Mahagun Mezzaria is a RERA-registered residential project by NEXGEN INFRACON PVT. LTD (MAHAGUN GROUP) in Gautam Budh Nagar (RERA ID UPRERAPRJ3306). Registered with a completion deadline of 28 Sept 2021. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ3306 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Noida Authority |
| Proposed start | 1 Jul 2012 |
| Original start | 1 Jul 2012 |
| Project duration | 111 months |
| Address | Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | B-66, 1st Floor, Vivek Vihar, Delhi, 110095 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Permit revalidated
NOIDA/CTP/2016/III-272/888
2 building permits sanctioned
Registered with RERA
Completion certificate filed
- to
Extension granted
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
- to
Extension granted
Completion certificate filed
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 28 Jul 2017 |
| Original completion | 30 Jun 2019 |
| Revised completion | 28 Sept 2021 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 6 Jun 2019 |
| Registration fee | ₹2,07,500 |
| Sanctioning authority | Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK462 63%
- 4 BHK224 31%
- PENTHOUSE16 2%
- OTHER16 2%
- SHOP12 2%
| Configuration | Units | Carpet area |
|---|---|---|
| 4 BHK | 224 | 136-239 |
| 3 BHK | 462 | 136-165 |
| PENTHOUSE | 16 | 181-354 |
| OTHER | 16 | 216 |
| SHOP | 12 | 74-114 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| T1- CATANIA · 4 BHK, 3 BHK, PENTHOUSE, OTHER | 35 | 122 | 136-354 |
| T2 - MANTOVA · 4 BHK, 3 BHK, PENTHOUSE, OTHER | 38 | 68 | 164-188 |
| T2 - SIENA · 4 BHK, 3 BHK, PENTHOUSE, OTHER | 38 | 68 | 164-188 |
| T3 - MILANO · OTHER, 4 BHK, PENTHOUSE | 38 | 68 | 190-216 |
| T3-OSIMO · OTHER, 4 BHK, PENTHOUSE | 38 | 68 | 191-216 |
| T4-ETERNIA · 4 BHK, PENTHOUSE, OTHER | 38 | 68 | 239-251 |
| T5- VALENCIA · 4 BHK, 3 BHK, PENTHOUSE, OTHER | 35 | 122 | 136-354 |
| T6 - FERRARA · 4 BHK, 3 BHK, PENTHOUSE, SHOP, OTHER | 38 | 146 | 74-354 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots NORTH SIDE- AUTHORITY ROAD, EAST SIDE- RESIDENTIAL SOCIETY, WEST SIDE- SERVICE ROAD, SOUTH SIDE- RESIDENTIAL SOCIETY |
| 2 | Boundary Wall 1. M HIGH BOUNDARY WALL- A COMBINATION OF RCC & M.S. RAILING |
| 3 | Road Work ALL INTERNAL ROADS IN CONCRETE PAVER BLOCKS |
| 4 | Footpaths ALL FOOTPATHS IN SANDSTONE |
| 5 | Water Supply Including Drinking Water Facilities WATER TREATMENT PLANT IS PROVIDED FOR DRINKING WATER |
| 6 | Sewer System SEWER LINE WITH REQUIRED SLOPE AND ADEQUATE MANHOLES |
| 7 | Drain ADEQUATE CATCH BASINS & MANHOLES ARE PROVIDED FOR SURFACE DRAIN |
| 8 | Parks GREEN AREA OF APPROX 50 PERCENT OF LAND AREA IS PROVIDED WITH A MULTIPURPOSE CENTRAL LAWN |
| 9 | Tree Planting A VARIETY OF TREES WITH APPROX 1250 NUMBERS |
| 10 | Design For Electric Supply Including Street Lighting SUFFICIENT LIGHTING AS PER SERVICE & LANDSCAPE CONSULTANT |
| 11 | Community Buildings CLUB IN LOWER BASEMENT |
| 12 | Treatment and Disposal System of Sewage and Sullage water PROVIDED STP BASED ON M.B.B.R. TECHNOLOGY |
| 13 | Solid Waste Management And Disposal System PROVIDED AS PER AUTHORITY NORMS |
| 14 | Water Conservation System RAIN WATER HARVESTING PITS ARE PROVIDED AS PER AUTHORITY NORMS |
| 15 | Energy Management System Including Use of Renewable Energy LED LIGHTS & SOLAR WATER HEATERS ARE PROVIDED AS PER NORMS |
| 16 | Fire Protection And Fire Safety System FIRE SPRINKLERS, SMOKE DETECTORS, FHC WITH PUMPS ARE PROVIDED AS PER NORMS |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services PROPER FACILITY OFFICE, VISITOR CAR PARK, WATER TREATMENT PLANT, STP ARE PROVIDED |
| 18 | Emergency Evacuation Services FIRE STAIRCASE IN EACH BLOCK/ TOWER & NON TOWER ARE IS PROVIDED |
| 19 | Other Miscellaneous Work JOGGING TRACK, CHILDREN PLAY AREA, TENNIS COURT ETC ARE PROVIDED |
Registered agents
6 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | ANAROCK Property Consultants Private Limited | UPRERAAGT10265 |
| 2 | BULLMEN REALTY INDIA PRIVATE LIMITED | UPRERAAGT10138 |
| 3 | FINDMYPROPERTY PRIVATE LIMITED | UPRERAAGT11867 |
| 4 | IA Wealth Private Limited(Formaly Investadvise Wealth Management Private Limited) | UPRERAAGT10048 |
| 5 | INVESTORS CLINIC INFRATECH PRIVATE LIMITED | UPRERAAGT10052 |
| 6 | SQUARE YARDS CONSULTING PRIVATE LIMITED | UPRERAAGT10119 |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 12 Apr 2021. 1 of them carries a revalidation.
Sanctioned by Noida Authority · 40,468 sqm of land · an approved plan of 8 blocks and 730 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| NOIDA/CTP/2016/III-272/888 | 13 Apr 2016 | 12 Apr 2021 | — | 28 Sept 2021 | — | |
| NOIDA/CTP/2016/III-272/888 | 13 Apr 2016 | 12 Apr 2021 | 12 Apr 2024 | 28 Sept 2021 | 13 Apr 2016 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
UPRERA’s record carries 4 completion extensions for this project, the latest running to 28 Sept 2021.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 30 Jun 2019 | 31 Mar 2020 | — |
| 2 | 31 Mar 2020 | 29 Jun 2020 | — |
| 3 | 29 Jun 2020 | 28 Dec 2020 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 4 | 28 Dec 2020 | 28 Sept 2021 | — |
Land & documents
25 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| GH-01/A, SECTOR-78, NOIDA | 40468.50 | Plot |
2 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 4 Jun 2010.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 3915 | 4 Jun 2010 | self | — |
| 3915 | 4 Jun 2010 | self | — |
| Registry document · REGN. No. 3915,BOOK-1, ZILD 2789,PAGE-153-194 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · REGN. No. 3915,BOOK-1, ZILD 2789,PAGE-153-194 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · REGN. No. 3915,BOOK-1, ZILD 2789,PAGE-153-194 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 4 Jul 2018 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 4 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 5 Jun 2018 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 4 Jul 2018 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 5 Jun 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 4 Jul 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 4 Jul 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 4 Jul 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 4 Jul 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 4 Jul 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 4 Jul 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 4 Jul 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 1 Jun 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 12 Jan 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 12 Jan 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 12 Jan 2018 ↗ |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | Old | 12 Jan 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | Old | 12 Jan 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | Old | 12 Jan 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | Old | 12 Jan 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 12 Jan 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 16 Jan 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 16 Jan 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 19 Jan 2018 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | yes |
| Fire safety (as filed with RERA) | yes |
| Renewable energy | Partial |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
7 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
7 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | NEXGEN INFRACON PVT. LTD (MAHAGUN GROUP) |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4983 |
| PAN | AADCN2095A |
| CIN / TAN | U70102DL2010PTC199519 |
| Name of chairman | MR. AMIT JAIN, C-215, VIVEK VIHAR, DELHI-110095 |
| Registered address | B-66, 1st Floor, Vivek Vihar, Delhi, 110095 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | Nexgen-Mezzaria RERA Project ESCROW A/cBankHDFC BankBranchVaishali, GhaziabadA/C no.IFSCHDFC0000422 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.Common questions about Mahagun Mezzaria
Is Mahagun Mezzaria RERA registered?
Yes. Mahagun Mezzaria is registered with UPRERA under registration number UPRERAPRJ3306, registered on 28 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has Mahagun Mezzaria been completed?
UPRERA still lists Mahagun Mezzaria as Registered, so it is not shown as completed here. A completion certificate dated 6 Jun 2019 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Mahagun Mezzaria?
NEXGEN INFRACON PVT. LTD (MAHAGUN GROUP) is the promoter entity that filed Mahagun Mezzaria with UPRERA (promoter RERA ID UPRERAPRM4983). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Why does Mahagun Mezzaria show "default on QPR"?
UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.
Has UPRERA granted Mahagun Mezzaria more time to complete?
UPRERA's record carries 4 completion extensions for Mahagun Mezzaria, the latest running to 28 Sept 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Mahagun Mezzaria have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Mahagun Mezzaria located?
Mahagun Mezzaria is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in Mahagun Mezzaria?
The unit plan filed with UPRERA lists 4 BHK, 3 BHK, PENTHOUSE, OTHER and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in Mahagun Mezzaria?
The approved unit plan filed with UPRERA runs from 74 to 354 m² of carpet area (about 797 to 3,813 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in Mahagun Mezzaria?
The approved unit plan describes 8 blocks and 730 units of which 718 are homes and 12 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Mahagun Mezzaria?
About 73 units per acre: 730 planned units across 10.00 acres (40,468 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗