INDOSAM75

UPRERARegistered

INDOSAM75 is a RERA-registered residential project by Indosam Infra Private Limited in Gautam Budh Nagar (RERA ID UPRERAPRJ10087). Registered with a completion deadline of 31 Dec 2019.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ10087
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start14 Jan 2014
Original start14 Jan 2014
Project duration72 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressPlot No.61-B,3rd Floor Gali No 12 F block East Delhi Laxmi Nagar Delhi 110092
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. valid to

    Permit revalidated

    NOIDA/CAP/2013/III-275/684

  2. 2 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. to

    Extension granted

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. Completion certificate filed

  8. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered14 Aug 2017
Original completion31 Mar 2019
Revised completion31 Dec 2019
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary23 Oct 2019
Registration fee₹84,000
Sanctioning authorityNoida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors431 · 4 · 19 (units from plan)
  • 3 BHK254 59%
  • 2 BHK141 33%
  • 4 BHK36 8%
ConfigurationUnitsCarpet area
3 BHK25476-105
4 BHK36143
2 BHK14156-65
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
B · 3 BHK148387-105
C · 3 BHK, 4 BHK187299-143
D · 2 BHK, 3 BHK1819556-76
F · 3 BHK148176-86
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
SPACE DESIGNERS
License 6A/98/23185
B-34, SECTOR-67, NOIDA
Engineer
OPTIMUM DESIGN
B-24, SECTOR-67, NOIDA
Contractor
FASTECH PROJECTS PRIVATE LIMITED
SF-06,07,08,09, 2ND FLOOR CROSS REVER MALL KARKARDUMMA DELHI 110092
Sr.Development work declared to RERA
1Demarcation of Plots
Plot no.GH-05, Sector-75, Noida of area 15771.23 sq. mtrs.
2Boundary Wall
Boundary wall of approx. 1950 mm high along the periphery
3Road Work
Cement concrete roads
4Footpaths
interlock tiles
5Water Supply Including Drinking Water Facilities
Underground tank and respective overhead tank of each tower
6Sewer System
Underground sewer line
7Drain
Underground drains with catch pits
8Parks
2110 sq mtrs of parks/common greens to be provided
9Tree Planting
144 trees to be planted
10Design For Electric Supply Including Street Lighting
One compact sub-station of 11 KVA input and LT supply through main HT panel. Street light provided.
11Community Buildings
Club at Tower -F, Ground floor
12Treatment and Disposal System of Sewage and Sullage water
345 KLD STP. Treated water used for irrigation and surplus to be discharged in public drain.
13Solid Waste Management And Disposal System
Manual handling of solid waste and disposal
14Water Conservation System
Four rain water harvesting pits and recycling of treated waste water as far as possible
15Energy Management System Including Use of Renewable Energy
Energy management through compact sub-station
16Fire Protection And Fire Safety System
Hydrant system with pumps station shall be provided
17Social Infrastructure And Other Public Amenities Including Public Health Services
Retail Shopping complex, Reception lobby and Amphi theater
18Emergency Evacuation Services
Fire stairs provided in each building
19Other Miscellaneous Work
As and when required
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 24 Jul 2018. 1 of them carries a revalidation, valid to 24 Jul 2023.

Sanctioned by Noida Authority · 15,771 sqm of land · an approved plan of 4 blocks and 431 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
NOIDA/CAP/2013/III-275/68425 Jul 201324 Jul 201823 Jul 202331 Dec 2019—
NOIDA/CAP/2013/III-275/68425 Jul 201324 Jul 201824 Jul 202331 Dec 201925 Jul 2013
valid to 24 Jul 2023
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 31 Dec 2019.

#Granted fromExtended uptoNote
131 Mar 201931 Dec 2019—

Land & documents

23 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
2563998—
259742—
2894365—
2924704—
293948—
312392—
245622—
GH-0515771.23Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 23 Feb 2012.

Registry no.DateTypeArea
154023 Feb 2012self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 1540
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New6 Jul 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New6 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New6 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New6 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New6 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New6 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New6 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New6 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New6 Jul 2018 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old12 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Aug 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterUG TANK AND OVER HEAD TANK
Fire safety (as filed with RERA)SPRINKLERS SYSTEMS/WET HYDRANT
Health serviceSEWAGE TREATMENT PLANT

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameIndosam Infra Private Limited
RolePromoter · current
RERA IDUPRERAPRM4464
PANAACCI3774J
CIN / TANU70200DL2010PTC205369
Name of chairmanMr. Rajeev Goel S/o Sh. Krishan Chandra Goel
Registered addressPlot No.61-B,3rd Floor Gali No 12 F block East Delhi Laxmi Nagar Delhi 110092
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
INDOSAM INFRA PRIVATE LIMITEDBankDCB BANK LIMITEDBranchSECTOR-18, NOIDAA/C no.IFSCDCBL0000119
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.

Common questions about INDOSAM75

Is INDOSAM75 RERA registered?

Yes. INDOSAM75 is registered with UPRERA under registration number UPRERAPRJ10087, registered on 14 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has INDOSAM75 been completed?

UPRERA still lists INDOSAM75 as Registered, so it is not shown as completed here. A completion certificate dated 23 Oct 2019 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of INDOSAM75?

Indosam Infra Private Limited is the promoter entity that filed INDOSAM75 with UPRERA (promoter RERA ID UPRERAPRM4464). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted INDOSAM75 more time to complete?

UPRERA's record carries 1 completion extension for INDOSAM75, the latest running to 31 Dec 2019. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does INDOSAM75 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is INDOSAM75 located?

INDOSAM75 is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in INDOSAM75?

The unit plan filed with UPRERA lists 3 BHK, 4 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in INDOSAM75?

The approved unit plan filed with UPRERA runs from 56 to 143 m² of carpet area (about 599 to 1,544 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in INDOSAM75?

The approved unit plan describes 4 blocks and 431 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is INDOSAM75?

About 111 units per acre: 431 planned units across 3.90 acres (15,771 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗