KAANHA RESIDENCY

UPRERARegistered

KAANHA RESIDENCY is a RERA-registered residential project by ADITYA INFRAVENTURE PRIVATE LIMITED in Lucknow (RERA ID UPRERAPRJ11181). Registered with a completion deadline of 7 Nov 2019.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ11181
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAny Other Competent Authority
Proposed start31 Dec 2013
Original start11 May 2012
Project duration71 months
AddressLucknow, Lucknow
TehsilLucknow
Applicant typeCompany
Applicant addressSUPER MALL MAMA CHAURAHA VIKAS NAGAR LUCKNOW
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. 2 building permits sanctioned

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. valid to

    Permit revalidated

    ZILAPANCHYAT/NAKSHA NE/2011-2012

  4. Registered with RERA

  5. to

    Extension granted

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  8. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered14 Aug 2017
Original completion8 Nov 2018
Revised completion7 Nov 2019
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary8 Mar 2022
Registration fee₹18,000
Sanctioning authorityAny Other Competent Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors— · 2 · 1 (from plan)
ConfigurationUnitsCarpet area
3 BHK—1,271
2 BHK—858
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A · 3 BHK1—1,271
B · 2 BHK1—858
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.No unit total is shown: the plan's flat-count column contradicts this project's other filings.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
SUDHIR PANDEY
License M128732-4
3/305 VIVEK KHAND GOMTI NAGAR LUCKNOW
Engineer
SUDHIR PANDEY
3/305 VIVEK KHAND GOMTI NAGAR LUCKNOW
Contractor
NO
NO
Sr.Development work declared to RERA
1Demarcation of Plots
N.A
2Boundary Wall
AROUND THE TOWER
3Road Work
ROAD ALONG TOWER AND APPROACH FROM MAIN ROAD
4Footpaths
N.A
5Water Supply Including Drinking Water Facilities
SUPPLY FROM BORING AND STORAGE IN ROOF TANK
6Sewer System
LAYING OF SEWER PIPES AND CONNECTION TO STP PLANT NEAR TOWER
7Drain
EXTERNAL DRAIN FOR RAIN WATER TO BE CONSTRUCTED
8Parks
CHILDREN PLAY AREA AND PARK IN FRONT OF TOWER
9Tree Planting
TREE PLANTATION IN FRONT OF TOWER
10Design For Electric Supply Including Street Lighting
SINGLE POINT METERING AND ELECTRIC PANEL ON STILT/BASEMENT FLOOR. STREET LIGHTS ALONG PLOT BOUNDARY.
11Community Buildings
N.A
12Treatment and Disposal System of Sewage and Sullage water
N.A
13Solid Waste Management And Disposal System
N.A
14Water Conservation System
RAIN WATER HARVESTING NEAR PLOT BOUNDARY
15Energy Management System Including Use of Renewable Energy
N.A
16Fire Protection And Fire Safety System
Avliable
17Social Infrastructure And Other Public Amenities Including Public Health Services
N.A
18Emergency Evacuation Services
N.A
19Other Miscellaneous Work
Avliable
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 5 May 2017. 1 of them carries a revalidation, valid to 8 Nov 2018.

Sanctioned by Any Other Competent Authority · 2,593 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
878/ZILAPANCHYAT/NAKSHA NE/2011-201211 May 20125 May 20177 Nov 20198 Nov 2018—
878/ZILAPANCHYAT/NAKSHA NE/2011-201211 May 20125 May 20177 Nov 20198 Nov 20185 May 2017
valid to 8 Nov 2018
as ZILAPANCHYAT/NAKSHA NE/2011-2012
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 7 Nov 2019.

#Granted fromExtended uptoNote
18 Nov 20187 Nov 2019—

Land & documents

3 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
PART OF KHASRA NO 4162593.24—
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 3 Feb 2012.

Registry no.DateTypeArea
17123 Feb 2012self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 12028
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 12028
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 12028
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 12028
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old14 Aug 2017 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old14 Aug 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYES
Fire safety (as filed with RERA)yes
Health serviceNO
Renewable energyNO
Other facilitiesCLUB HOUSE

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameADITYA INFRAVENTURE PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM21565
PANAAKCA1608B
CIN / TANU45400UP2012PTC048362
Name of chairmanSANDEEP AGARWAL S/o MADAN LAL AGARWAL AKHIL BANSA
Registered addressSUPER MALL MAMA CHAURAHA VIKAS NAGAR LUCKNOW
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
ADITYA INFRAVENTURE PVT LTDBankBANK OF INDIABranchMAHANAGARA LUCKNOWA/C no.IFSCBKID0006804
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.

Common questions about KAANHA RESIDENCY

Is KAANHA RESIDENCY RERA registered?

Yes. KAANHA RESIDENCY is registered with UPRERA under registration number UPRERAPRJ11181, registered on 14 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has KAANHA RESIDENCY been completed?

UPRERA still lists KAANHA RESIDENCY as Registered, so it is not shown as completed here. A completion certificate dated 8 Mar 2022 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of KAANHA RESIDENCY?

ADITYA INFRAVENTURE PRIVATE LIMITED is the promoter entity that filed KAANHA RESIDENCY with UPRERA (promoter RERA ID UPRERAPRM21565). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted KAANHA RESIDENCY more time to complete?

UPRERA's record carries 1 completion extension for KAANHA RESIDENCY, the latest running to 7 Nov 2019. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does KAANHA RESIDENCY have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is KAANHA RESIDENCY located?

KAANHA RESIDENCY is registered in Lucknow, as filed with UPRERA.

What configurations are available in KAANHA RESIDENCY?

The unit plan filed with UPRERA lists 3 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in KAANHA RESIDENCY?

The approved unit plan filed with UPRERA runs from 858 to 1,271 m² of carpet area (about 9,238 to 13,686 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗