METRO RESIDENCY

UPRERARegistered

METRO RESIDENCY is a RERA-registered residential project by METRO INFRASTRUCTURES in Meerut (RERA ID UPRERAPRJ13708). Registered with a completion deadline of 16 Dec 2016.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ13708
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryMeerut Development Authority
Proposed start17 Dec 2011
Original start17 Dec 2011
Project duration60 months
AddressSardhana, Meerut
TehsilSardhana
Applicant typePartnership Firm
Applicant addressA-34 SURYA NAGAR NEAR LIC SAKET MEERUT
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    35/2011

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  4. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  5. Registered with RERA

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered22 Oct 2017
Original completion16 Dec 2016
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹41,000
Sanctioning authorityMeerut Development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
SHRI ANKUR BANSAL
License CA/2003/30670
D-110 SAKET MEERUT
Engineer
0
0
Sr.Development work declared to RERA
1Demarcation of Plots
COMPLETED
2Boundary Wall
COMPLETED
3Road Work
COMPLETED
4Footpaths
COMPLETED
5Water Supply Including Drinking Water Facilities
COMPLETED
6Sewer System
COMPLETED
7Drain
COMPLETED
8Parks
COMPLETED
9Tree Planting
COMPLETED
10Design For Electric Supply Including Street Lighting
COMPLETED
11Community Buildings
N.A
12Treatment and Disposal System of Sewage and Sullage water
N.A
13Solid Waste Management And Disposal System
N.A
14Water Conservation System
N.A
15Energy Management System Including Use of Renewable Energy
N.A
16Fire Protection And Fire Safety System
N.A
17Social Infrastructure And Other Public Amenities Including Public Health Services
N.A
18Emergency Evacuation Services
N.A
19Other Miscellaneous Work
N.A
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 16 Dec 2016.

Sanctioned by Meerut Development Authority · 7,150 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
35/201117 Dec 201116 Dec 201616 Dec 201616 Dec 2016
Plans and approvals filed with RERA
DocumentFile
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗

Land & documents

3 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
1600/2,16017142.66 MTR—
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 20 Jul 2011.

Registry no.DateTypeArea
1086720 Jul 2011self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 10867
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New31 Jan 2019 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New31 Jan 2019 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking water0
Fire safety (as filed with RERA)0
Health service0
Renewable energy0
Other facilities0

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameMETRO INFRASTRUCTURES
RolePromoter · current
RERA IDUPRERAPRM28304
PANAARFM5175F
CIN / TANMRTM04313B
Registered addressA-34 SURYA NAGAR NEAR LIC SAKET MEERUT
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Meerut

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
METRO INFRASTRUCTURESBankPUNJAB NATIONAL BANKBranchBEGUM BRIDGEA/C no.IFSCPUNB0369800
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.

Common questions about METRO RESIDENCY

Is METRO RESIDENCY RERA registered?

Yes. METRO RESIDENCY is registered with UPRERA under registration number UPRERAPRJ13708, registered on 22 Oct 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for METRO RESIDENCY?

The completion date filed with UPRERA is 16 Dec 2016. No completion certificate is on record yet.

Who is the builder of METRO RESIDENCY?

METRO INFRASTRUCTURES is the promoter entity that filed METRO RESIDENCY with UPRERA (promoter RERA ID UPRERAPRM28304). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does METRO RESIDENCY have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is METRO RESIDENCY located?

METRO RESIDENCY is registered in Meerut, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗