Indrapratha Residency is a RERA-registered residential project by Indraprastha Residency in Lucknow (RERA ID UPRERAPRJ6317). Registered with a completion deadline of 31 Dec 2019.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ6317 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 1 Aug 2017 |
| Original start | 1 Aug 2017 |
| Project duration | 29 months |
| Address | Lucknow, Lucknow |
| Tehsil | Lucknow |
| Applicant type | Partnership Firm |
| Applicant address | FLAT NO 1 NEW MARKET HAZRATGANJ |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
- valid to
Permit revalidated
36756
Permit revalidated (2)
4 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 5 Aug 2017 |
| Original completion | 31 Dec 2018 |
| Revised completion | 31 Dec 2019 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 30 Oct 2021 |
| Registration fee | ₹21,500 |
| Sanctioning authority | Lucknow Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 2 BHK28 54%
- 3 BHK24 46%
| Configuration | Units | Carpet area |
|---|---|---|
| 2 BHK | 28 | 70 |
| 3 BHK | 24 | 80 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| 1 · OTHER, 2 BHK, 3 BHK | 11 | 52 | 70-80 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots The plot is demarcated by boundary |
| 2 | Boundary Wall 5Ft tall boundary wall |
| 3 | Road Work PCC for road is completed |
| 4 | Footpaths NA |
| 5 | Water Supply Including Drinking Water Facilities Own boring |
| 6 | Sewer System Connection with sewer |
| 7 | Drain Two drain already provided for - Sewer & Rain Water Harvesting |
| 8 | Parks One samll park in fron and bigger at the back |
| 9 | Tree Planting Trees to be planted in the green area |
| 10 | Design For Electric Supply Including Street Lighting On Boudary |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water NA |
| 13 | Solid Waste Management And Disposal System NA |
| 14 | Water Conservation System Rainwater harvesting |
| 15 | Energy Management System Including Use of Renewable Energy NA |
| 16 | Fire Protection And Fire Safety System Fire fightning system in place |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services NA |
| 19 | Other Miscellaneous Work NA |
Permits & extensions
4 permits
An approval and the date it runs to - not proof the work matching it was done.
4 sanctioning permits are on record with UPRERA, the latest valid to 25 Aug 2021. 3 of them carry a revalidation, the latest valid to 25 Aug 2021.
Sanctioned by Lucknow Development Authority · 3,214 sqm of land · an approved plan of 1 block and 52 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 36756 | 26 Aug 2016 | 11 Aug 2019 | 10 Aug 2023 | 31 Dec 2019 | — | |
| 36756 | 26 Aug 2016 | 11 Aug 2019 | 25 Aug 2021 | 31 Dec 2019 | 12 Aug 2014 valid to 25 Aug 2021 | |
| 43095 | 26 Aug 2016 | 25 Aug 2021 | 25 Aug 2024 | 31 Dec 2019 | 26 Aug 2016 | |
| 43095 | 26 Aug 2016 | 25 Aug 2021 | 25 Aug 2024 | 31 Dec 2019 | 26 Aug 2016 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 31 Dec 2019.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 Dec 2018 | 31 Dec 2019 | — |
Land & documents
17 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 563 & 564 | Aurangabad Jagir | — |
| 563 & 564 | 483.27 | Plot |
| 563 & 564 | 2776.77 | Plot |
2 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 27 Sept 2012.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| Zild No 17596Page 117-160 Reg No 15786 | 21 Jul 2014 | other | — |
| Reg No 17868 | 27 Sept 2012 | other | — |
| Registry document · 17868 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 15786 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 12 Sept 2019 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 12 Sept 2019 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 12 Sept 2019 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 12 Sept 2019 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 12 Sept 2019 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 12 Sept 2019 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 12 Sept 2019 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 22 Feb 2018 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | Yes |
| Fire safety (as filed with RERA) | Yes |
| Renewable energy | No |
| Other facilities | Gym, Garden,Community shop |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Indraprastha Residency |
| Role | Promoter · current |
| RERA ID | UPRERAPRM12746 |
| PAN | AAEFI8506M |
| Registered address | FLAT NO 1 NEW MARKET HAZRATGANJ |
| RERA contact | |
| Registered since | 2017 |
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | INDRAPRASTHA RESIDENCYBankINDIAN BANKBranchLUCKNOWA/C no.IFSCIDIB000H561 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
Common questions about Indrapratha Residency
Is Indrapratha Residency RERA registered?
Yes. Indrapratha Residency is registered with UPRERA under registration number UPRERAPRJ6317, registered on 5 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has Indrapratha Residency been completed?
UPRERA still lists Indrapratha Residency as Registered, so it is not shown as completed here. A completion certificate dated 30 Oct 2021 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Indrapratha Residency?
Indraprastha Residency is the promoter entity that filed Indrapratha Residency with UPRERA (promoter RERA ID UPRERAPRM12746). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Indrapratha Residency more time to complete?
UPRERA's record carries 1 completion extension for Indrapratha Residency, the latest running to 31 Dec 2019. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Indrapratha Residency have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Indrapratha Residency located?
Indrapratha Residency is registered in Lucknow, as filed with UPRERA.
What configurations are available in Indrapratha Residency?
The unit plan filed with UPRERA lists OTHER, 2 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in Indrapratha Residency?
The approved unit plan filed with UPRERA runs from 70 to 80 m² of carpet area (about 751 to 864 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in Indrapratha Residency?
The approved unit plan describes 1 block and 52 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Indrapratha Residency?
About 65 units per acre: 52 planned units across 0.79 acres (3,214 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗