Jaypee Greens Kassia II,III, SDZ, YEW is a RERA-registered residential project by Adani Infrastructure Integrated Solutions Limited (formerly known as Jaiprakash Associates Limited) in Gautam Budh Nagar (RERA ID UPRERAPRJ4751). RERA status: NCLT (since 3 Jun 2024).
RERA status as reported: NCLT.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ4751 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | NCLTNCLTThe tribunal that hears company insolvency cases. UP-RERA lists projects whose promoter is before it.Read the full entry in the glossary |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Yamuna Expressway Authority |
| Proposed start | 9 Feb 2011 |
| Original start | 9 Feb 2011 |
| Project duration | 125 months |
| Address | Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | Sector - 128, Noida - 201304, Uttar Pradesh (India) |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
NCLT order
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 29 Jul 2017 |
| Original completion | 31 Dec 2020 |
| Revised completion | 30 Jun 2021 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹3,52,500 |
| Sanctioning authority | Yamuna Expressway Authority |
| NCLT order date | 3 Jun 2024 |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 2 BHK588 57%
- 3 BHK364 35%
- 1 BHK84 8%
| Configuration | Units | Carpet area |
|---|---|---|
| 3 BHK | 364 | 114 |
| 2 BHK | 588 | 68-83 |
| 1 BHK | 84 | 47 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| KAS201 · 2 BHK, OTHER | 8 | 14 | 83 |
| KAS202 · 2 BHK, OTHER | 8 | 14 | 83 |
| KAS203 · 2 BHK, OTHER | 8 | 14 | 83 |
| KAS204 · 2 BHK, OTHER | 8 | 14 | 83 |
| KAS205 · 2 BHK, OTHER | 8 | 14 | 83 |
| KAS206 · 2 BHK, OTHER | 8 | 14 | 83 |
| KAS207 · 2 BHK, OTHER | 8 | 14 | 83 |
| KAS208 · 2 BHK, OTHER | 8 | 14 | 83 |
| KAS209 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS210 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS211 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS212 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS214 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS215 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS216 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS217 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS218 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS219 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS220 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS221 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS222 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS223 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS224 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS225 · 3 BHK, OTHER | 8 | 14 | 114 |
| KAS226 · 3 BHK, OTHER | 8 | 14 | 114 |
| KAS227 · 3 BHK, OTHER | 8 | 14 | 114 |
| KAS228 · 3 BHK, OTHER | 8 | 14 | 114 |
| KAS229 · 3 BHK, OTHER | 8 | 14 | 114 |
| KAS230 · 3 BHK, OTHER | 8 | 14 | 114 |
| KAS231 · 3 BHK, OTHER | 8 | 14 | 114 |
| KAS232 · 3 BHK, OTHER | 8 | 14 | 114 |
| KAS233 · 3 BHK, OTHER | 8 | 14 | 114 |
| KAS234 · 3 BHK, OTHER | 8 | 14 | 114 |
| KAS235 · 3 BHK, OTHER | 8 | 14 | 114 |
| KAS236 · 3 BHK, OTHER | 8 | 14 | 114 |
| KAS237 · 3 BHK, OTHER | 8 | 14 | 114 |
| KAS238 · 3 BHK, OTHER | 8 | 14 | 114 |
| KAS239 · 3 BHK, OTHER | 8 | 14 | 114 |
| KAS240 · 3 BHK, OTHER | 8 | 14 | 114 |
| KAS301 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS302 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS303 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS304 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS305 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS306 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS307 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS308 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS309 · 1 BHK, OTHER | 8 | 28 | 47 |
| KAS310 · 1 BHK, OTHER | 8 | 28 | 47 |
| KAS311 · 1 BHK, OTHER | 8 | 28 | 47 |
| KAS312 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS314 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS315 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS316 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS317 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS318 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS319 · 2 BHK, OTHER | 8 | 14 | 68 |
| KAS320 · 3 BHK, OTHER | 8 | 14 | 114 |
| KAS321 · 3 BHK, OTHER | 8 | 14 | 114 |
| KAS322 · 3 BHK, OTHER | 8 | 14 | 114 |
| KAS323 · 3 BHK, OTHER | 8 | 14 | 114 |
| KAS324 · 3 BHK, OTHER | 8 | 14 | 114 |
| KAS325 · 3 BHK, OTHER | 8 | 14 | 114 |
| KAS326 · 3 BHK, OTHER | 8 | 14 | 114 |
| KAS327 · 3 BHK, OTHER | 8 | 14 | 114 |
| KAS328 · 3 BHK, OTHER | 8 | 14 | 114 |
| KAS329 · 3 BHK, OTHER | 8 | 14 | 114 |
| KAS330 · 2 BHK, OTHER | 8 | 14 | 83 |
| KAS331 · 2 BHK, OTHER | 8 | 14 | 83 |
| KAS332 · 2 BHK, OTHER | 8 | 14 | 83 |
| KAS333 · 2 BHK, OTHER | 8 | 14 | 83 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots "As per location of Plot : NE - 24 M Wide Master Plan Road SE - 28 M Wide Master Plan Road SW -24 M Wide Master Plan Road NW -18 M Wide Master Plan Road The Plot has been demarcated" |
| 2 | Boundary Wall "This Project is part of Sports City Township. The over all boundary wall / fencing of the Township has been constructed except few Passages. Cluster boundary wall of the project has been planned and the same shall be constructed along with the completion of construction of all of the towers." |
| 3 | Road Work "The 30 M wide approach road to the project is completed. The internal roads connecting the towers have been planned as per submission drawings. The internal roads shall be constructed before completion of Project." |
| 4 | Footpaths The pedestrian footpaths with Kerb Stone as per Landscape Plan have been planned and the same shall be constructed before completion of Project |
| 5 | Water Supply Including Drinking Water Facilities "The pipe lines for water supply have been partially laid at Township Level. The drinking water is avaialable and is being supplied through water centre after necessary treatments as and when required. The tapping points for individual towers shall be made available and the same shall be connected before completion of Project. " |
| 6 | Sewer System The internal drain system is planned to be completed before completion of the project . The pipe lines for Sewer System have been planned at Township Level. The tapping points will be completed as and when required along with completion of project and occupancy of residents thereof. The facility for treating sewage is available at the Sewage Treatment Plant , presently operational in the township . |
| 7 | Drain "The drainage system has been laid at Township Level.The internal drain system is planned to be completed before completion of the project. The drainage water is being collected in seasonal ponds and lakes of Boulevard. The planned tapping points for the project shall be available and the same will be connected as and when required. " |
| 8 | Parks Parks / Play fields are planned at Township Level. The planned green areas within the cluster are planned to be completed before completion of project. |
| 9 | Tree Planting "Tree planting as per approved landscape plan at township level is complete. The tree planting at cluster level shall be done as and when required before completion of the Towers." |
| 10 | Design For Electric Supply Including Street Lighting "The electric supply from Grid Sub Station as planned for the Township is complete. The tapping points for the project are available and the same are being connected as and when required. " |
| 11 | Community Buildings Not Applicable |
| 12 | Treatment and Disposal System of Sewage and Sullage water The sewage will be treated at Sewage Treatment Plant. The sullage will be converted into compost. The sullage water after necessary treatment will be supplied for flushing, irrigation and landscaping. |
| 13 | Solid Waste Management And Disposal System The solid waste to be collected from door to door apartments after occupancy of resident will be transferred to segregation centres planned at Sewege Treatment Plant at Township level. The segregated waste shall be transported through facility management maintenance company to the identified sites of YEIDA Authority for necessary disposal. Solid waste management agency shall be deployed for collection of any solid waste generated during construction stage. |
| 14 | Water Conservation System Treated water from Sewage Treatment Plant shall be used for irrigation and road washing, flushing etc. |
| 15 | Energy Management System Including Use of Renewable Energy As per approved environment impact assessment authority advice. |
| 16 | Fire Protection And Fire Safety System The Fire Station with all the infrastructure facilities and staff is planned at Township level. Towers and basements are being provided with all the provisions of Fire Protection & Safety System as laid down in respective fire approval from the fire department. Fire tender is available at Township level. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services At township level, Higher Secondary School (Sardar Patel Vidyalaya), Temples, Cafeteria, Police Outpost, Dispensery facilities etc. have already been provided. World class Formula -1 is operational within the Township and round the year races , corporate events etc are being hosted and held in Buddh International Circuit. International standard Cricket Stadium with Outfield, spectator stands already made ready and corporate league and other cricket matches are being held at the Cricket Ground. |
| 18 | Emergency Evacuation Services Fire Escape Staircases are being provided in tower and basements as per Norms laid down in respective fire approval of the fire department. |
| 19 | Other Miscellaneous Work At Township Level Sewage Treatment Plant & Service Centres, Electric Grid Sub station with DG Power Backup, Fire tenders and mobile fire saftey equipments, Boulevard & Parks and Seasonal ponds have been provided. |
Permits & extensions
0 permits
An approval and the date it runs to - not proof the work matching it was done.
Sanctioned by Yamuna Expressway Authority · 69,406 sqm of land · an approved plan of 71 blocks and 1036 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 30 Jun 2021.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 Dec 2020 | 30 Jun 2021 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
14 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| GH-G1-B | 69406 | Plot |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 25 Sept 2009.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 11627 | 25 Sept 2009 | self | — |
| Registry document · 11627 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 5 Jun 2018 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 5 Jun 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 5 Jun 2018 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 6 Jun 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 5 Jun 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 5 Jun 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 5 Jun 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 7 Jun 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 5 Jun 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 9 Apr 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 9 Apr 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 9 Apr 2018 ↗ |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | Old | 19 Apr 2018 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | Available |
| Fire safety (as filed with RERA) | R-5/J.D./Lucknow-15(Guatam)/32 19/Jan/2015 |
| Other facilities | As per approved Layout Plan of Jaypee Greens Sports City, SDZ, Sector-25, YEIDA |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Adani Infrastructure Integrated Solutions Limited (formerly known as Jaiprakash Associates Limited) |
| Role | Promoter · current |
| RERA ID | UPRERAPRM6273 |
| PAN | AABCB1562A |
| CIN / TAN | L14106UP1995PLC019017 |
| Name of chairman | Sh. Manoj Gaur |
| Registered address | Sector - 128, Noida - 201304, Uttar Pradesh (India) |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | Jaiprakash Associates Limited - KASSIA IIBankICICI BankBranchExpress Trade Tower2A/C no.IFSCICIC0001579 |
What has changed on this record
20 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| RERA status | nclt → abeyance changed in Estanzo’s record | 21 Oct 2026 |
| RERA status | nclt → abeyance changed in Estanzo’s record | 19 Oct 2026 |
| RERA status | nclt → abeyance changed in Estanzo’s record | 18 Oct 2026 |
| RERA status | nclt → abeyance changed in Estanzo’s record | 15 Oct 2026 |
| RERA status | nclt → abeyance changed in Estanzo’s record | 13 Oct 2026 |
| RERA status | nclt → abeyance changed in Estanzo’s record | 11 Oct 2026 |
| RERA status | nclt → abeyance changed in Estanzo’s record | 9 Oct 2026 |
| RERA status | nclt → abeyance changed in Estanzo’s record | 7 Oct 2026 |
| RERA status | nclt → abeyance changed in Estanzo’s record | 5 Oct 2026 |
| RERA status | nclt → abeyance changed in Estanzo’s record | 3 Oct 2026 |
| RERA status | nclt → abeyance changed in Estanzo’s record | 1 Oct 2026 |
| RERA status | nclt → abeyance changed in Estanzo’s record | 29 Sept 2026 |
| RERA status | nclt → abeyance changed in Estanzo’s record | 27 Sept 2026 |
| RERA status | nclt → abeyance changed in Estanzo’s record | 25 Sept 2026 |
| RERA status | nclt → abeyance changed in Estanzo’s record | 23 Sept 2026 |
| RERA status | nclt → abeyance changed in Estanzo’s record | 21 Sept 2026 |
| RERA status | nclt → abeyance changed in Estanzo’s record | 19 Sept 2026 |
| RERA status | nclt → abeyance changed in Estanzo’s record | 17 Sept 2026 |
| RERA status | nclt → abeyance changed in Estanzo’s record | 15 Sept 2026 |
| RERA status | nclt → abeyance changed in Estanzo’s record | 13 Sept 2026 |
| RERA status | changed in Estanzo’s record · 21 Oct 2026 · 30 movements on record |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 16 Aug 2026 |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No sanctioning permit is published for this project.Ask which authority sanctioned the plans, for the permit number, and for the date it is valid to.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
Common questions about Jaypee Greens Kassia II,III, SDZ, YEW
Is Jaypee Greens Kassia II,III, SDZ, YEW RERA registered?
Yes. Jaypee Greens Kassia II,III, SDZ, YEW is registered with UPRERA under registration number UPRERAPRJ4751, registered on 29 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Jaypee Greens Kassia II,III, SDZ, YEW?
The completion date filed with UPRERA is 30 Jun 2021. No completion certificate is on record yet.
Who is the builder of Jaypee Greens Kassia II,III, SDZ, YEW?
Adani Infrastructure Integrated Solutions Limited (formerly known as Jaiprakash Associates Limited) is the promoter entity that filed Jaypee Greens Kassia II,III, SDZ, YEW with UPRERA (promoter RERA ID UPRERAPRM6273). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Jaypee Greens Kassia II,III, SDZ, YEW more time to complete?
UPRERA's record carries 1 completion extension for Jaypee Greens Kassia II,III, SDZ, YEW, the latest running to 30 Jun 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Jaypee Greens Kassia II,III, SDZ, YEW have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Jaypee Greens Kassia II,III, SDZ, YEW located?
Jaypee Greens Kassia II,III, SDZ, YEW is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in Jaypee Greens Kassia II,III, SDZ, YEW?
The unit plan filed with UPRERA lists 3 BHK, 2 BHK, 1 BHK and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in Jaypee Greens Kassia II,III, SDZ, YEW?
The approved unit plan filed with UPRERA runs from 47 to 114 m² of carpet area (about 501 to 1,222 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in Jaypee Greens Kassia II,III, SDZ, YEW?
The approved unit plan describes 71 blocks and 1,036 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Jaypee Greens Kassia II,III, SDZ, YEW?
About 60 units per acre: 1,036 planned units across 17.15 acres (69,406 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗