Mayashree Residency is a RERA-registered residential project by GUPTA CRANES AND STORAGE PVT LTD in Prayagraj (RERA ID UPRERAPRJ7705). Registered with a completion deadline of 31 Mar 2018.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ7705 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Proposed start | 15 Oct 2014 |
| Original start | 22 Oct 2013 |
| Project duration | 42 months |
| Address | Prayagraj |
| Applicant type | Company |
| Applicant address | 400 Gupta Compound, Anjur Phata , Rahnal , BHiwandi -421302 Dist -Thane , Maharashtra |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 2 Aug 2017 |
| Original completion | 31 Mar 2018 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 18 May 2019 |
| Registration fee | ₹32,500 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots COMPLETED |
| 2 | Boundary Wall COMPLETED |
| 3 | Road Work COMPLETED |
| 4 | Footpaths COMPLETED |
| 5 | Water Supply Including Drinking Water Facilities COMPLETED |
| 6 | Sewer System COMPLETED |
| 7 | Drain COMPLETED |
| 8 | Parks AS PER SANTIONED PLAN |
| 9 | Tree Planting AS PER SANTIONED PLAN |
| 10 | Design For Electric Supply Including Street Lighting PROVIDED AS REQUIRED |
| 11 | Community Buildings NOT APPLICABLE |
| 12 | Treatment and Disposal System of Sewage and Sullage water n a |
| 13 | Solid Waste Management And Disposal System n a |
| 14 | Water Conservation System COMPLETED |
| 15 | Energy Management System Including Use of Renewable Energy SOLAR PANELS INSTALLED |
| 16 | Fire Protection And Fire Safety System COMPLETED |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NOT APPLICABLE |
| 18 | Emergency Evacuation Services PROVIDED |
| 19 | Other Miscellaneous Work ALL WORK COMPLETED FOR POSSESSION |
Permits & extensions
0 permits
An approval and the date it runs to - not proof the work matching it was done.
5,444 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Document | File |
|---|---|
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
1 filing
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
Document checklist| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 15 Mar 2019 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | Nagra Nigam Line Available |
| Fire safety (as filed with RERA) | AS Required according to Sanctions |
| Renewable energy | Solar System provided fro common WC |
| Other facilities | Proposed Shiv temple |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | GUPTA CRANES AND STORAGE PVT LTD |
| Role | Promoter · current |
| RERA ID | UPRERAPRM15290 |
| PAN | AABCG0163G |
| CIN / TAN | U99999MH1988PTC047033 |
| Name of chairman | VINAY GUPTA Managing Director |
| Registered address | 400 Gupta Compound, Anjur Phata , Rahnal , BHiwandi -421302 Dist -Thane , Maharashtra |
| RERA contact | |
| Registered since | 2017 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
6 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No project bank account is published for this project.Ask which RERA-designated account payments are to be made to, and check the details against the UP-RERA page before paying anything.
- No registry, lease deed or land-title document is published for this project.Ask to see the registered deed for the plot and how the promoter holds the land - freehold, leased from the development authority, or under an agreement with a landowner.
- No khasra or plot detail is published for this project.Ask which khasra numbers the project stands on, so the plot can be matched against the deed and the revenue record.
- No sanctioning permit is published for this project.Ask which authority sanctioned the plans, for the permit number, and for the date it is valid to.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
Common questions about Mayashree Residency
Is Mayashree Residency RERA registered?
Yes. Mayashree Residency is registered with UPRERA under registration number UPRERAPRJ7705, registered on 2 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has Mayashree Residency been completed?
UPRERA still lists Mayashree Residency as Registered, so it is not shown as completed here. A completion certificate dated 18 May 2019 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Mayashree Residency?
GUPTA CRANES AND STORAGE PVT LTD is the promoter entity that filed Mayashree Residency with UPRERA (promoter RERA ID UPRERAPRM15290). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Where is Mayashree Residency located?
Mayashree Residency is registered in Prayagraj, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗