Jaypee Greens Kassia II,III, SDZ, YEW

UPRERANCLTRERA data as of 17 Aug 2026

Jaypee Greens Kassia II,III, SDZ, YEW is a RERA-registered residential project by Jaiprakash Associates Limited in Gautam Budh Nagar (RERA ID UPRERAPRJ4751). RERA status: NCLT (since 3 Jun 2024). Data as reported by UP-RERA. as reported by UPRERA

RERA status as reported: NCLT.
Project cost
not reported
Land area
69,406 17.15 acres
Units (from plan)
1,036
Density (derived)
60 /acre
Towers (from plan)
71
Config
1 BHK/2 BHK/3 BHK/OTHER
Carpet
47-114
Registered
29 Jul 2017

Basic details

Descriptive fields the promoter entered when registering. UP-RERA publishes them as filed and does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ4751
Project categoryResidential
Registration typeOngoing
RERA statusNCLTNCLTThe tribunal that hears company insolvency cases. UP-RERA lists projects whose promoter is before it.Read the full entry in the glossary
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryYamuna Expressway Authority
Proposed start9 Feb 2011
Original start9 Feb 2011
Project duration125
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Coordinates28.36777777777778, 77.53333333333333
Applicant typeCompany
Applicant addressSector - 128, Noida - 201304, Uttar Pradesh (India)
Applicant contact9650169966 · rera.jal@jalindia.co.in

Registration & timeline

Dates on the registration itself. They do not describe the state of construction - the quarterly reports are where that is filed.

RERA registered29 Jul 2017
Promised completion31 Dec 2020
Revised completion30 Jun 2021
Completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹3,52,500
Sanctioning authorityYamuna Expressway Authority
NCLT order date3 Jun 2024

Inventory

derived from unit plan

The approved unit plan, not an availability list: RERA publishes nothing about what is still unsold.

Total units · towers · floors1,036 · 71 · 8 (units from plan)
  • 2 BHK588 57%
  • 3 BHK364 35%
  • 1 BHK84 8%
ConfigurationUnitsCarpet area
3 BHK364114
2 BHK58868-83
1 BHK8447
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
KAS201 · 2 BHK, OTHER81483
KAS202 · 2 BHK, OTHER81483
KAS203 · 2 BHK, OTHER81483
KAS204 · 2 BHK, OTHER81483
KAS205 · 2 BHK, OTHER81483
KAS206 · 2 BHK, OTHER81483
KAS207 · 2 BHK, OTHER81483
KAS208 · 2 BHK, OTHER81483
KAS209 · 2 BHK, OTHER81468
KAS210 · 2 BHK, OTHER81468
KAS211 · 2 BHK, OTHER81468
KAS212 · 2 BHK, OTHER81468
KAS214 · 2 BHK, OTHER81468
KAS215 · 2 BHK, OTHER81468
KAS216 · 2 BHK, OTHER81468
KAS217 · 2 BHK, OTHER81468
KAS218 · 2 BHK, OTHER81468
KAS219 · 2 BHK, OTHER81468
KAS220 · 2 BHK, OTHER81468
KAS221 · 2 BHK, OTHER81468
KAS222 · 2 BHK, OTHER81468
KAS223 · 2 BHK, OTHER81468
KAS224 · 2 BHK, OTHER81468
KAS225 · 3 BHK, OTHER814114
KAS226 · 3 BHK, OTHER814114
KAS227 · 3 BHK, OTHER814114
KAS228 · 3 BHK, OTHER814114
KAS229 · 3 BHK, OTHER814114
KAS230 · 3 BHK, OTHER814114
KAS231 · 3 BHK, OTHER814114
KAS232 · 3 BHK, OTHER814114
KAS233 · 3 BHK, OTHER814114
KAS234 · 3 BHK, OTHER814114
KAS235 · 3 BHK, OTHER814114
KAS236 · 3 BHK, OTHER814114
KAS237 · 3 BHK, OTHER814114
KAS238 · 3 BHK, OTHER814114
KAS239 · 3 BHK, OTHER814114
KAS240 · 3 BHK, OTHER814114
KAS301 · 2 BHK, OTHER81468
KAS302 · 2 BHK, OTHER81468
KAS303 · 2 BHK, OTHER81468
KAS304 · 2 BHK, OTHER81468
KAS305 · 2 BHK, OTHER81468
KAS306 · 2 BHK, OTHER81468
KAS307 · 2 BHK, OTHER81468
KAS308 · 2 BHK, OTHER81468
KAS309 · 1 BHK, OTHER82847
KAS310 · 1 BHK, OTHER82847
KAS311 · 1 BHK, OTHER82847
KAS312 · 2 BHK, OTHER81468
KAS314 · 2 BHK, OTHER81468
KAS315 · 2 BHK, OTHER81468
KAS316 · 2 BHK, OTHER81468
KAS317 · 2 BHK, OTHER81468
KAS318 · 2 BHK, OTHER81468
KAS319 · 2 BHK, OTHER81468
KAS320 · 3 BHK, OTHER814114
KAS321 · 3 BHK, OTHER814114
KAS322 · 3 BHK, OTHER814114
KAS323 · 3 BHK, OTHER814114
KAS324 · 3 BHK, OTHER814114
KAS325 · 3 BHK, OTHER814114
KAS326 · 3 BHK, OTHER814114
KAS327 · 3 BHK, OTHER814114
KAS328 · 3 BHK, OTHER814114
KAS329 · 3 BHK, OTHER814114
KAS330 · 2 BHK, OTHER81483
KAS331 · 2 BHK, OTHER81483
KAS332 · 2 BHK, OTHER81483
KAS333 · 2 BHK, OTHER81483
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

The filing names who was engaged and what was promised. It carries no status against any individual work, so none is shown.

Architect
M/s Design Forum International
License "Mr. Anuj Tevatia CA No. 95/18739"
Design Forum International , K-47, Kailash Colony, New Delhi-110048
Engineer
"M/s NNC DESIGN INTERNATION"
NNC Design International, B-2,Jaswanth Chambers, Okhla, New Delhi -110025
Contractor
Jaiprakash Associates Limited
Site Office, Sector -128, Noida 201 304
Sr.Development work declared to RERA
1Demarcation of Plots
"As per location of Plot : NE - 24 M Wide Master Plan Road SE - 28 M Wide Master Plan Road SW -24 M Wide Master Plan Road NW -18 M Wide Master Plan Road The Plot has been demarcated"
2Boundary Wall
"This Project is part of Sports City Township. The over all boundary wall / fencing of the Township has been constructed except few Passages. Cluster boundary wall of the project has been planned and the same shall be constructed along with the completion of construction of all of the towers."
3Road Work
"The 30 M wide approach road to the project is completed. The internal roads connecting the towers have been planned as per submission drawings. The internal roads shall be constructed before completion of Project."
4Footpaths
The pedestrian footpaths with Kerb Stone as per Landscape Plan have been planned and the same shall be constructed before completion of Project
5Water Supply Including Drinking Water Facilities
"The pipe lines for water supply have been partially laid at Township Level. The drinking water is avaialable and is being supplied through water centre after necessary treatments as and when required. The tapping points for individual towers shall be made available and the same shall be connected before completion of Project. "
6Sewer System
The internal drain system is planned to be completed before completion of the project . The pipe lines for Sewer System have been planned at Township Level. The tapping points will be completed as and when required along with completion of project and occupancy of residents thereof. The facility for treating sewage is available at the Sewage Treatment Plant , presently operational in the township .
7Drain
"The drainage system has been laid at Township Level.The internal drain system is planned to be completed before completion of the project. The drainage water is being collected in seasonal ponds and lakes of Boulevard. The planned tapping points for the project shall be available and the same will be connected as and when required. "
8Parks
Parks / Play fields are planned at Township Level. The planned green areas within the cluster are planned to be completed before completion of project.
9Tree Planting
"Tree planting as per approved landscape plan at township level is complete. The tree planting at cluster level shall be done as and when required before completion of the Towers."
10Design For Electric Supply Including Street Lighting
"The electric supply from Grid Sub Station as planned for the Township is complete. The tapping points for the project are available and the same are being connected as and when required. "
11Community Buildings
Not Applicable
12Treatment and Disposal System of Sewage and Sullage water
The sewage will be treated at Sewage Treatment Plant. The sullage will be converted into compost. The sullage water after necessary treatment will be supplied for flushing, irrigation and landscaping.
13Solid Waste Management And Disposal System
The solid waste to be collected from door to door apartments after occupancy of resident will be transferred to segregation centres planned at Sewege Treatment Plant at Township level. The segregated waste shall be transported through facility management maintenance company to the identified sites of YEIDA Authority for necessary disposal. Solid waste management agency shall be deployed for collection of any solid waste generated during construction stage.
14Water Conservation System
Treated water from Sewage Treatment Plant shall be used for irrigation and road washing, flushing etc.
15Energy Management System Including Use of Renewable Energy
As per approved environment impact assessment authority advice.
16Fire Protection And Fire Safety System
The Fire Station with all the infrastructure facilities and staff is planned at Township level. Towers and basements are being provided with all the provisions of Fire Protection & Safety System as laid down in respective fire approval from the fire department. Fire tender is available at Township level.
17Social Infrastructure And Other Public Amenities Including Public Health Services
At township level, Higher Secondary School (Sardar Patel Vidyalaya), Temples, Cafeteria, Police Outpost, Dispensery facilities etc. have already been provided. World class Formula -1 is operational within the Township and round the year races , corporate events etc are being hosted and held in Buddh International Circuit. International standard Cricket Stadium with Outfield, spectator stands already made ready and corporate league and other cricket matches are being held at the Cricket Ground.
18Emergency Evacuation Services
Fire Escape Staircases are being provided in tower and basements as per Norms laid down in respective fire approval of the fire department.
19Other Miscellaneous Work
At Township Level Sewage Treatment Plant & Service Centres, Electric Grid Sub station with DG Power Backup, Fire tenders and mobile fire saftey equipments, Boulevard & Parks and Seasonal ponds have been provided.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

0 permits

A permit shows an approval and the date it runs to, not that work matching it has been done.

Sanctioned by Yamuna Expressway Authority · 69,406 sqm of land · an approved plan of 71 blocks and 1036 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 30 Jun 2021.

#Granted fromExtended uptoNote
131 Dec 202030 Jun 2021Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

14 filings

What the promoter placed on the record about how it holds the land. Not a title search - nothing here confirms the land is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
GH-G1-B69406Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 25 Sept 2009.

Registry no.DateTypeArea
1162725 Sept 2009self
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 11627
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New5 Jun 2018
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New5 Jun 2018
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New5 Jun 2018
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New6 Jun 2018
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New5 Jun 2018
Water supply plan
How the project proposed to supply water, as filed at registration.
New5 Jun 2018
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New5 Jun 2018
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New7 Jun 2018
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New5 Jun 2018
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
Old9 Apr 2018
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old9 Apr 2018
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old9 Apr 2018
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old19 Apr 2018

Facilities

as declared to RERA

What the promoter declared at registration, in most cases a reference number for a filing made elsewhere such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterAvailable
Fire safety (as filed with RERA)R-5/J.D./Lucknow-15(Guatam)/32 19/Jan/2015
Other facilitiesAs per approved Layout Plan of Jaypee Greens Sports City, SDZ, Sector-25, YEIDA

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Data as reported by UPRERA

Promoter (SPV) details

The legal entity carrying this project’s obligations under the Act. It may not be the brand the project is marketed under.

Legal nameJaiprakash Associates Limited
Roleprimary · current
RERA IDUPRERAPRM6273
PANAABCB1562A
CIN / TANL14106UP1995PLC019017
Name of chairmanSh. Manoj Gaur
Registered addressSector - 128, Noida - 201304, Uttar Pradesh (India)
RERA contactrera.jal@jalindia.co.in · 9650169966
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details - public record, shown as reported by UPRERA. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between the coordinates each project filed with RERA. Not a comparison, a ranking or a travel distance.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that any money is in these accounts, and account details change - verify against the official source before any payment.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Jaiprakash Associates Limited - KASSIA IIBankICICI BankBranchExpress Trade Tower2A/C no.157905001285IFSCICIC0001579
Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

A row is when Estanzo first observed a difference, not proof that RERA’s record changed on that date.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)1347 (Under Registration - 1 )1347 (Under Registration - 0 )
changed in Estanzo’s record
16 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 16 Aug 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

These are fields UP-RERA has not published for this project. The authority’s coverage is uneven and older registrations carry less of it, so an absence here is not evidence that anything is wrong - it is simply something this page cannot answer, and worth asking about.

  • No sanctioning permit is published for this project.Ask which authority sanctioned the plans, for the permit number, and for the date it is valid to.
  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.

Common questions about Jaypee Greens Kassia II,III, SDZ, YEW

Is Jaypee Greens Kassia II,III, SDZ, YEW RERA registered?

Yes. Jaypee Greens Kassia II,III, SDZ, YEW is registered with UPRERA under registration number UPRERAPRJ4751, registered on 29 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Jaypee Greens Kassia II,III, SDZ, YEW?

The completion date filed with UPRERA is 30 Jun 2021. No completion certificate is on record yet.

Who is the builder of Jaypee Greens Kassia II,III, SDZ, YEW?

Jaiprakash Associates Limited is the promoter entity that filed Jaypee Greens Kassia II,III, SDZ, YEW with UPRERA (promoter RERA ID UPRERAPRM6273). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Jaypee Greens Kassia II,III, SDZ, YEW more time to complete?

UPRERA's record carries 1 completion extension for Jaypee Greens Kassia II,III, SDZ, YEW, the latest running to 30 Jun 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Jaypee Greens Kassia II,III, SDZ, YEW have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Jaypee Greens Kassia II,III, SDZ, YEW located?

Jaypee Greens Kassia II,III, SDZ, YEW is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in Jaypee Greens Kassia II,III, SDZ, YEW?

The unit plan filed with UPRERA lists 3 BHK, 2 BHK, 1 BHK and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Jaypee Greens Kassia II,III, SDZ, YEW?

The approved unit plan filed with UPRERA runs from 47 to 114 m² of carpet area (about 501 to 1,222 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Jaypee Greens Kassia II,III, SDZ, YEW?

The approved unit plan describes 71 blocks and 1,036 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Jaypee Greens Kassia II,III, SDZ, YEW?

About 60 units per acre: 1,036 planned units across 17.15 acres (69,406 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 17 Aug 2026. official source ↗