KGR WALGREEN APARTMENT is a RERA-registered residential project by KGR GREENS INFRATECH PVT LTD in Varanasi (RERA ID UPRERAPRJ14696). Registered with a completion deadline of 22 May 2023. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ14696 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Varanasi Development Authority |
| Proposed start | 23 Dec 2017 |
| Project duration | 65 months |
| Address | Varanasi, Varanasi |
| Tehsil | Varanasi |
| Applicant type | Company |
| Applicant address | D 65/461, Lahartara Crossing, Lahartara, Varanasi-221103 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
309
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Permit revalidated
309
Building permit sanctioned
309
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 25 Dec 2017 |
| Original completion | 23 Nov 2022 |
| Revised completion | 22 May 2023 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹27,500 |
| Sanctioning authority | Varanasi Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 2 BHK72 59%
- 3 BHK47 39%
- SHOP3 2%
| Configuration | Units | Carpet area |
|---|---|---|
| 3 BHK | 47 | 86-93 |
| 2 BHK | 72 | 72-81 |
| SHOP | 3 | 15 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| BLOCK NO.1 · 3 BHK, 2 BHK, OTHER, SHOP | 14 | 122 | 15-93 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots YES |
| 2 | Boundary Wall YES |
| 3 | Road Work YES |
| 4 | Footpaths NO |
| 5 | Water Supply Including Drinking Water Facilities YES |
| 6 | Sewer System YES |
| 7 | Drain YES |
| 8 | Parks YES |
| 9 | Tree Planting YES |
| 10 | Design For Electric Supply Including Street Lighting YES |
| 11 | Community Buildings YES |
| 12 | Treatment and Disposal System of Sewage and Sullage water NO |
| 13 | Solid Waste Management And Disposal System YES |
| 14 | Water Conservation System YES |
| 15 | Energy Management System Including Use of Renewable Energy NO |
| 16 | Fire Protection And Fire Safety System YES |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services YES |
| 18 | Emergency Evacuation Services YES |
| 19 | Other Miscellaneous Work YES |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 22 May 2023. 1 of them carries a revalidation.
Sanctioned by Varanasi Development Authority · 4,424 sqm of land · an approved plan of 1 block and 122 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 309 | 23 Dec 2017 | 23 Dec 2022 | 23 Dec 2025 | 23 Nov 2022 | — | |
| 309 | 22 May 2023 | 22 May 2023 | 30 Jan 2031 | 22 May 2023 | 22 May 2023 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 22 May 2023.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 23 Nov 2022 | 22 May 2023 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
17 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 33,34,36,38,37/2 & Mi.33/1, Mi.34, Mi.36, Mi.38. | 4423.80 | — |
| 33,34,36,38,37/2 & Mi.33/1, Mi.34, Mi.36, Mi.38. | 4423.80 | Khasra |
2 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 31 Jul 2015.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 5824 | 31 Jul 2015 | other | — |
| 7644 | 26 Oct 2015 | other | — |
| Khatauni extract · 1422-1427 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Dec 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Dec 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | Provided Underground Water through Borewell Provided |
| Fire safety (as filed with RERA) | As per VDA & Fire Dept. Norms |
| Health service | Provided Jim and Garden facility |
| Other facilities | Yes |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
2 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
2 quarterly progress reports are on file with UPRERA, covering 2021-Q3 to 2021-Q4.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q3 | — | CA ↗ · Arch ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | KGR GREENS INFRATECH PVT LTD |
| Role | Promoter · current |
| RERA ID | UPRERAPRM20085 |
| PAN | AAFCR3981F |
| CIN / TAN | U70102UP2011PTR044462 |
| Name of chairman | Kanhaiya Singh |
| Registered address | D 65/461, Lahartara Crossing, Lahartara, Varanasi-221103 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Varanasi
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | KGR Greens Infratech Pvt. Ltd.BankState Bank of IndiaBranchkachahari, Main BranchA/C no.IFSCSBIN0000201 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.Common questions about KGR WALGREEN APARTMENT
Is KGR WALGREEN APARTMENT RERA registered?
Yes. KGR WALGREEN APARTMENT is registered with UPRERA under registration number UPRERAPRJ14696, registered on 25 Dec 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for KGR WALGREEN APARTMENT?
The completion date filed with UPRERA is 22 May 2023. No completion certificate is on record yet.
Who is the builder of KGR WALGREEN APARTMENT?
KGR GREENS INFRATECH PVT LTD is the promoter entity that filed KGR WALGREEN APARTMENT with UPRERA (promoter RERA ID UPRERAPRM20085). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Why does KGR WALGREEN APARTMENT show "default on QPR"?
UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.
Has UPRERA granted KGR WALGREEN APARTMENT more time to complete?
UPRERA's record carries 1 completion extension for KGR WALGREEN APARTMENT, the latest running to 22 May 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does KGR WALGREEN APARTMENT have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is KGR WALGREEN APARTMENT located?
KGR WALGREEN APARTMENT is registered in Varanasi, as filed with UPRERA.
What configurations are available in KGR WALGREEN APARTMENT?
The unit plan filed with UPRERA lists 3 BHK, 2 BHK, OTHER and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in KGR WALGREEN APARTMENT?
The approved unit plan filed with UPRERA runs from 15 to 93 m² of carpet area (about 161 to 1,002 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in KGR WALGREEN APARTMENT?
The approved unit plan describes 1 block and 122 units of which 119 are homes and 3 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is KGR WALGREEN APARTMENT?
About 112 units per acre: 122 planned units across 1.09 acres (4,424 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗