KANHA ENCLAVE is a RERA-registered residential project by SIYA RAM KASTURI DEVI EDUCATIONAL SOCIETY in Meerut (RERA ID UPRERAPRJ442744). Registered with a completion deadline of 27 Feb 2027.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ442744 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 12 Mar 2022 |
| Project duration | 60 months |
| Address | Meerut, Meerut |
| Tehsil | Meerut |
| Applicant type | Societies |
| Applicant address | DS-1, LOHIA NAGAR, HAPUR ROAD, MEERUT - 250003 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
389/CTCP-5/6317/263(I)
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion certificate filed
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 2 May 2022 |
| Original completion | 27 Feb 2027 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 15 Jul 2025 |
| Registration fee | ₹17,500 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots We will do physical demarcation of plots as per approved plan |
| 2 | Boundary Wall Boundary Wall already exists |
| 3 | Road Work From the main entrance gate, we will provide 80mm thick interlocking pavers road of 9mtr. width |
| 4 | Footpaths We would not provide any footpath |
| 5 | Water Supply Including Drinking Water Facilities We will provide Nagar Nigam Water Supply through underground pipelines |
| 6 | Sewer System We will provide underground sewer lines, which will be disposed into Nagar Nigam Sewer Line |
| 7 | Drain Storm Water drainage system shall be provided through open drains and storm water shall be transferred to recharge pits of rain water harvesting system |
| 8 | Parks Not Applicable |
| 9 | Tree Planting We wil plant trees in accordance to approved landscape plan |
| 10 | Design For Electric Supply Including Street Lighting We will provide Electrical Supply street lighting as per design and drawings being uploaded on Portal |
| 11 | Community Buildings Not Applicable |
| 12 | Treatment and Disposal System of Sewage and Sullage water Not Applicable |
| 13 | Solid Waste Management And Disposal System There shall be a proper garbage collection area provided for the solid waste disposal through Nagar Nigam |
| 14 | Water Conservation System We will provide Rain Water Harvesting System as per approved plan |
| 15 | Energy Management System Including Use of Renewable Energy We will use LED Street Lights to save energy |
| 16 | Fire Protection And Fire Safety System Not Applicable, since we are dealing in plots only, however, when the occupant goes for approval of map he shall have to make provision for fire protection and safety arrangements |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Not Applicable |
| 18 | Emergency Evacuation Services Not Applicable |
| 19 | Other Miscellaneous Work Not Applicable |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 27 Feb 2027.
Sanctioned by U.P. Awas Evam Vikas Parishad · 2,433 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 389/CTCP-5/6317/263(I) | 28 Feb 2022 | 27 Feb 2027 | 26 Feb 2030 | 27 Feb 2027 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
Land & documents
17 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 6317 | 2433 | Khasra |
| Sale deed · 10559 The registered deed by which the promoter bought the land. | PDF ↗ |
| Khatauni extract · 1423-1428 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 11 Apr 2022 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 16 Mar 2022 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 16 Mar 2022 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 16 Mar 2022 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 16 Mar 2022 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 16 Mar 2022 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 11 Apr 2022 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 16 Mar 2022 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 16 Mar 2022 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 16 Mar 2022 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 16 Mar 2022 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 16 Mar 2022 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 11 Apr 2022 ↗ |
Quarterly progress reports
19 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
19 quarterly progress reports are on file with UPRERA, covering 2021-Q4 to 2026-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | SIYA RAM KASTURI DEVI EDUCATIONAL SOCIETY |
| Role | Promoter · current |
| RERA ID | UPRERAPRM160775 |
| PAN | AAATS4977L |
| CIN / TAN | MRTM00769G |
| Registered address | DS-1, LOHIA NAGAR, HAPUR ROAD, MEERUT - 250003 |
| RERA contact | |
| Registered since | 2022 |
Nearby projects
Meerut
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | SIYARAM KASTURI DEVI EDUCATIONAL SOCIETY - COLLECTION ACCOUNT FOR KANHA ENCLAVEBankINDIAN BANKBranchTEJGARHI, MEERUTBranch addressE-17, SHASTRI NAGAR, TEJGARHI, MEERUT CITYBranch districtMeerut, Uttar PradeshA/C no.IFSCIDIB000T533 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | SIYARAM KASTURI DEVI EDUCATIONAL SOCIETY - SEPARATE ACCOUNT FOR KANHA ENCLAVEBankINDIAN BANKBranchTEJGARHI, MEERUTBranch addressE-17, SHASTRI NAGAR, TEJGARHI, MEERUT CITYBranch districtMeerut, Uttar PradeshA/C no.IFSCIDIB000T533 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | SIYARAM KASTURI DEVI EDUCATIONAL SOCIETY - TRANSACTION ACCOUNT FOR KANHA ENCLAVEBankINDIAN BANKBranchTEJGARHI, MEERUTBranch addressE-17, SHASTRI NAGAR, TEJGARHI, MEERUT CITYBranch districtMeerut, Uttar PradeshA/C no.IFSCIDIB000T533 |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Quarterly progress report 2026-Q2 | QPR 2026-Q2 newly filed with RERA | 19 Oct 2026 |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about KANHA ENCLAVE
Is KANHA ENCLAVE RERA registered?
Yes. KANHA ENCLAVE is registered with UPRERA under registration number UPRERAPRJ442744, registered on 2 May 2022. Estanzo reproduces that filing; it does not verify the work behind it.
Has KANHA ENCLAVE been completed?
UPRERA still lists KANHA ENCLAVE as Registered, so it is not shown as completed here. A completion certificate dated 15 Jul 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of KANHA ENCLAVE?
SIYA RAM KASTURI DEVI EDUCATIONAL SOCIETY is the promoter entity that filed KANHA ENCLAVE with UPRERA (promoter RERA ID UPRERAPRM160775). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does KANHA ENCLAVE have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is KANHA ENCLAVE located?
KANHA ENCLAVE is registered in Meerut, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗