MAYFLOWER AT THE PRESTIGE CITY

UPRERARegistered

MAYFLOWER AT THE PRESTIGE CITY is a RERA-registered residential project by Prestige Projects Pvt. Ltd. in Village Akbarpur, Behrampur and Mirzapur, Indira Puram Extention, Ghaziabad (RERA ID UPRERAPRJ430385). Registered with a completion deadline of 13 Nov 2029.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
1.84%Q2'25
2.35%Q3'25
2.74%Q4'25
4.97%Q1'26
7.04%Q2'26
—Q3'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ430385
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start1 Jun 2025
Project duration54 months
AddressIndirapuram Extn. - NH-24 Ghaziabad Khasra No. 10(Part), 11, 12, 14, 22(Part), 30P, 31P, 32P, 33P at Village Akbarpur and Behrampur, Khasra No. 164M, 165M, 166P at Village Mirzapur, Village Akbarpur, Behrampur and Mirzapur, Indira Puram Extention, Ghaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant addressPrestige Falcon Tower no. 19, Brunton Road, Bangalore, Karnataka, India, 560025
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    Group Housing/07487/GDA/BP/24-25/0623/28072024

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered16 Jul 2025
Original completion13 Nov 2029
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,39,500
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors636 · 5 · 43 (units from plan)
Homes · commercial units620 · 16 (shops and offices filed in the same plan)
  • 3 BHK336 53%
  • 4 BHK272 43%
  • SHOP16 3%
  • PENTHOUSE12 2%
ConfigurationUnitsCarpet area
4 BHK272144-227
3 BHK336123-130
PENTHOUSE12271-328
SHOP1610-12
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Community Facility Block-3 · SHOP11610-12
Fern Block-1 F1 · 4 BHK, OTHER, 3 BHK, PENTHOUSE43155123-328
Fern Block-1 F2 · 4 BHK, OTHER, 3 BHK, PENTHOUSE43155123-328
Gulmohar Block-2 G1 · 4 BHK, OTHER, 3 BHK, PENTHOUSE43155123-328
Gulmohar Block-2 G2 · 4 BHK, OTHER, 3 BHK, PENTHOUSE43155123-328
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Ar. J. Mamtha
License CA/2005/37087
SF-A, 2nd floor, Prakruthi Royale Appartments, No.6, 13th Main, Ganganagar, Hebbal Post, Bangalore- 560024
Engineer
Er. Vinod Kumar
Registered Office No. 47, 19th A cross, Bhuvneshwari Nagar, Hebbal, Kempapura, Bangalore- 560024, Karnataka India
Contractor
Kalpataru Projects International Limited
Gold tower, 2nd floor, 50, Residency road, Bengaluru, 560025
Sr.Development work declared to RERA
1Demarcation of Plots
Kh. No. 10, 11, 12, 14, 22, 23, 24, 28M, 29P, 30P, 31P, 32P, 33P and 45M Village- Akbarpur and Behrampur, Kh.No. 164M, 165M and 166P Village Mirzapur Ghaziabad.
2Boundary Wall
2.4 Meter high wall as applicable
3Road Work
All roads will be combination of concrete pavers and concrete.
4Footpaths
All footpath in the complex will be in combination of concrete pavers.
5Water Supply Including Drinking Water Facilities
Potable water is sourced through local authority.
6Sewer System
The sewage will be collected Sewage Treatment Plant (STP) of the project and treated water will be used for irrigation and flushing purpose.
7Drain
Drains having a minimum width of 150 mm will be provided for collection and channelization of rain water (surface run off).
8Parks
Landscaping of the parks with plantation including trees, shrubs, ground covers and recreational areas.
9Tree Planting
Landscape development plan prepared for the project includes peripheral and avenue plantation with local species, ornamental as well as large and dense foliage plants.
10Design For Electric Supply Including Street Lighting
The power demand considered and shall be made available and metered by Uttar Pradesh power corporation Ltd Ample road and Street Lighting shall considered.
11Community Buildings
Community area (club) will be developed as per approved plan.
12Treatment and Disposal System of Sewage and Sullage water
Sewage shall be treated in Sewage Treatment plan (STP) and thereafter treated water to be used for flushing and irrigation.
13Solid Waste Management And Disposal System
Solid waste to be collected from individual flats and will be processed in the Organic Waste Convertor on site.
14Water Conservation System
Treated waste water from STP shall be used for Flushing and Landscape/ Irrigation. Rain water harvesting pits shall be provided for ground water recharging.
15Energy Management System Including Use of Renewable Energy
Provision of Energy Efficient Lighting of Common Areas is considered.
16Fire Protection And Fire Safety System
Fire fighting system shall be provided as per Fire NOC.
17Social Infrastructure And Other Public Amenities Including Public Health Services
A Common social interaction areas shall be provided as per approved plan.
18Emergency Evacuation Services
Fire Staircases shall be provided as per the approved fire drawing for evacuation to open areas.
19Other Miscellaneous Work
As per approved plan.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

4 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1BOP REALTY PRIVATE LIMITEDUPRERAAGT10206
2IA Wealth Private Limited(Formaly Investadvise Wealth Management Private Limited)UPRERAAGT10048
3INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
4SQUARE YARDS CONSULTING PRIVATE LIMITEDUPRERAAGT10119
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 13 Nov 2029.

Sanctioned by Ghaziabad Development Authority · 26,858 sqm of land · an approved plan of 5 blocks and 636 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
Group Housing/07487/GDA/BP/24-25/0623/2807202414 Nov 202413 Nov 202913 Nov 203213 Nov 2029
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

16 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
As per attached Land Schedule26857.82Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · Khasra wise Land Schedule
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4806 (Sale Deed Part 1)
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4806 (Sale Deed Part 2)
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4806 (Sale Deed Part 3)
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 2911 (JDA Part 1)
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 2911 (Part 2)
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4537 (Addendum to JDA)
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Affidavit for Arbitral Order
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New10 Jun 2025 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New10 Jun 2025 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New10 Jun 2025 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New10 Jun 2025 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New10 Jun 2025 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New10 Jun 2025 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New10 Jun 2025 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New10 Jun 2025 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New10 Jun 2025 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New10 Jun 2025 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New10 Jun 2025 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New10 Jun 2025 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New10 Jun 2025 ↗

Quarterly progress reports

6 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

6 quarterly progress reports are on file with UPRERA, covering 2025-Q1 to 2026-Q2.

QuarterConstructionCertificates
2025-Q11.84%CA ↗ · Arch ↗ · Eng ↗
2025-Q22.35%CA ↗ · Arch ↗ · Eng ↗
2025-Q32.74%CA ↗ · Arch ↗ · Eng ↗
2025-Q44.97%CA ↗ · Arch ↗ · Eng ↗
2026-Q17.04%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal namePrestige Projects Pvt. Ltd.
RolePromoter · current
RERA IDUPRERAPRM325805
PANAAECP7361E
CIN / TANU45201KA2008PTC046784
Name of chairmanZayd Noaman
Registered addressPrestige Falcon Tower no. 19, Brunton Road, Bangalore, Karnataka, India, 560025
RERA contact
Registered since2024
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameSGS CONSTRUCTION & DEVELOPERS PRIVATE LIMITED
RoleCo-promoter · current
RERA IDUPRERAPRM320581
Applicant typeCompany
PANAAHCS7169Q
CIN / TANU40101DL2001PTC112938
Name of chairmanMr. Venkata Sridevi Swarup Kumar Kurapati
Registered addressR-10, Green Park Main, New Delhi - 110016
RERA contact
Registered since2024

Nearby projects

Ghaziabad

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Prestige Projects Pvt Ltd- Collection AC for Mayflower at The Prestige CityBankICICI BankBranchGhaziabad- Indirapuram BranchBranch addressICICI Bank Ltd. AG-1, Plot No.3, Aditya City Centre, Vaibhav Khand, Indirapuram, Ghaziabad - 201012, UPBranch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0000718Branch emailtxbmgops@icicibank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Prestige Projects Pvt Ltd- Separate Bank AC for Mayflower at The Prestige CityBankICICI BankBranchGhaziabad- Indirapuram BranchBranch addressICICI Bank Ltd. AG-1, Plot No. 3, Aditya City Centre, Vaibhav Khand, Indirapuram, Ghaziabad - 201012 UPBranch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0000718
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Prestige Projects Pvt Ltd- RERA Transaction AC for Mayflower at The Prestige CityBankICICI BankBranchGhaziabad- Indirapuram BranchBranch addressICICI Bank Ltd. AG-1, Plot No. 3, Aditya City Centre, Vaibhav Khand, Indirapuram, Ghaziabad- 201012, UPBranch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0000718
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

3 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
19 Oct 2026
Promoter’s complaints tally (all their projects)12 (Under Registration - 1 ) → 13 (Under Registration - 2 )
changed in Estanzo’s record
9 Oct 2026
Promoter’s complaints tally (all their projects)11 (Under Registration - 0 ) → 12 (Under Registration - 1 )
changed in Estanzo’s record
1 Oct 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 9 Oct 2026 · 2 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about MAYFLOWER AT THE PRESTIGE CITY

Is MAYFLOWER AT THE PRESTIGE CITY RERA registered?

Yes. MAYFLOWER AT THE PRESTIGE CITY is registered with UPRERA under registration number UPRERAPRJ430385, registered on 16 Jul 2025. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for MAYFLOWER AT THE PRESTIGE CITY?

The completion date filed with UPRERA is 13 Nov 2029. No completion certificate is on record yet.

Who is the builder of MAYFLOWER AT THE PRESTIGE CITY?

Prestige Projects Pvt. Ltd. is the promoter entity that filed MAYFLOWER AT THE PRESTIGE CITY with UPRERA (promoter RERA ID UPRERAPRM325805). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does MAYFLOWER AT THE PRESTIGE CITY have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is MAYFLOWER AT THE PRESTIGE CITY located?

MAYFLOWER AT THE PRESTIGE CITY is registered in Village Akbarpur, Behrampur and Mirzapur, Indira Puram Extention, Ghaziabad, as filed with UPRERA.

What configurations are available in MAYFLOWER AT THE PRESTIGE CITY?

The unit plan filed with UPRERA lists 4 BHK, OTHER, 3 BHK, PENTHOUSE and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in MAYFLOWER AT THE PRESTIGE CITY?

The approved unit plan filed with UPRERA runs from 10 to 328 m² of carpet area (about 105 to 3,533 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in MAYFLOWER AT THE PRESTIGE CITY?

The approved unit plan describes 5 blocks and 636 units of which 620 are homes and 16 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is MAYFLOWER AT THE PRESTIGE CITY?

About 96 units per acre: 636 planned units across 6.64 acres (26,858 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗