LOTUS BOULEVARD ESPACIA TOWER 31 is a RERA-registered residential project by CLOUD 9 PROJECTS PRIVATE LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ9295). RERA status: Abeyance.
RERA status as reported: Abeyance.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ9295 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | AbeyanceAbeyance“Held in suspension.” UP-RERA lists projects whose registration it has placed in abeyance.Read the full entry in the glossary |
| Proposed start | 10 Aug 2017 |
| Original start | 21 May 2010 |
| Project duration | 83 months |
| Address | Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | TECH BOULEVARD, CENTRAL BLOCK, PLOT NO. 6, SECTOR 127, NOIDA, UTTAR PRADESH- 201301 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 11 Aug 2017 |
| Original completion | 31 Dec 2023 |
| Revised completion | 30 Jun 2024 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹38,500 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
Permits & extensions
0 permits
An approval and the date it runs to - not proof the work matching it was done.
6,679 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Document | File |
|---|---|
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 30 Jun 2024.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 Dec 2023 | 30 Jun 2024 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
4 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| - | - | — |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 17 Jun 2009.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| SN 1409, Book 1, Vol-1596, Pg 265 to 314 | 17 Jun 2009 | self | — |
| Document | Status | Uploaded |
|---|---|---|
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 10 Aug 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 10 Aug 2017 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 26 Oct 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | AS PER SUPPLY |
| Fire safety (as filed with RERA) | YES, SPRINKLERS, FHC |
| Other facilities | CLUB BUILDING AND COMMERCIAL FACILITIES AVAILABLE IN OTHER PARTS OF THE PROJECT |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | CLOUD 9 PROJECTS PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM10431 |
| PAN | AADCC5681P |
| CIN / TAN | U70200DL2009ULT186855 |
| Name of chairman | Mukesh Kumar Rajvanshi |
| Registered address | TECH BOULEVARD, CENTRAL BLOCK, PLOT NO. 6, SECTOR 127, NOIDA, UTTAR PRADESH- 201301 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | CLOUD 9 PROJECTS PRIVATE LIMITEDBankINDUSIND BANK LTD.BranchBARAKHAMBA ROAD, NEW DELHIA/C no.IFSCINDB0000005 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
3 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No sanctioning permit is published for this project.Ask which authority sanctioned the plans, for the permit number, and for the date it is valid to.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
Common questions about LOTUS BOULEVARD ESPACIA TOWER 31
Is LOTUS BOULEVARD ESPACIA TOWER 31 RERA registered?
Yes. LOTUS BOULEVARD ESPACIA TOWER 31 is registered with UPRERA under registration number UPRERAPRJ9295, registered on 11 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for LOTUS BOULEVARD ESPACIA TOWER 31?
The completion date filed with UPRERA is 30 Jun 2024. No completion certificate is on record yet.
Who is the builder of LOTUS BOULEVARD ESPACIA TOWER 31?
CLOUD 9 PROJECTS PRIVATE LIMITED is the promoter entity that filed LOTUS BOULEVARD ESPACIA TOWER 31 with UPRERA (promoter RERA ID UPRERAPRM10431). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted LOTUS BOULEVARD ESPACIA TOWER 31 more time to complete?
UPRERA's record carries 1 completion extension for LOTUS BOULEVARD ESPACIA TOWER 31, the latest running to 30 Jun 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does LOTUS BOULEVARD ESPACIA TOWER 31 have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is LOTUS BOULEVARD ESPACIA TOWER 31 located?
LOTUS BOULEVARD ESPACIA TOWER 31 is registered in Gautam Budh Nagar, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗