Mid Point Mart is a RERA-registered commercial project by Shalviya Realtors Private Limited in Ghaziabad (RERA ID UPRERAPRJ893600). Registered with a completion deadline of 22 Dec 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ893600 |
| Project category | Commercial |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 24 Aug 2021 |
| Project duration | 64 months |
| Address | Ghaziabad, Ghaziabad |
| Tehsil | Ghaziabad |
| Applicant type | Company |
| Applicant address | D-132 KRISHNA PARK, DEVLI ROAD DELHI 110030 INDIA |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
2 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
“Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 12 Oct 2021 |
| Original completion | 23 Aug 2026 |
| Revised completion | 22 Dec 2026 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹18,360 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
| Configuration | Units | Carpet area |
|---|---|---|
| SHOP | 62 | 4-24 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| MIDPOINT MART · SHOP | 5 | 62 | 4-24 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Plot No. 7C/Com - 08, Siddharth Vihar, Yojana Ghaziabad. Demarcation as provided by Competent Authority. |
| 2 | Boundary Wall Brick Work boundary wall |
| 3 | Road Work Internal passages of stone/tile finish. |
| 4 | Footpaths N/A |
| 5 | Water Supply Including Drinking Water Facilities Overhead tank for water supply. |
| 6 | Sewer System Underground Tank. |
| 7 | Drain Internal drains consisting of manholes and pipeline connecting to municipal drain. |
| 8 | Parks N/A |
| 9 | Tree Planting As per approved map. |
| 10 | Design For Electric Supply Including Street Lighting LT supply from grid and distribution with suitable switch gear. Street lighting powered by grid power. |
| 11 | Community Buildings Shop shall be provided. |
| 12 | Treatment and Disposal System of Sewage and Sullage water To be discharged into Municipal Sewer |
| 13 | Solid Waste Management And Disposal System Disposal to Municipal Corporation |
| 14 | Water Conservation System Rain Water Harvesting shall be provided as per approved map. |
| 15 | Energy Management System Including Use of Renewable Energy N/A |
| 16 | Fire Protection And Fire Safety System As per NBC and fire department norms. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Shop provided. |
| 18 | Emergency Evacuation Services All fire norms to be followed. |
| 19 | Other Miscellaneous Work N/A |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 23 Aug 2026.
Sanctioned by U.P. Awas Evam Vikas Parishad · 918 sqm of land · an approved plan of 1 block and 62 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| Retail shop/02117/UPAVP/BP/21-22/0314/15072021 | 24 Aug 2021 | 23 Aug 2026 | 22 Aug 2029 | 23 Aug 2026 | |
| Retail shop/02117/UPAVP/BP/21-22/0314/15072021 | 24 Aug 2021 | 23 Aug 2026 | 22 Aug 2029 | 23 Aug 2026 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 22 Dec 2026.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 23 Aug 2026 | 22 Dec 2026 | Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026 |
Land & documents
15 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| Plot No. - 7C/Com-08 | 918.40 | Plot |
| Plot No. - 7C/Com-08 | 918.40 | Plot |
| Registry document · 1381 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · N/A An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 25 Sept 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 7 Sept 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 7 Sept 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 25 Sept 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 7 Sept 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 7 Sept 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 7 Sept 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 7 Sept 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 25 Sept 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 7 Sept 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 7 Sept 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 7 Sept 2021 ↗ |
Quarterly progress reports
20 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
20 quarterly progress reports are on file with UPRERA, covering 2021-Q2 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 124.68% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 124.99% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 124.99% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 125% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Shalviya Realtors Private Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM150043 |
| PAN | AAMCS1041G |
| CIN / TAN | U45200DL2008PTC178715 |
| Name of chairman | Shammi |
| Registered address | D-132 KRISHNA PARK, DEVLI ROAD DELHI 110030 INDIA |
| RERA contact | |
| Registered since | 2021 |
Nearby projects
Ghaziabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | SHALVIYA REALTORS PVT. LTD. - COLLECTION A/CBankAXIS BANK LTD.BranchSECTOR - 62, NOIDABranch addressGROUND FLOOR - OFFICE NO. 1, TOWER A, LOBE - 05, PLOT NO. A-41, THE CORENTHUM - SECTOR 62, NOIDA, 201301Branch districtGautam Buddha NagarA/C no.IFSCUTIB0000723 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | SHALVIYA REALTORS PRIVATE LIMITED - SEPARATE BANK A/CBankAXIS BANK LTD.BranchSECTOR - 62, NOIDABranch addressGROUND FLOOR - OFFICE NO. 1, TOWER A, LOBE - 05, PLOT NO. A-41, THE CORENTHUM - SECTOR 62, NOIDA, 201301Branch districtGautam Buddha NagarA/C no.IFSCUTIB0000723 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | SHALVIYA REALTORS PVT. LTD. - RERA TRANSACTION A/CBankAXIS BANK LTD.BranchSECTOR - 62, NOIDABranch addressGROUND FLOOR - OFFICE NO. 1, TOWER A, LOBE - 05, PLOT NO. A-41,THE CORENTHUM - SECTOR 62, NOIDA, 201301Branch districtGautam Buddha NagarA/C no.IFSCUTIB0000723 |
What has changed on this record
3 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Revised completion date on file | 2026-12-23 → 2026-12-22 changed in Estanzo’s record | 7 Sept 2026 |
| Completion extension no. 1 — extended upto | 2026-12-23 → 2026-12-22 changed in Estanzo’s record | 7 Sept 2026 |
| Revised completion date on file | 2026-08-23 → 2026-12-23 changed in Estanzo’s record | 5 Sept 2026 |
| Revised completion date on file | changed in Estanzo’s record · 7 Sept 2026 · 2 movements on record |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Mid Point Mart
Is Mid Point Mart RERA registered?
Yes. Mid Point Mart is registered with UPRERA under registration number UPRERAPRJ893600, registered on 12 Oct 2021. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Mid Point Mart?
The completion date filed with UPRERA is 22 Dec 2026. No completion certificate is on record yet.
Who is the builder of Mid Point Mart?
Shalviya Realtors Private Limited is the promoter entity that filed Mid Point Mart with UPRERA (promoter RERA ID UPRERAPRM150043). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Mid Point Mart more time to complete?
UPRERA's record carries 1 completion extension for Mid Point Mart, the latest running to 22 Dec 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Mid Point Mart have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Mid Point Mart located?
Mid Point Mart is registered in Ghaziabad, as filed with UPRERA.
What configurations are available in Mid Point Mart?
The unit plan filed with UPRERA lists SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in Mid Point Mart?
The approved unit plan filed with UPRERA runs from 4 to 24 m² of carpet area (about 38 to 257 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in Mid Point Mart?
The approved unit plan describes 1 block and 62 units of which 0 are homes and 62 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Mid Point Mart?
About 273 units per acre: 62 planned units across 0.23 acres (918 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗