Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ6035
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start4 Apr 2015
Original start4 Apr 2015
Project duration117 months
AddressLucknow, Lucknow
TehsilLucknow
Applicant typeProprietorship Firm
Applicant addressK-1164 A Aashiyana Colony Lucknow-226012
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    1286

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. to

    Extension granted

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered31 Jul 2017
Original completion4 Apr 2021
Revised completion31 Dec 2024
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹38,000
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors162 · 2 · 9 (units from plan)
  • 3 BHK108 67%
  • 2 BHK54 33%
ConfigurationUnitsCarpet area
3 BHK10894-101
2 BHK5463-78
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A · 2 BHK, 3 BHK98163-101
B · 3 BHK, 2 BHK98163-101
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Ripunjay Kumar Patel
License CA/2001/28562
D2/122, Vibhuti Khand ,Gomti Nagar,Lucknow.
Engineer
Ashok Gupta
2/127,Vijay Khand,Gomti Nagar,Lucknow
Contractor
Self
14/GH 04 Vrindavan Yojna Lucknow
Sr.Development work declared to RERA
1Demarcation of Plots
Demarcated as 14/GH-04, Vrindavan yojna , Lucknow.
2Boundary Wall
construction in process
3Road Work
18mtr approch road and 6mtr internal roads
4Footpaths
NA
5Water Supply Including Drinking Water Facilities
Underground water through Terrace Tanks/U.G. Tank
6Sewer System
Main Sewer available connected to Township (Vrindavan Yojna-Housing Board)
7Drain
Semi covered Drain System in entire township (Vrindavan yojna)
8Parks
Internal Green areas as per approved layoutand external by housing board
9Tree Planting
Shrubs, Grass & Trees as per layout requirements
10Design For Electric Supply Including Street Lighting
Supply from nearby vrindavan sub-station available. Efficient street light
11Community Buildings
Internal Club with wading pool and external by housing board
12Treatment and Disposal System of Sewage and Sullage water
Township (Vrindavan Yojna- Housing Board) STP available
13Solid Waste Management And Disposal System
Nagar Nigam, Lucknow
14Water Conservation System
Rain water harvesting shall be provided
15Energy Management System Including Use of Renewable Energy
Solar Panels shall be provided on terrace for renewable energy
16Fire Protection And Fire Safety System
Work shall be done as per fire NOC drawing
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
Fire escape in each block
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 22 Jun 2019.

Sanctioned by U.P. Awas Evam Vikas Parishad · 6,530 sqm of land · an approved plan of 2 blocks and 162 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
128620 Jun 201422 Jun 201922 Jun 20214 Apr 2021
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 31 Dec 2024.

#Granted fromExtended uptoNote
14 Apr 20213 Oct 2021Six months extension in view of force majeure caused by covid-19 pandemic
23 Oct 202131 Dec 2024—

Land & documents

13 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 18 Jul 2013.

Registry no.DateTypeArea
1354118 Jul 2013self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 13541
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Allotment letter from the authority · 6215
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · 6215
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Registry document · IN-UP0092818612167T
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New6 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New6 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New6 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New6 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New6 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New6 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New6 Jul 2018 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterAs per norms/maps
Fire safety (as filed with RERA)As per norms/maps
Renewable energyAs per norms/maps
Other facilitiesAs per norms/maps

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

3 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

3 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2020-Q3.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameMangalam Builders and Promotersl
RolePromoter · current
RERA IDUPRERAPRM10804
PANAAWPA3971A
Registered addressK-1164 A Aashiyana Colony Lucknow-226012
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Mangalam Builders and PromotersBankCorporation BankBranchIndira NagarA/C no.IFSCCORP0000567
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No khasra or plot detail is published for this project.Ask which khasra numbers the project stands on, so the plot can be matched against the deed and the revenue record.

Common questions about Neelkanth Dreamz

Is Neelkanth Dreamz RERA registered?

Yes. Neelkanth Dreamz is registered with UPRERA under registration number UPRERAPRJ6035, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Neelkanth Dreamz?

The completion date filed with UPRERA is 31 Dec 2024. No completion certificate is on record yet.

Who is the builder of Neelkanth Dreamz?

Mangalam Builders and Promotersl is the promoter entity that filed Neelkanth Dreamz with UPRERA (promoter RERA ID UPRERAPRM10804). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Neelkanth Dreamz more time to complete?

UPRERA's record carries 2 completion extensions for Neelkanth Dreamz, the latest running to 31 Dec 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Neelkanth Dreamz have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Neelkanth Dreamz located?

Neelkanth Dreamz is registered in Lucknow, as filed with UPRERA.

What configurations are available in Neelkanth Dreamz?

The unit plan filed with UPRERA lists 3 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Neelkanth Dreamz?

The approved unit plan filed with UPRERA runs from 63 to 101 m² of carpet area (about 677 to 1,087 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Neelkanth Dreamz?

The approved unit plan describes 2 blocks and 162 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Neelkanth Dreamz?

About 100 units per acre: 162 planned units across 1.61 acres (6,530 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗