KVD WINDPARK

UPRERANCLT

KVD WINDPARK is a RERA-registered residential project by KV Developers Private Limited in Gautam Budh Nagar (RERA ID UPRERAPRJ3122). RERA status: NCLT (since 28 Oct 2020).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: NCLT.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q4'24
—Q1'25
—Q2'25
43.66%Q3'25
61.79%Q4'25
55.15%Q1'26
67.97%Q2'26
—Q3'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ3122
Project categoryResidential
Registration typeOngoing
RERA statusNCLTNCLTThe tribunal that hears company insolvency cases. UP-RERA lists projects whose promoter is before it.Read the full entry in the glossary
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start22 Nov 2014
Original start8 Nov 2013
Project duration172 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressA-19, Ground Floor, Noida-201301
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. 2 building permits sanctioned

  3. Registered with RERA

  4. NCLT order

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. to

    Extension granted

  8. valid to

    Permit revalidated

    BP3276/1129

  9. Building permit sanctioned

    BP3276/1129

  10. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as NCLT. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered28 Jul 2017
Original completion7 Oct 2021
Revised completion10 Mar 2029
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,05,000
Sanctioning authorityGreater Noida Authority
NCLT order date28 Oct 2020

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors825 · 8 · 27 (units from plan)
Homes · commercial units787 · 38 (shops and offices filed in the same plan)
  • 2 BHK384 47%
  • 3 BHK355 43%
  • 4 BHK48 6%
  • SHOP38 5%
ConfigurationUnitsCarpet area
3 BHK35565-104
4 BHK48144
2 BHK38452-52
SHOP3810-16
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
COMMERCIAL · SHOP23810-16
TOWER 4 · 4 BHK, 3 BHK257194-144
TOWER 5 · 4 BHK, 3 BHK257294-144
TOWER 1 · 3 BHK228665-81
TOWER 2 · 3 BHK228666-83
TOWER 3 · 3 BHK228866-83
TOWER 6 · 2 BHK2419252-52
TOWER 7 · 2 BHK2419252-52
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
RT & Associates Pvt. Ltd.
License CA/97/22027
A 47-48, Sector 67, Noida-201301
Engineer
Dr.P.C.Ragtah
19/5, Old Rajinder Nagar, New Delhi-110060
Contractor
Purvee Construction
201, Tower 11, NRI City, Noida-201301
Sr.Development work declared to RERA
1Demarcation of Plots
Plot allotted by greater noida authority and of size 19986 sq. mtrs., plot no. DVGH09B Sector -Tech Zone -IV, Greater Noida. plot boundries as per given by greater noida authority.
2Boundary Wall
brickwork boundary wall all around the periphery
3Road Work
RCC roads will be provided.
4Footpaths
Interlock pavers to be used.
5Water Supply Including Drinking Water Facilities
Raw water will be received in under ground tank, then processed in water treatment plant and treated water stored in tanks.
6Sewer System
Under ground system. Feeder pipeline of UPCC and final discharge through RCC pipes.
7Drain
Storm water will go to harvesting recharge pits. Excess water if any, will be discharge to authority drain.
8Parks
Parks of 2997 sq. mtrs. total area shall be provided as per approved plan.
9Tree Planting
160 Nos of tree planting will be done.
10Design For Electric Supply Including Street Lighting
HT line shall be taken from NPCL, converted to LT supply with in house transformers and switching system. Street lights shall be LED based.
11Community Buildings
Club house with community hall will be provided.
12Treatment and Disposal System of Sewage and Sullage water
Raw sewerage will be processed through STP of six hundred capacity. Treated water shall be used for flushing, irrigation and cleaning purpose as much as feasiable. Excess treated water shall be discharge in the authority drain.
13Solid Waste Management And Disposal System
Kitchen waste collection will be collected through processed in a plant to make maunnal. Other waste shall be manually handle for dispossal.
14Water Conservation System
Harvesting recharge pits shall be used. Treated water shall be used for flushing, irrigation and cleaning purpose as much as fessiable
15Energy Management System Including Use of Renewable Energy
Top three floors will be provided for Solor heating water for kitchen.
16Fire Protection And Fire Safety System
Fire hydrant shall be provided. Fire alarm system, sprinkler, smoke dedtector and fire extinguisher shall be provied as required.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Retail shops are be provied as part of commercial area to be sold separately by developers. Swimming pool shall be provided as part of the club.
18Emergency Evacuation Services
Fire tender route and refused areas shall be provided. Emergency stairs shall be provided as approved by fire department.
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

4 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2AADHAR PROPMART PRIVATE LIMITEDUPRERAAGT10142
3Aakriti MittalUPRERAAGT14548
4Manish ChhabraUPRERAAGT19681
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

3 permits

An approval and the date it runs to - not proof the work matching it was done.

3 sanctioning permits are on record with UPRERA, the latest valid to 10 Mar 2029. 1 of them carries a revalidation, valid to 27 May 2030.

Sanctioned by Greater Noida Authority · 19,986 sqm of land · an approved plan of 8 blocks and 825 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
3236/FTS-75287 Oct 20166 Oct 20215 Oct 20267 Oct 2021—
3236/FTS-75287 Oct 20166 Oct 20216 Apr 20226 Apr 2022—
BP3276/112911 Mar 202410 Mar 202910 Mar 202910 Mar 202911 Mar 2024
valid to 27 May 2030
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 10 Mar 2029.

#Granted fromExtended uptoNote
17 Oct 20216 Apr 2022Six months extension in view of force majeure caused by covid-19 pandemic
26 Apr 202210 Mar 2029—

Land & documents

15 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
GH-0919986—
DVGH09BTECH ZONE IV19986Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

3 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 7 Jun 2013.

Registry no.DateTypeArea
139237 Jun 2013self—
139237 Jun 2013self—
139237 Jun 2013self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 13923
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · 13923
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New6 Jul 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New6 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New6 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New6 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New6 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New6 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New6 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New6 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New6 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New6 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New6 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New6 Jul 2018 ↗

Quarterly progress reports

26 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

26 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q2.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q243.66%CA ↗ · Arch ↗ · Eng ↗
2025-Q361.79%CA ↗ · Arch ↗ · Eng ↗
2025-Q455.15%CA ↗ · Arch ↗ · Eng ↗
2026-Q167.97%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameKV Developers Private Limited
RolePromoter · current
RERA IDUPRERAPRM7865
PANAAECK9048H
CIN / TANU70102DL2012PTC241987
Name of chairmanMr. Aman Agarwal
Registered addressA-19, Ground Floor, Noida-201301
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
KV DEVELOPERS PRIVATE LIMITED COLLECTION ACCOUNT FOR KVD WINDPARKBankHDFC BANK LIMITEDBranchANSAL ARCADE, SECTOR-18, NOIDABranch addressANSAL ARCADE, SECTOR-18, NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0000088Branch emailescrow@hdfcbank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
KV DEVELOPERS PRIVATE LIMITED SEPARATE ACCOUNT FOR KVD WINDPARKBankHDFC BANK LIMITEDBranchANSAL ARCADE, SECTOR-18, NOIDABranch addressANSAL ARCADE, SECTOR-18, NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0000088
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
KV DEVELOPERS PRIVATE LIMITED TRANSACTION ACCOUNT FOR KVD WINDPARKBankHDFC BANK LIMITEDBranchANSAL ARCADE, SECTOR-18, NOIDABranch addressANSAL ARCADE, SECTOR-18, NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0000088
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
15 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about KVD WINDPARK

Is KVD WINDPARK RERA registered?

Yes. KVD WINDPARK is registered with UPRERA under registration number UPRERAPRJ3122, registered on 28 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for KVD WINDPARK?

The completion date filed with UPRERA is 10 Mar 2029. No completion certificate is on record yet.

Who is the builder of KVD WINDPARK?

KV Developers Private Limited is the promoter entity that filed KVD WINDPARK with UPRERA (promoter RERA ID UPRERAPRM7865). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted KVD WINDPARK more time to complete?

UPRERA's record carries 2 completion extensions for KVD WINDPARK, the latest running to 10 Mar 2029. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does KVD WINDPARK have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is KVD WINDPARK located?

KVD WINDPARK is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in KVD WINDPARK?

The unit plan filed with UPRERA lists 3 BHK, 4 BHK, 2 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in KVD WINDPARK?

The approved unit plan filed with UPRERA runs from 10 to 144 m² of carpet area (about 113 to 1,546 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in KVD WINDPARK?

The approved unit plan describes 8 blocks and 825 units of which 787 are homes and 38 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is KVD WINDPARK?

About 167 units per acre: 825 planned units across 4.94 acres (19,986 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗