276, HALSEY ROAD, KANPURBranch districtKanpur Nagar, Uttar PradeshA/C no.IFSCIDIB000K014Branch emailk014attherateindianbank.co.in
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Gooba City

Is Gooba City RERA registered?

Yes. Gooba City is registered with UPRERA under registration number UPRERAPRJ837427, registered on 2 Nov 2023. Estanzo reproduces that filing; it does not verify the work behind it.

Has Gooba City been completed?

UPRERA lists Gooba City as completed, with a completion certificate dated 19 Feb 2026, against a filed deadline of 31 Mar 2026.

Who is the builder of Gooba City?

SHRI VIJAY KUMAR MEHROTRA is the promoter entity that filed Gooba City with UPRERA (promoter RERA ID UPRERAPRM244641). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Gooba City more time to complete?

UPRERA's record carries 1 completion extension for Gooba City, the latest running to 31 Mar 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Gooba City have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Gooba City located?

Gooba City is registered in Kanpur Nagar, as filed with UPRERA.

What configurations are available in Gooba City?

The unit plan filed with UPRERA lists 2 BHK and 4 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Gooba City?

The approved unit plan filed with UPRERA runs from 60 to 121 m² of carpet area (about 650 to 1,300 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Gooba City?

The approved unit plan describes 2 blocks and 520 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Gooba City?

About 77 units per acre: 520 planned units across 6.74 acres (27,268 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗