Gooba City is a RERA-registered residential project by SHRI VIJAY KUMAR MEHROTRA in Kanpur Nagar (RERA ID UPRERAPRJ837427). RERA status: Completed on 19 Feb 2026.
RERA status as reported: Completed.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ837427 |
| Project category | Residential |
| Registration type | New |
| RERA status | Completed |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Kanpur Development Authority |
| Proposed start | 22 Feb 2022 |
| Project duration | 50 months |
| Address | Kanpur, Kanpur Nagar |
| Tehsil | Kanpur |
| Applicant type | Individual |
| Applicant address | House No.8/21, Arya Nagar, Kanpur Nagar-208002, U.P. |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Permit revalidated (4)
5 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 2 Nov 2023 |
| Original completion | 31 Mar 2025 |
| Revised completion | 31 Mar 2026 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 19 Feb 2026 |
| Registration fee | ₹1,41,500 |
| Sanctioning authority | Kanpur Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 2 BHK490 94%
- 4 BHK30 6%
| Configuration | Units | Carpet area |
|---|---|---|
| 2 BHK | 490 | 60 |
| 4 BHK | 30 | 121 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| BLOCK A · 2 BHK, 4 BHK | 9 | 428 | 60-121 |
| CENTRAL BLOCK · 2 BHK | 8 | 92 | 60 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Project Land is duly demarcated having Boundary Wall. |
| 2 | Boundary Wall Boundary Wall having brick work and RCC Pillers. |
| 3 | Road Work 20 Feets wide internal Roads already made. |
| 4 | Footpaths 20 Feet wide Internal Roads. |
| 5 | Water Supply Including Drinking Water Facilities Available, Comleted and Facility is already operational. |
| 6 | Sewer System Available, Completed and Operational Modular Sewage Treatment Plant |
| 7 | Drain Available, Comleted and Operatinal |
| 8 | Parks In progess. To be provided as per Approved Map |
| 9 | Tree Planting In Progress. Platns of various varities to be planted. |
| 10 | Design For Electric Supply Including Street Lighting Completed and Operational. |
| 11 | Community Buildings In progress. |
| 12 | Treatment and Disposal System of Sewage and Sullage water Modular Sewage Treatment Plant already operational. |
| 13 | Solid Waste Management And Disposal System Yes, it will be as per Municipal guidelines. |
| 14 | Water Conservation System Yes |
| 15 | Energy Management System Including Use of Renewable Energy Yes |
| 16 | Fire Protection And Fire Safety System Provided as per guidelines of Fire Department. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services In Progess |
| 18 | Emergency Evacuation Services Yes Available and compelted |
| 19 | Other Miscellaneous Work NA |
Permits & extensions
5 permits
An approval and the date it runs to - not proof the work matching it was done.
5 sanctioning permits are on record with UPRERA, the latest valid to 6 Apr 2027. 4 of them carry a revalidation, the latest valid to 6 Apr 2027.
Sanctioned by Kanpur Development Authority · 27,268 sqm of land · an approved plan of 2 blocks and 520 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| Group Housing/01152/KDA/BP/20-21/0261/25062021 | 22 Feb 2022 | 21 Feb 2027 | 21 Feb 2029 | 31 Mar 2025 | — | |
| GROUPHOUSING/01152/KDA/BP20-21/0261/25062021 | 22 Feb 2022 | 21 Feb 2027 | 1 Mar 2028 | 31 Mar 2025 | 22 Feb 2022 valid to 3 Mar 2027 | |
| GROUPHOUSING/01152/KDA/BP20-21/0261/25062021 | 22 Feb 2022 | 3 Mar 2027 | 7 Apr 2027 | 31 Mar 2026 | 22 Feb 2022 valid to 6 Apr 2027 | |
| 14/ENF-2/SHAMAN/2025-26 | 22 Feb 2022 | 6 Apr 2027 | 7 Apr 2027 | 31 Mar 2026 | 22 Feb 2022 | |
| 14/ENF-2/SHAMAN/2025-26 | 22 Feb 2022 | 6 Apr 2027 | 7 Apr 2027 | 31 Mar 2026 | 22 Feb 2022 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 31 Mar 2026.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 Mar 2025 | 31 Mar 2026 | — |
Land & documents
42 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 530/2 | 2970 | Khasra |
| 528/2 | 1740 | Khasra |
| 529 | 441 | Khasra |
| 531/2 | 2460 | Khasra |
| 532/1 | 200 | Khasra |
| 527/2 | 3840 | Khasra |
| 533/2 | 1450 | Khasra |
| 544 | 410 | Khasra |
| 545 | 1130 | Khasra |
| 532min. | 310 | Khasra |
| 528/1 | 310 | Khasra |
| 531/1 | 510 | Khasra |
| 530Min. | 3280 | Khasra |
| 533/1 | 7480 | Khasra |
| Khatauni extract · 1427-32 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1427-32 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Sale deed · 47 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1450 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1398 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 4197 The registered deed by which the promoter bought the land. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| General body resolution The resolution authorising an apartment owners’ association to act as the registering entity. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 26 Sept 2023 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 22 Aug 2023 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 22 Aug 2023 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 13 Sept 2023 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 12 Sept 2023 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 6 Oct 2023 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 6 Oct 2023 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 26 Sept 2023 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 22 Aug 2023 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 26 Sept 2023 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 26 Sept 2023 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 22 Aug 2023 ↗ |
| Affidavit on balance development work The promoter’s sworn statement about the development work still to be finished. | New | 22 Aug 2023 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 26 Sept 2023 ↗ |
Quarterly progress reports
16 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
16 quarterly progress reports are on file with UPRERA, covering 2021-Q4 to 2025-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | — | Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | SHRI VIJAY KUMAR MEHROTRA |
| Role | Promoter · current |
| RERA ID | UPRERAPRM244641 |
| PAN | ABDPM6187G |
| Registered address | House No.8/21, Arya Nagar, Kanpur Nagar-208002, U.P. |
| RERA contact | |
| Registered since | 2023 |
| Legal name | MRS. SWATI TANDON |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | Flat No.201 Tower No,08, Vaishali Nagar, Manglam Rangoli Greens, Panchyawala, Jaipur, Rajsthan-302034 |
| RERA contact |
| Legal name | MRS. SUPERNA KAUSHAL |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | Flat No.765, 767, Anand Gooba Garden, Kalyanpur, Kanpur Nagar-208017, U.P. |
| RERA contact |
| Legal name | MRS. ABHA MEHROTRA |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | House No.8/21, Arya Nagar, Kanpur Nagar-208002, U.P. |
| RERA contact |
| Legal name | MRS. MAYURI TANDON |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | H. No.33 HIG-A Dr. A. S. Rao Nagar, Kushaiguda ECIL Post, Kapra Ranga Reddy District Hyderabad, Andhra Pradesh-500062 |
| RERA contact |
| Legal name | MRS. SUDHA MEHROTRA |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | House No.8/21, Arya Nagar, Kanpur Nagar-208002, U.P. |
| RERA contact |
| Legal name | MR. NITESH MEHROTRA |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | House No.8/21, Arya Nagar, Kanpur Nagar-208002, U.P. |
| RERA contact |
| Legal name | MR. SANTOSH KUMAR MEHROTRA |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | House No.8/21, Arya Nagar, Kanpur Nagar-208002, U.P. |
| RERA contact |
| Legal name | MR. BHARAT MEHROTRA |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | House No.8/21, Arya Nagar, Kanpur Nagar-208002, U.P. |
| RERA contact |
Nearby projects
Kanpur Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | VIJAY KUMAR MEHROTRA- COLLECTION ACCOUNT FOR GOOBA CITYBankINDIAN BANKBranchKANPUR BRANCHBranch address50/276, HALSEY ROAD, KANPURBranch districtKanpur Nagar, Uttar PradeshA/C no.IFSCIDIB000K014Branch emailk014attherateindianbank.co.in |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | VIJAY KUMAR MEHROTRA- SEPARATE ACCOUNT FOR GOOBA CITYBankINDIAN BANKBranchKANPUR BRANCHBranch address50/276, HALSEY ROAD, KANPURBranch districtKanpur Nagar, Uttar PradeshA/C no.IFSCIDIB000K014 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | VIJAY KUMAR MEHROTRA- TRANSACTION ACCOUNT FOR GOOBA CITYBankINDIAN BANKBranchKANPUR BRANCHBranch address50/276, HALSEY ROAD, KANPURBranch districtKanpur Nagar, Uttar PradeshA/C no.IFSCIDIB000K014Branch emailk014attherateindianbank.co.in |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Gooba City
Is Gooba City RERA registered?
Yes. Gooba City is registered with UPRERA under registration number UPRERAPRJ837427, registered on 2 Nov 2023. Estanzo reproduces that filing; it does not verify the work behind it.
Has Gooba City been completed?
UPRERA lists Gooba City as completed, with a completion certificate dated 19 Feb 2026, against a filed deadline of 31 Mar 2026.
Who is the builder of Gooba City?
SHRI VIJAY KUMAR MEHROTRA is the promoter entity that filed Gooba City with UPRERA (promoter RERA ID UPRERAPRM244641). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Gooba City more time to complete?
UPRERA's record carries 1 completion extension for Gooba City, the latest running to 31 Mar 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Gooba City have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Gooba City located?
Gooba City is registered in Kanpur Nagar, as filed with UPRERA.
What configurations are available in Gooba City?
The unit plan filed with UPRERA lists 2 BHK and 4 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in Gooba City?
The approved unit plan filed with UPRERA runs from 60 to 121 m² of carpet area (about 650 to 1,300 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in Gooba City?
The approved unit plan describes 2 blocks and 520 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Gooba City?
About 77 units per acre: 520 planned units across 6.74 acres (27,268 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗