Lavanya Enclave is a RERA-registered residential project by Shaurya Constructions in Lucknow (RERA ID UPRERAPRJ580431). Registered with a completion deadline of 7 Apr 2024. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ580431 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 8 Apr 2021 |
| Project duration | 36 months |
| Address | Lucknow, Lucknow |
| Tehsil | Lucknow |
| Applicant type | Partnership Firm |
| Applicant address | E2/68, Shaurya Villa, Anshal Sushant Golf city, Lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
MAP 20181015143554533
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
2 completion certificates filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 30 Nov 2021 |
| Original completion | 7 Apr 2024 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 30 May 2026 |
| Registration fee | ₹49,000 |
| Sanctioning authority | Lucknow Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Plots will be demarcated through numbering on RCC bricks |
| 2 | Boundary Wall NA |
| 3 | Road Work From the main entrance gate, we have 80mm thick damar road throughout the project whose wideness starts 9 mtr. |
| 4 | Footpaths NA |
| 5 | Water Supply Including Drinking Water Facilities We will provide 2 nos of pump from the requirement of blocks through underground pipelines. |
| 6 | Sewer System A modular sewerage system shall be provided. All sewer water shall go to STP and overflow from STP shall go into the municipal sewerage system when comes into force. |
| 7 | Drain Strom water shall be provided. Strom water from roads and other landscape areas shall connect to stormwater drain channel and go to rainwater harvesting pit for recharge the groundwater and overflow shall connect to the municipal drain line. |
| 8 | Parks We will provide green area with different activities and it will have gaming facilities for kids. |
| 9 | Tree Planting We will provide many types of trees all along with the boundary work |
| 10 | Design For Electric Supply Including Street Lighting We will design and implement system as per the local electricity board and will consider centralized transformer, HT/LT panel, Feeder, Pillar, and DG back for common service like external lighting fountain pump room etc. |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water A modular sewerage system shall be provided. All sewerage water shall go to STP and overflow from STP shall connect with the municipal sewerage system when comes to force |
| 13 | Solid Waste Management And Disposal System There are proper garbage collection areas provided for solid waste management |
| 14 | Water Conservation System We will suggest to individuals to use low flow fixtures as well as a dual flush cistern and raw water harvesting system to reduce consumption and improve ground water level. |
| 15 | Energy Management System Including Use of Renewable Energy We will use LED lights fitting in the external area as well as solar lights. In the pump room, all types of equipment have energy-efficient motors. |
| 16 | Fire Protection And Fire Safety System NA |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services NA |
| 19 | Other Miscellaneous Work NA |
Registered agents
1 agent
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | KUSH AGARWAL | UPRERAAGT20078 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 29 Aug 2024.
Sanctioned by Lucknow Development Authority · 8,787 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| MAP 20181015143554533 | 30 Aug 2019 | 29 Aug 2024 | 29 Aug 2027 | 7 Apr 2024 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
14 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 315, 319, 320MI, 321, 366, 367 | 13113 | Khasra |
| Sale deed · 25345 The registered deed by which the promoter bought the land. | PDF ↗ |
| Khatauni extract · 1425-1430 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · 6710 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · Affdavit cum undertaking from shaurya construction An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 25 Oct 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 23 Sept 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 23 Sept 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 23 Sept 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 23 Sept 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 23 Sept 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 26 Oct 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 23 Sept 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 23 Sept 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 23 Sept 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 23 Sept 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 23 Sept 2021 ↗ |
Quarterly progress reports
5 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
5 quarterly progress reports are on file with UPRERA, covering 2021-Q1 to 2022-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Shaurya Constructions |
| Role | Promoter · current |
| RERA ID | UPRERAPRM152573 |
| PAN | ADSFS4025J |
| CIN / TAN | ADSFS4025J |
| Registered address | E2/68, Shaurya Villa, Anshal Sushant Golf city, Lucknow |
| RERA contact | |
| Registered since | 2021 |
| Legal name | BADRIKA MOTORS PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | ANGOORI BUILDING UNIVERSITY ROAD REWA MP 486001 IN |
| RERA contact |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | M/s. Shaurya Constructions RERA Collection Account for Lavanya EnclaveBankIndian BankBranchAhimamahu BranchBranch addressIndian Bank Ahimamahu Branch LucknowBranch districtLucknowA/C no.IFSCIDBI000A532 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | M/s. Shaurya Constructions RERA Separate Account for Lavanya EnclaveBankIndian BankBranchAhimamau BranchBranch addressIndian Bank Ahimamau Branch LucknowBranch districtLucknowA/C no.IFSCIDBI000A532 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | M/s. Sahurya Constructions RERA Transaction Account for Lavanya EnclaveBankIndian BankBranchAhimamau BranchBranch addressIndian Bank Ahimamau Branch LucknowBranch districtLucknowA/C no.IFSCIDBI000A532 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Lavanya Enclave
Is Lavanya Enclave RERA registered?
Yes. Lavanya Enclave is registered with UPRERA under registration number UPRERAPRJ580431, registered on 30 Nov 2021. Estanzo reproduces that filing; it does not verify the work behind it.
Has Lavanya Enclave been completed?
UPRERA still lists Lavanya Enclave as Registered, so it is not shown as completed here. A completion certificate dated 30 May 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Lavanya Enclave?
Shaurya Constructions is the promoter entity that filed Lavanya Enclave with UPRERA (promoter RERA ID UPRERAPRM152573). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Why does Lavanya Enclave show "default on QPR"?
UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.
Does Lavanya Enclave have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Lavanya Enclave located?
Lavanya Enclave is registered in Lucknow, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗