KRISHNABHUMI-VILLAS is a RERA-registered residential project by SNOWWHITE INFRASTRUCTURE PRIVATE LIMITED in Mathura (RERA ID UPRERAPRJ6039). Registered with a completion deadline of 19 Oct 2022.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ6039 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Mathura-Vrindavan Development Authority |
| Proposed start | 3 Nov 2015 |
| Original start | 3 Nov 2015 |
| Project duration | 84 months |
| Address | Mathura, Mathura |
| Tehsil | Mathura |
| Applicant type | Company |
| Applicant address | Infinity, Plot A-2, Block GP, Sector-5, Salt Lake Electronics Complex, Kolkata-700091 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
- valid to
Permit revalidated
12/V-14-15
3 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- valid to
Permit revalidated
12/V/14-15
- to
Extension granted
- to
Extension granted
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 31 Jul 2017 |
| Original completion | 2 Nov 2020 |
| Revised completion | 19 Oct 2022 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 23 May 2023 |
| Registration fee | ₹2,17,000 |
| Sanctioning authority | Mathura-Vrindavan Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots YES, AS PER KHASRA PLAN |
| 2 | Boundary Wall YES, AS PER APPROVED LAYOUT |
| 3 | Road Work YES, AS PER APPROVED LAYOUT, CONCRETE/PAVER/BITUMINOUS ROAD |
| 4 | Footpaths YES, CEMENT CONCRETE/INTERLOCKING/ GRASS PAVER |
| 5 | Water Supply Including Drinking Water Facilities YES, AS PER APPROVED LAYOUT |
| 6 | Sewer System YES, AS PER APPROVED LAYOUT |
| 7 | Drain YES, AS PER APPROVED LAYOUT |
| 8 | Parks YES, AS PER APPROVED LAYOUT |
| 9 | Tree Planting YES, ALL ALONG THE VILLAS |
| 10 | Design For Electric Supply Including Street Lighting YES, AS PER APPROVED LAYOUT |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water YES, AS PER APPROVED LAYOUT |
| 13 | Solid Waste Management And Disposal System NA |
| 14 | Water Conservation System YES, RAIN WATER HARVESTING. |
| 15 | Energy Management System Including Use of Renewable Energy NA |
| 16 | Fire Protection And Fire Safety System YES, AS PER APPROVED LAYOUT |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services YES, AS PER APPROVED LAYOUT |
| 18 | Emergency Evacuation Services YES |
| 19 | Other Miscellaneous Work NA |
Registered agents
1 agent
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | SPN PROPMART LLP | UPRERAAGT10604 |
Permits & extensions
3 permits
An approval and the date it runs to - not proof the work matching it was done.
3 sanctioning permits are on record with UPRERA, the latest valid to 2 Nov 2020. 2 of them carry a revalidation, the latest valid to 2 Nov 2023.
Sanctioned by Mathura-Vrindavan Development Authority · 42,347 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 12/V-14-15 | 3 Nov 2015 | 2 Nov 2020 | 2 Nov 2021 | 19 Oct 2022 | — | |
| 12/V-14-15 | 3 Nov 2015 | 2 Nov 2020 | 2 Nov 2023 | 19 Oct 2022 | 3 Nov 2020 valid to 2 Nov 2023 as 12/V/14-15 | |
| 12/V-14-15 | 3 Nov 2015 | 2 Nov 2020 | 2 Nov 2023 | 19 Oct 2022 | 3 Nov 2015 valid to 2 Nov 2023 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
UPRERA’s record carries 3 completion extensions for this project, the latest running to 19 Oct 2022.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 2 Nov 2020 | 1 May 2021 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 2 | 1 May 2021 | 30 Apr 2022 | — |
| 3 | 30 Apr 2022 | 19 Oct 2022 | — |
Land & documents
69 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 602 | .0062 | — |
| 603 | .0043 | — |
| 605 | .1092 | — |
| 607 | .0072 | — |
| 611 | .4039 | — |
| 613 | .0032 | — |
| 605 | .7915 | — |
| 595 | .0448 | — |
| 601 | .1389 | — |
| 594 | 1.2029 | — |
| 593 | .4477 | — |
| 592 | .0196 | — |
| 591 | .0241 | — |
| 466 | .5058 | — |
| 467 | .3476 | — |
| 457 | .1699 | — |
| 462 | .0100 | — |
| 600 | .0011 | — |
| 602 | 62 | Khasra |
| 603 | 43 | Khasra |
| 605 | 1092 | Khasra |
| 607 | 72 | Khasra |
| 613 | 32 | Khasra |
| 606(P) | 7915 | Khasra |
| 611(P) | 4039 | Khasra |
| 595 | 448 | Khasra |
| 601 | 1389 | Khasra |
| 594 | 12029 | Khasra |
| 593 | 4477 | Khasra |
| 592 | 196 | Khasra |
| 591 | 241 | Khasra |
| 466 | 5058 | Khasra |
| 467 | 3476 | Khasra |
| 457 | 1699 | Khasra |
| 462 | 100 | Khasra |
| 600 | 11 | Khasra |
8 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 19 Aug 2010.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 1884/12 | 13 Feb 2012 | self | — |
| 16/2011-12 | 18 May 2012 | self | — |
| 1882/12 | 13 Feb 2012 | self | — |
| 8416/10 | 19 Aug 2010 | self | — |
| 1880/12 | 13 Feb 2012 | self | — |
| 18212/2014 | 22 Dec 2014 | self | — |
| 18214/2014 | 22 Dec 2014 | self | — |
| 1884/12 | 13 Feb 2012 | self | — |
| Khatauni extract · 1416-1421, 1422-1427 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 29 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 29 Jul 2018 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 29 Jul 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 29 Jul 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 29 Jul 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 29 Jul 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 29 Jul 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 29 Jul 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 5 Jul 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 5 Jul 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 5 Jul 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 30 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 30 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 30 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 30 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 30 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 30 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 30 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 30 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 30 Jul 2017 ↗ |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | Old | 30 Jul 2017 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | Old | 30 Jul 2017 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | Old | 30 Jul 2017 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | Old | 30 Jul 2017 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | Old | 30 Jul 2017 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | Old | 30 Jul 2017 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | Old | 30 Jul 2017 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | Old | 30 Jul 2017 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 30 Jul 2017 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 30 Jul 2017 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 30 Jul 2017 ↗ |
Quarterly progress reports
14 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
14 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | SNOWWHITE INFRASTRUCTURE PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM2112 |
| PAN | AADCK0343C |
| CIN / TAN | U45400UP2010PTC042100 |
| Name of chairman | AJAY KUMAR JALAN |
| Registered address | Infinity, Plot A-2, Block GP, Sector-5, Salt Lake Electronics Complex, Kolkata-700091 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Mathura
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | M/S SNOWWHITE INFRASTRUCTURE PVT LTD RERA COLLECTION A/C KRISHNABHUMI-VILLASBankICICI BANKBranchVRINDAVAN BRANCH, MATHURABranch addressGROUND FLOOR, DEV COMPLEX, RAMAN RETI ROAD, MATHURABranch districtMathura, Uttar PradeshA/C no.IFSCICIC0001017 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | M/S SNOWWHITE INFRASTRUCTURE PVT LTD RERA SEPARATE A/C KRISHNABHUMI-VILLASBankICICI BANKBranchVRINDAVAN BRANCH, MATHURABranch addressGROUND FLOOR, DEV COMPLEX, RAMAN RETI ROAD, MATHURABranch districtMathura, Uttar PradeshA/C no.IFSCICIC0001017 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | M/S SNOWWHITE INFRASTRUCTURE PVT LTD RERA TRANSACTION A/C KRISHNABHUMI-VILLASBankICICI BANKBranchVRINDAVAN BRANCH, MATHURABranch addressGROUND FLOOR, DEV COMPLEX, RAMAN RETI ROAD, MATHURABranch districtMathura, Uttar PradeshA/C no.IFSCICIC0001017 |
What has changed on this record
5 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Permit paperwork 3 · Project Specifications | Project Specifications newly filed with RERA | 31 Aug 2026 |
| Permit paperwork 3 · Approved Map | Approved Map newly filed with RERA | 31 Aug 2026 |
| Permit paperwork 3 · Sanctioned Letter | Sanctioned Letter newly filed with RERA | 31 Aug 2026 |
| Permit paperwork 3 · Approved Layout | Approved Layout newly filed with RERA | 31 Aug 2026 |
| Sanctioning permit no. 3 | 12/V-14-15 newly filed with RERA | 31 Aug 2026 |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about KRISHNABHUMI-VILLAS
Is KRISHNABHUMI-VILLAS RERA registered?
Yes. KRISHNABHUMI-VILLAS is registered with UPRERA under registration number UPRERAPRJ6039, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has KRISHNABHUMI-VILLAS been completed?
UPRERA still lists KRISHNABHUMI-VILLAS as Registered, so it is not shown as completed here. A completion certificate dated 23 May 2023 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of KRISHNABHUMI-VILLAS?
SNOWWHITE INFRASTRUCTURE PRIVATE LIMITED is the promoter entity that filed KRISHNABHUMI-VILLAS with UPRERA (promoter RERA ID UPRERAPRM2112). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted KRISHNABHUMI-VILLAS more time to complete?
UPRERA's record carries 3 completion extensions for KRISHNABHUMI-VILLAS, the latest running to 19 Oct 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does KRISHNABHUMI-VILLAS have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is KRISHNABHUMI-VILLAS located?
KRISHNABHUMI-VILLAS is registered in Mathura, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗