GURU KRIPA SANGAM is a RERA-registered residential project by Shree Badrinath Constructions in Mathura (RERA ID UPRERAPRJ687497). Registered with a completion deadline of 31 Mar 2025.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ687497 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Mathura-Vrindavan Development Authority |
| Proposed start | 1 Aug 2022 |
| Project duration | 32 months |
| Address | Mathura, Mathura |
| Tehsil | Mathura |
| Applicant type | Proprietorship Firm |
| Applicant address | 68, Mayur Vihar, Dholi Pyau, Mathura, U.P., 281001 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
Plotted Resi Development/ Plotted Housing/02076/MVDA/LD/22-23/0218/21062022
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 10 Sept 2022 |
| Original completion | 31 Mar 2025 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 14 Aug 2025 |
| Registration fee | ₹1,44,000 |
| Sanctioning authority | Mathura-Vrindavan Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots There are total of 75 Residential plots in the project . All the plots will be demarcated as per the approved plan by MVDA in line with facing and dimensions. State of Art equipment will be used for exact measurements. |
| 2 | Boundary Wall The boundary walls will be constructed at the open periphery of the project land . a 6 to 8 feet high brick wall as per site requirement will be constructed using cement mortar. The foundation of the wall will be 4 to 5 feet deep to resist weather impact. The brick wall will be plastered and painted . |
| 3 | Road Work 9m wide road sections will be constructed in the project covering the total of 6950 sq.m approx. The Paver blocks of 6 inch thickness and strength of 20MPa will be laid over sand bed of 50 mm. that will be laid over the 150mm granular layer compacted to required density. |
| 4 | Footpaths The footpaths will be constructed at suitable location to assist pedestrian walks. The 4 inch thick paver locks of M-10 grade laid over 50mm sand bed. The base underneath will be compacted by mechanical means to achieve the required compaction to provide stability to the pavement above |
| 5 | Water Supply Including Drinking Water Facilities As per the approval by MVDA, the individual / clubbed submersible pumps will be installed to extract potable ground water. The pumps will be installed of capacity to pump the water to the minimum of 30ft above ground level. |
| 6 | Sewer System The under ground sewer system will be constructed along the project catering for all the residential plots. The 300 mm dia and 450mm dia concrete conduits will be installed maintaining the minimum slope of 1in 100 to assist flow . The inspection chambers will be installed between 2 residential plots and at grade changes to assist the maintenance of sewage line. In addition as per approved map by MVDA each residential unit will have individual two stage septic tanks. The precast septic tanks will be installed along with discharge connection for each unit. |
| 7 | Drain The combination of Lined open and closed drains along with collection chambers will be constructed in the project. The drains will be constructed in brick work plastered with cement sand mix over the 100mm DLC. the minimum section of drain with be 300X300X250 tapered at bottom to assist head and flow. |
| 8 | Parks Three number of lush green parks with be prepared as per the approve map. Additional facilities such as sitting areas for elderly will also be provided. Total Park area 4470 Sq.m Approx. |
| 9 | Tree Planting All season trees will will be planted along the periphery of project land and at all suitable common areas of the project. |
| 10 | Design For Electric Supply Including Street Lighting A separate transformer will be acquired as per the load calculations done by DVVNL. The overhead connections will be lead to each residential unit through electrical poles and distribution boxes. The street lights will be installed at minimum height of 4.5m. |
| 11 | Community Buildings Not Applicable |
| 12 | Treatment and Disposal System of Sewage and Sullage water Not Applicable though, Individual Septic Tank for each individual unit will be installed as per approved map. |
| 13 | Solid Waste Management And Disposal System The Garbage collection areas two in numbers spread for 68.77 sq.m will be constructed in the project area along with dustbins installed at all locations for collection of domestic garbage. |
| 14 | Water Conservation System Rain water harvesting pits of 0.5mx3m pits will be constructed where the surface run-offs will be directed towards. The layered filter system will be installed in three layers moving from Ballast layer, Stone Grit layer and above it the sand layer. The PVC perforated pipe will be installed as bore of 100mm dia. to the minimum depth of 10m. |
| 15 | Energy Management System Including Use of Renewable Energy Not Applicable |
| 16 | Fire Protection And Fire Safety System Not Applicable |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Not Applicable |
| 18 | Emergency Evacuation Services Not Applicable |
| 19 | Other Miscellaneous Work All necessary improvement required for project will be put in place within the gambit of approved map |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 28 Jul 2027.
Sanctioned by Mathura-Vrindavan Development Authority · 27,793 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| Plotted Resi Development/ Plotted Housing/02076/MVDA/LD/22-23/0218/21062022 | 29 Jul 2022 | 28 Jul 2027 | 27 Jul 2030 | 31 Mar 2025 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
Land & documents
25 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 4/3 Muja Sarai Ajamabad | 11990 | Khasra |
| 4/1 Mauja Saray Ajamabad | 3752.835 | Khasra |
| 4, Mauja Saray Ajamabad | 2140 | Khasra |
| 28(mi) Mauja Saray Ajamabad | 350.70 | Khasra |
| 7/2 Mauja Saray Ajamabad | 1130.964 | Khasra |
| 4/2 Mauja Saray Ajamabad | 2550 | Khasra |
| 4/2, Mauja Saray Ajamabad | 2550 | Khasra |
| 4/2 Mauja Saray Ajamabad | 2550 | Khasra |
| 28(mi), Mauja Saray Ajamabad | 785 | Khasra |
| Registry document · 15917 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 15230 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 16753 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 18521 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 15224 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 14442 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 14441 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 14493 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 18520 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Allotment letter from the authority · N.A The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 6 Sept 2022 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 7 Aug 2022 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 7 Aug 2022 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 7 Aug 2022 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 9 Aug 2022 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 9 Aug 2022 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 9 Aug 2022 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 9 Aug 2022 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 30 Aug 2022 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 7 Aug 2022 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 7 Aug 2022 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 7 Aug 2022 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 6 Sept 2022 ↗ |
Quarterly progress reports
11 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
11 quarterly progress reports are on file with UPRERA, covering 2022-Q2 to 2024-Q4.
| Quarter | Construction | Certificates |
|---|---|---|
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Shree Badrinath Constructions |
| Role | Promoter · current |
| RERA ID | UPRERAPRM71329 |
| PAN | CIWPS6269K |
| CIN / TAN | AGRR13059E |
| Registered address | 68, Mayur Vihar, Dholi Pyau, Mathura, U.P., 281001 |
| RERA contact | |
| Registered since | 2019 |
Nearby projects
Mathura
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Shree Badrinath Constructions Collection Account for Guru Kripa SangamBankAxis BankBranchMathura, U.PBranch addressOjal Mall, Opposite Hotel Mukund Palace, Junction Road, Mathura, U.P-281001Branch districtMathura, Uttar PradeshA/C no.IFSCUTIB0000359 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Shree Badrinath Constructions Separate Account for Guru Kripa SangamBankAxis BankBranchMathura , U.PBranch addressOjal Mall, Opposite Hotel Mukund Palace, Junction Road, Mathura, U.P -281001Branch districtMathura, Uttar PradeshA/C no.IFSCUTIB0000359 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Shree Badrinath Constructions Transaction Account For Guru Kripa SangamBankAxis BankBranchMathura, U.PBranch addressOjal Mall, Opposite Hotel Mukund Palace, Junction Road, Mathura, U.P 281001Branch districtMathura, Uttar PradeshA/C no.IFSCUTIB0000359 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about GURU KRIPA SANGAM
Is GURU KRIPA SANGAM RERA registered?
Yes. GURU KRIPA SANGAM is registered with UPRERA under registration number UPRERAPRJ687497, registered on 10 Sept 2022. Estanzo reproduces that filing; it does not verify the work behind it.
Has GURU KRIPA SANGAM been completed?
UPRERA still lists GURU KRIPA SANGAM as Registered, so it is not shown as completed here. A completion certificate dated 14 Aug 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of GURU KRIPA SANGAM?
Shree Badrinath Constructions is the promoter entity that filed GURU KRIPA SANGAM with UPRERA (promoter RERA ID UPRERAPRM71329). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does GURU KRIPA SANGAM have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is GURU KRIPA SANGAM located?
GURU KRIPA SANGAM is registered in Mathura, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗