JMD GREEN is a RERA-registered residential project by Jai Mega Developer Pvt Ltd in Village Brahamdaspur, Lucknow (RERA ID UPRERAPRJ539851). Registered with a completion deadline of 15 Jun 2026. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ539851 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Any Other Competent Authority |
| Proposed start | 8 Feb 2026 |
| Project duration | 5 months |
| Address | JMD GREEN, Khasra Number 462, Village Brahamdaspur, Tehsil Mohanlal Ganj, PIN 226032, Village Brahamdaspur, Mohanlalganj, Lucknow |
| Tehsil | Mohanlalganj |
| Applicant type | Company |
| Applicant address | Shop Number 266 Sahara Shopping Centre Faizabad Road Lucknow UP 226016 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
233/maanchitra/JIla Panchayat/2023-24
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 4 May 2026 |
| Original completion | 15 Jun 2026 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹67,500 |
| Sanctioning authority | Any Other Competent Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Outer Site boundary With precast boundary wall with 150x150x2700 mm high columns and panels of size 2100x300x50 mm, both of M30 Grade. Columns and Panels, both will be reinforced with 4 mm dia of high carbon HTPS wire. Precast concrete columns is to be embedded into Cement Concrete column. Plot will be with Brick work / Concrete pole)s |
| 2 | Boundary Wall Outer Side boundary with Precast boundary wall with MS 150x150x2700 mm high columns and panels of size 210x300x50 mm, both of M30 grade. Columns and Panels, both will be reinforced with 4 mm dia high carbon HTPS wire. Precast concrete columns is to be embedded in to cement concrete column. |
| 3 | Road Work 12 mtr Blacktop Road work with WBM and Bituminus Concrete road as per CPWD Specification. The Road shall be made after compacting the earth to the requisite density. |
| 4 | Footpaths Footpaths will be made of precast Concrete pavers of 100x200 and/or 200x200 mm and 50 mm thickness having M 3grade Concrete. |
| 5 | Water Supply Including Drinking Water Facilities As per approved drawings. One Tube-well with 5 HP Pump installation with underground tank of 30 (15 Raw +15 Treated )KL capacity and main water connection of 32 mm dia to each plot for Domestic use will be provided till the Water supply is made available by the Development Authority. |
| 6 | Sewer System External Sewer Line will be laid of 400 MM dia along with the Road from each Plot till the Soak pit as total number of Plots are jsut 8. |
| 7 | Drain External Storm Water Drain Line along side the Road will be laid of 300x300 MM, and will be connected to Rain Water Harvesting pit of 4.5 KL Capacity after initial filteration for suspended particles, as per approved Drawings and Calculations. |
| 8 | Parks One Park is Proposed in the Development and it will have Boundary wall along with Evergreen Trees as per approved Layout Plan. |
| 9 | Tree Planting Evergreen Trees as per approved Layout plan will be planted along with Seasonal flowering Plants. |
| 10 | Design For Electric Supply Including Street Lighting One Transformer of 100 KVA will be installed as per load requirement and as approved Layout along with Feder Pillars and Distribution Network. The same shall be as pr the attached Drawings. |
| 11 | Community Buildings Not Applicable |
| 12 | Treatment and Disposal System of Sewage and Sullage water Septic Tank of is designed and provided for 8 nos of Plots considering 15 person per plot in accordance with the Standard Sanitation norms. Septic Tank is of 40 KL capacity which has been calculated as per capita Sewage generation and required detention period. |
| 13 | Solid Waste Management And Disposal System Dry and Wet Garbage will be segregated at the Source by the Collector and will be disposed to the nearest Municipal Garbage Collection Point. |
| 14 | Water Conservation System One Rain Water Harvesting System is Proposed of 45 KL. |
| 15 | Energy Management System Including Use of Renewable Energy 16 Watt Solar Powered Street Light will be provided |
| 16 | Fire Protection And Fire Safety System Each Farm House will have to construct its own Water Tank as per the Fire Norms. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Not Applicable |
| 18 | Emergency Evacuation Services Not Applicable |
| 19 | Other Miscellaneous Work Not Applicable |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 15 Jun 2026.
Sanctioned by Any Other Competent Authority · 12,600 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 233/maanchitra/JIla Panchayat/2023-24 | 16 Jun 2023 | 15 Jun 2026 | 15 Jun 2028 | 15 Jun 2026 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
21 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 462 | 290 | Khasra |
| 462 | 290 | Khasra |
| 462 | 1150 | Khasra |
| 462 | 10870 | Khasra |
| Registry document · 1/3346/131-162/10054 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1/4156/209-226/14072 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1-3609/399-414/2031 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1/4171/1-28/14353 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 01 July 2020 to 30 June 2026 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 10 Mar 2026 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 21 Apr 2026 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 5 Mar 2026 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 10 Mar 2026 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 16 Jan 2026 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 16 Jan 2026 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 16 Jan 2026 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 16 Jan 2026 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 5 Mar 2026 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 11 Mar 2026 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 11 Mar 2026 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 10 Mar 2026 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 14 Feb 2026 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 11 Mar 2026 ↗ |
Quarterly progress reports
1 filed report
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
1 quarterly progress report is on file with UPRERA, for 2025-Q4.
| Quarter | Construction | Certificates |
|---|---|---|
| 2025-Q4 | 0% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Jai Mega Developer Pvt Ltd |
| Role | Promoter · current |
| RERA ID | UPRERAPRM396185 |
| PAN | CGFPS0073J |
| CIN / TAN | U70102UP2012PTC048568 |
| Name of chairman | Brijesh Kumar Singh |
| Registered address | Shop Number 266 Sahara Shopping Centre Faizabad Road Lucknow UP 226016 |
| RERA contact | |
| Registered since | 2025 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | JAI MEGA DEVELOPER PVT LTD COLLECTION ACCOUNT FOR JMD GREENBankICICI BANK LTDBranchMOHANLAL GANJBranch addressKHASRA 57, VILLAGE ATRAULI, TEHSIL MOHANLAL GANJ LUCKNOWBranch districtLucknow, Uttar PradeshA/C no.IFSCICIC0004918Branch emailSING.ASHOK@ICICBANK.COM |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | JAI MEGA DEVELOPER PVT LTD SEPARATE ACCOUNT FOR JMD GREENBankICICI BANK LIMITEDBranchATRAULI MOHANLA GANJBranch addressKHASRA NO 57, VILLAGE ATRAULI, RAEBARIELY ROAD, MOHANLAL GANJBranch districtLucknow, Uttar PradeshA/C no.IFSCICIC0004918 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | JAI MEGA DEVELOPER PVT LTD RERA TRANSACTION ACCOUNT FOR JMD GREENBankICICI BANK LIMITEDBranchATRAULI MOHANLAL GANJBranch addressKHASRA NO 57, VILLAGE ATRAULI, RAEBARIELY ROAD, MOHANLAL GANJBranch districtLucknow, Uttar PradeshA/C no.IFSCICIC0004918 |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Default-on-QPR flag | false → true changed in Estanzo’s record | 31 Aug 2026 |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about JMD GREEN
Is JMD GREEN RERA registered?
Yes. JMD GREEN is registered with UPRERA under registration number UPRERAPRJ539851, registered on 4 May 2026. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for JMD GREEN?
The completion date filed with UPRERA is 15 Jun 2026. No completion certificate is on record yet.
Who is the builder of JMD GREEN?
Jai Mega Developer Pvt Ltd is the promoter entity that filed JMD GREEN with UPRERA (promoter RERA ID UPRERAPRM396185). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Why does JMD GREEN show "default on QPR"?
UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.
Does JMD GREEN have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is JMD GREEN located?
JMD GREEN is registered in Village Brahamdaspur, Lucknow, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗