Green Avenue

UPRERANCLT

Green Avenue is a RERA-registered residential project by J.B.K. DEVELOPERS PRIVATE LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ3606). RERA status: NCLT (since 17 Aug 2020). UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: NCLT.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ3606
Project categoryResidential
Registration typeOngoing
RERA statusNCLTNCLTThe tribunal that hears company insolvency cases. UP-RERA lists projects whose promoter is before it.Read the full entry in the glossary
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAny Other Competent Authority
Proposed start4 Oct 2012
Original start4 Oct 2012
Project duration100 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant address99, PATPAR GANJ, DELHI-110091
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Permit revalidated (2)

  3. 3 building permits sanctioned

  4. Registered with RERA

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. NCLT order

  8. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as NCLT. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered31 Jul 2017
Original completion1 Aug 2020
Revised completion31 Jan 2021
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,81,000
Sanctioning authorityAny Other Competent Authority
NCLT order date17 Aug 2020

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors1,253 · 9 · 16 (units from plan)
Homes · commercial units1,217 · 36 (shops and offices filed in the same plan)
  • 2 BHK517 41%
  • 3 BHK482 38%
  • STUDIO176 14%
  • SHOP36 3%
  • 4 BHK26 2%
  • Other16 1%
ConfigurationUnitsCarpet area
3 BHK48272-103
2 BHK51755
4 BHK26135-136
SHOP368-17
OTHER1512-27
STUDIO17623-49
PENTHOUSE1185
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
BETEL · 2 BHK, 3 BHK1514655-72
CASPIA · 2 BHK, 3 BHK1511555-72
GREENOTEL · SHOP, OTHER, STUDIO, PENTHOUSE152288-49
IRIS · 2 BHK, 3 BHK1511555-72
LOTUS · 3 BHK1510272-89
ORCHID · 3 BHK1510272-89
Oakwood · 2 BHK1318255
ROSEWOOD · 2 BHK, 3 BHK, 4 BHK1311755-136
TULIP · 2 BHK, 3 BHK1514655-72
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
SUDHIR KUMAR BANSAL
License 99/25025
A-130, SURAJMAL VIHAR, DELHI - 110092
Engineer
NAVEEN JAITLEY
E-60, 2ND FLOOR, MASJID MOTH, GREATER KAILASH - III, NEW DELHI - 110048
Contractor
VK Agarwal & Co Pvt Ltd
E 44,GF, Sector 3, Noida 201301
Sr.Development work declared to RERA
1Demarcation of Plots
YES
2Boundary Wall
RCC Column, Plinth beam and Brick work with Finishing
3Road Work
YES
4Footpaths
YES
5Water Supply Including Drinking Water Facilities
GI/PVC line for cold water and cPVC for internal concealed pipe line
6Sewer System
PVC/CI inside building and RCC hume pipe line for external with manholes.
7Drain
PVC/CI inside building and RCC hume pipe line for external with manholes.
8Parks
As per submission plans.. Green area with plantation
9Tree Planting
As per Submission plans
10Design For Electric Supply Including Street Lighting
Street lights as per drawings
11Community Buildings
As per plan with party hall, indoor games other amenties.
12Treatment and Disposal System of Sewage and Sullage water
STP with required capacity as per SEAC norms
13Solid Waste Management And Disposal System
Organic Waste Composter as per SEAC norms.
14Water Conservation System
Rain water harvesting pit as EC conditions.
15Energy Management System Including Use of Renewable Energy
LT panel room with duel source energy supply
16Fire Protection And Fire Safety System
As per fire approval as NBC
17Social Infrastructure And Other Public Amenities Including Public Health Services
Amphetheter, children play areas etc.
18Emergency Evacuation Services
NA
19Other Miscellaneous Work
Gated/Controlled entry and exsess
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

3 permits

An approval and the date it runs to - not proof the work matching it was done.

3 sanctioning permits are on record with UPRERA, the latest valid to 26 Aug 2020. 2 of them carry a revalidation.

Sanctioned by Any Other Competent Authority · 35,154 sqm of land · an approved plan of 9 blocks and 1253 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
344-346/SIDC/ATP27 Aug 201526 Aug 202026 Aug 20201 Aug 2020—
344-346/SIDC/ATP27 Aug 201526 Aug 202026 Aug 20201 Aug 202027 Aug 2015
344-346/SIDC/ATP27 Aug 201526 Aug 202026 Aug 20201 Aug 202027 Aug 2015
Plans and approvals filed with RERA
DocumentFile
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 31 Jan 2021.

#Granted fromExtended uptoNote
11 Aug 202031 Jan 2021Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

11 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
NANA—
HRA1035154Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 15 Oct 2011.

Registry no.DateTypeArea
1956315 Oct 2011self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 19563
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New10 Jul 2020 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old28 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old9 Jan 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old9 Jan 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
Old9 Jan 2018 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
Old9 Jan 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
Old9 Jan 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
Old9 Jan 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
Old9 Jan 2018 ↗

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameJ.B.K. DEVELOPERS PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM5987
PANAABCJ5215C
CIN / TANU45201DL2003PTC121434
Registered address99, PATPAR GANJ, DELHI-110091
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
J.B.K. Developers Pvt. Ltd.BankHDFC BANK LTD.BranchSector 16 NoidaA/C no.IFSCHDFC0001351
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Green Avenue

Is Green Avenue RERA registered?

Yes. Green Avenue is registered with UPRERA under registration number UPRERAPRJ3606, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Green Avenue?

The completion date filed with UPRERA is 31 Jan 2021. No completion certificate is on record yet.

Who is the builder of Green Avenue?

J.B.K. DEVELOPERS PRIVATE LIMITED is the promoter entity that filed Green Avenue with UPRERA (promoter RERA ID UPRERAPRM5987). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does Green Avenue show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted Green Avenue more time to complete?

UPRERA's record carries 1 completion extension for Green Avenue, the latest running to 31 Jan 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Green Avenue have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Green Avenue located?

Green Avenue is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in Green Avenue?

The unit plan filed with UPRERA lists 3 BHK, 2 BHK, 4 BHK, SHOP, OTHER, STUDIO and PENTHOUSE. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Green Avenue?

The approved unit plan filed with UPRERA runs from 8 to 185 m² of carpet area (about 88 to 1,993 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Green Avenue?

The approved unit plan describes 9 blocks and 1,253 units of which 1,217 are homes and 36 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Green Avenue?

About 144 units per acre: 1,253 planned units across 8.69 acres (35,154 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗