HARMONY

UPRERARegistered

HARMONY is a RERA-registered residential project by PRECIOUS BUILDTECH PVT. LTD. in Bareilly (RERA ID UPRERAPRJ9571). Registered with a completion deadline of 28 Jun 2021. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ9571
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryBareily Development Authority
Proposed start1 Jul 2014
Original start16 Nov 2013
Project duration84 months
AddressBareilly, Bareilly
TehsilBareilly
Applicant typeCompany
Applicant addressD-246/10, BALAJI CHEMBERS, LAXMI NAGAR,DELHI-110092
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    NA

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered11 Aug 2017
Original completion30 Jun 2019
Revised completion28 Jun 2021
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹88,000
Sanctioning authorityBareily Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors468 · 9 · 13 (units from plan)
  • 2 BHK260 56%
  • 3 BHK156 33%
  • OTHER52 11%
ConfigurationUnitsCarpet area
3 BHK15685
OTHER5273
2 BHK26062-63
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
BLOCK A1 · 3 BHK, OTHER135273-85
BLOCK A2 · 3 BHK, OTHER135273-85
BLOCK A3 · 2 BHK135262
BLOCK A4 · 2 BHK135262
BLOCK A5 · 2 BHK135262-63
BLOCK B1 · 3 BHK, OTHER135273-85
BLOCK B2 · 3 BHK, OTHER135273-85
BLOCK B3 · 2 BHK135262
BLOCK B4 · 2 BHK135262-63
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
NA
License NA
NA
Engineer
NA
NA
Contractor
NA
NA
Sr.Development work declared to RERA
1Demarcation of Plots
NORTH 31.11 MTR, WEST 250.39 MTR, EAST 245.64, SOUTH 86.71 MTR
2Boundary Wall
AS PER NORMS/SCHEME/APPROVED MAP
3Road Work
AS PER NORMS/SCHEME/APPROVED MAP
4Footpaths
NA
5Water Supply Including Drinking Water Facilities
AS PER NORMS/SCHEME/APPROVED MAP
6Sewer System
AS PER NORMS/SCHEME/APPROVED MAP
7Drain
AS PER NORMS/SCHEME/APPROVED MAP
8Parks
AS PER NORMS/SCHEME/APPROVED MAP
9Tree Planting
AS PER NORMS/SCHEME/APPROVED MAP
10Design For Electric Supply Including Street Lighting
AS PER NORMS/SCHEME/APPROVED MAP
11Community Buildings
AS PER NORMS/SCHEME/APPROVED MAP
12Treatment and Disposal System of Sewage and Sullage water
AS PER NORMS/SCHEME/APPROVED MAP
13Solid Waste Management And Disposal System
AS PER NORMS/SCHEME/APPROVED MAP
14Water Conservation System
AS PER NORMS/SCHEME/APPROVED MAP
15Energy Management System Including Use of Renewable Energy
AS PER NORMS/SCHEME/APPROVED MAP
16Fire Protection And Fire Safety System
AS PER NORMS/SCHEME/APPROVED MAP
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
AS PER NORMS/SCHEME/APPROVED MAP
19Other Miscellaneous Work
AS PER NORMS/SCHEME/APPROVED MAP
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 15 Nov 2018.

Sanctioned by Bareily Development Authority · 16,586 sqm of land · an approved plan of 9 blocks and 468 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
NA16 Nov 201315 Nov 201815 Nov 202130 Jun 2019
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 28 Jun 2021.

#Granted fromExtended uptoNote
130 Jun 201928 Jun 2021—

Land & documents

21 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
NANA—
148-1493246.66Khasra
148-1493250Khasra
148-1493240Khasra
148-1492340Khasra
1443255Khasra
146-1471255Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 20 Apr 2012.

Registry no.DateTypeArea
430620 Apr 2012self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 4306
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 5830
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 5829
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9423
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 11055
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 11625
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New31 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New31 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New31 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New19 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New6 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New6 Jul 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old11 Aug 2017 ↗

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal namePRECIOUS BUILDTECH PVT. LTD.
RolePromoter · current
RERA IDUPRERAPRM10087
PANAAGCP1255R
CIN / TANLKNP07533B
Name of chairmanMANVINDRA SINGH CHHABRA
Registered addressD-246/10, BALAJI CHEMBERS, LAXMI NAGAR,DELHI-110092
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
PRECIOUS BUILDTECH PVT. LTDBankTHE NAINITAL BANK LTDBranchPRABHAT NAGAR, BAREILLYA/C no.IFSC0751000000000247
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

2 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)33 (Under Registration - 2 ) → 33 (Under Registration - 0 )
changed in Estanzo’s record
19 Sept 2026
Promoter’s complaints tally (all their projects)31 (Under Registration - 0 ) → 33 (Under Registration - 2 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 19 Sept 2026 · 2 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about HARMONY

Is HARMONY RERA registered?

Yes. HARMONY is registered with UPRERA under registration number UPRERAPRJ9571, registered on 11 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for HARMONY?

The completion date filed with UPRERA is 28 Jun 2021. No completion certificate is on record yet.

Who is the builder of HARMONY?

PRECIOUS BUILDTECH PVT. LTD. is the promoter entity that filed HARMONY with UPRERA (promoter RERA ID UPRERAPRM10087). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does HARMONY show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted HARMONY more time to complete?

UPRERA's record carries 1 completion extension for HARMONY, the latest running to 28 Jun 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does HARMONY have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is HARMONY located?

HARMONY is registered in Bareilly, as filed with UPRERA.

What configurations are available in HARMONY?

The unit plan filed with UPRERA lists 3 BHK, OTHER and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in HARMONY?

The approved unit plan filed with UPRERA runs from 62 to 85 m² of carpet area (about 663 to 913 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in HARMONY?

The approved unit plan describes 9 blocks and 468 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is HARMONY?

About 114 units per acre: 468 planned units across 4.10 acres (16,586 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗