K.L. Heights is a RERA-registered residential project by NIRMAN in Lucknow (RERA ID UPRERAPRJ790597). RERA status: Completed on 31 Mar 2026.
RERA status as reported: Completed.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ790597 |
| Project category | Residential |
| Registration type | New |
| RERA status | Completed |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 1 Jul 2019 |
| Project duration | 42 months |
| Address | Bakshi Ka Talab**, Lucknow |
| Tehsil | Bakshi Ka Talab** |
| Applicant type | Partnership Firm |
| Applicant address | 33 HAVLOCK ROAD, LUCKNOW |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
40857
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 29 Jul 2020 |
| Original completion | 31 Dec 2022 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 31 Mar 2026 |
| Registration fee | ₹21,000 |
| Sanctioning authority | Lucknow Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 2 BHK26 50%
- 3 BHK26 50%
| Configuration | Units | Carpet area |
|---|---|---|
| 2 BHK | 26 | 70 |
| 3 BHK | 26 | 89 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| A · 2 BHK, 3 BHK | 7 | 52 | 70-89 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots SOUTH-18 M WIDE ROAD,WEST-9.0 M WIDE ROAD NORTH-KHASRA NO.-1195 & EAST LDA COLONY APPROACH ROAD |
| 2 | Boundary Wall 2.7 M all around. high and 230 mm thick Boundary wall along with RCC columns to strengthen it has been proposed to be constructed along with entry gate complex. |
| 3 | Road Work Complete CC internal road along with paver pathways is proposed to be constructed as per CPWD specifications for required load and width. Roads shall have some patterns using granite pavers at junctions and BLOCK entry points. |
| 4 | Footpaths Part of 6.0 M wide driveway all around the building block |
| 5 | Water Supply Including Drinking Water Facilities underground water to be supplied through terrace tank. |
| 6 | Sewer System Centralized Sewerage system as per design shall be Provided. All Sewerage disposal shall be go to the STP for treatment and treated ,recycled water shall be used for gardening and washing. overflow from the STP shall be connected to the Municipal sewerage system. |
| 7 | Drain Storm water system as per design shall be Provided. Storm water from terrace tops, Roads and other landscape area shall be connected to the Storm water drain channel and go to the Rain water harvesting Pits to recharge the Ground water and overflow shall be connected to Municipal drainage on main road. |
| 8 | Parks Beautifully landscaped area in front as per the required of LDA Norms. |
| 9 | Tree Planting "There are 4 type of trees proposed at site:
which are kachnar, gulmauhar, ashok, and neem." |
| 10 | Design For Electric Supply Including Street Lighting A well designed electricity distribution system, as per norms of electricity Board, will be in place along with centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting,STP,Pump room etc. 20% street lighting shall have solar panel. |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water Centralized Sewerage system shall be Provided. All Sewerage disposal shall be go to the STP for treatment and after treatment ,water shall be recycled and will used in gardening, & washing system . Overflow from the STP shall be connected with the Municipal sewerage system. |
| 13 | Solid Waste Management And Disposal System "Proper garbage disposal/collection point has been proposed. Nagar Nigam to collect garbage from this point.
for the solid waste management." |
| 14 | Water Conservation System A well designed rain water harvesting system has been planned along with 2 no. recharge pits for the whole building complex to conserve water. Rain water from internal roads, roof tops and gardens shall be directed towards recharge pits through drain channels and pipes. |
| 15 | Energy Management System Including Use of Renewable Energy We will use solar energy & LED light fittings for all the common areas |
| 16 | Fire Protection And Fire Safety System Fire NOC is obtained from the fire departments and all the works of fire fighting shall be done as per the NOC |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services N.A. |
| 18 | Emergency Evacuation Services Exits from each and every point has been planned and proposed as per norms in case of emergency. |
| 19 | Other Miscellaneous Work N.A. |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 16 Oct 2021.
Sanctioned by Lucknow Development Authority · 3,199 sqm of land · an approved plan of 1 block and 52 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 40857 | 17 Oct 2016 | 16 Oct 2021 | 16 Oct 2024 | 31 Dec 2022 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
14 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 1196 | 3198.96 | Khasra |
| Registry document · 2668 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3622 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Sale deed · 3911 The registered deed by which the promoter bought the land. | PDF ↗ |
| Khatauni extract · Reply against objection letter_ Kl Heights An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 14 Jun 2020 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 14 Jun 2020 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 14 Jun 2020 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 14 Jun 2020 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 14 Jun 2020 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 14 Jun 2020 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 14 Jun 2020 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 14 Jun 2020 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 14 Jun 2020 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 25 Jun 2020 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 17 Jun 2020 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 19 Jun 2020 ↗ |
Quarterly progress reports
11 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
11 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2022-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | NIRMAN |
| Role | Promoter · current |
| RERA ID | UPRERAPRM92866 |
| PAN | AAAFN8751B |
| CIN / TAN | LKNN00362F |
| Registered address | 33 HAVLOCK ROAD, LUCKNOW |
| RERA contact | |
| Registered since | 2019 |
| Legal name | PUKHYA CONSTRUCTIONS PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | 532/KHA/136, VIDYA PALACE, MEHNDI TOLA KURSI ROAD, LUCKNOW UTTAR PRADESH UP 000000 IN |
| RERA contact |
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | M/s Nirman KL Heights Project A/c RERABankBank of IndiaBranchAishbagh LucknowA/C no.IFSCBKID0006803 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about K.L. Heights
Is K.L. Heights RERA registered?
Yes. K.L. Heights is registered with UPRERA under registration number UPRERAPRJ790597, registered on 29 Jul 2020. Estanzo reproduces that filing; it does not verify the work behind it.
Has K.L. Heights been completed?
UPRERA lists K.L. Heights as completed, with a completion certificate dated 31 Mar 2026, against a filed deadline of 31 Dec 2022.
Who is the builder of K.L. Heights?
NIRMAN is the promoter entity that filed K.L. Heights with UPRERA (promoter RERA ID UPRERAPRM92866). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does K.L. Heights have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is K.L. Heights located?
K.L. Heights is registered in Lucknow, as filed with UPRERA.
What configurations are available in K.L. Heights?
The unit plan filed with UPRERA lists 2 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in K.L. Heights?
The approved unit plan filed with UPRERA runs from 70 to 89 m² of carpet area (about 756 to 958 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in K.L. Heights?
The approved unit plan describes 1 block and 52 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is K.L. Heights?
About 66 units per acre: 52 planned units across 0.79 acres (3,199 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗