Padma Lok Awas Yojana Prayagraj is a RERA-registered residential project by Prayagraj Development Authority in Kasari masari, Prayagraj (RERA ID UPRERAPRJ197232). Registered with a completion deadline of 16 Jul 2031.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ197232 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Prayagraj(Allahabad) Development Authority |
| Proposed start | 1 Aug 2026 |
| Project duration | 60 months |
| Address | Khasra No. 1292, 1293/1, 1293/2, 1294, 1295/1, 1295/2, Mauja - Kasari Masari Tehsil Sadar Dist. Prayagraj.`, Kasari masari, Allahabad **, Prayagraj |
| Tehsil | Allahabad ** |
| Applicant type | Competent authority |
| Applicant address | Indira Bhawan, Civil Lines, Prayagraj-211001 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
Patrank 500/Pra. Aa. (ta. Ni./ Vi pra. /2026-27 Dinak 17/07/2026)
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 22 Aug 2026 |
| Original completion | 16 Jul 2031 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹54,500 |
| Sanctioning authority | Prayagraj(Allahabad) Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
| Configuration | Units | Carpet area |
|---|---|---|
| 2 BHK | 602 | 39 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| A · OTHER, 2 BHK | 15 | 602 | 39 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Plot is already demarcated. all the development and construction work will be done under the demarcated plot. |
| 2 | Boundary Wall Brick work boundary wall at the height of 2400 mm and total length of boundary waal 541 mt |
| 3 | Road Work 6.00 M Wide Reinforcement Cement concrete pavement with vacuum dewatered concrete is proposed around the building as per sanctioned plan. |
| 4 | Footpaths A footpath with a PCC base,GSB 80 mm thick M-35 paver blocks, and kerb stone edging shall be provided as per the drawings. |
| 5 | Water Supply Including Drinking Water Facilities The water supply system for the building shall be designed to ensure reliable, hygienic, and adequate water availability for fire protection as well as domestic use.
Source & Storage:
• The primary source of water shall be a bore well (tube well).
• Water from the bore well shall be conveyed through suitable pipelines to the Underground Storage Tank (UGT).
• The UGT shall be compartmentalized into Fire Water Tank and Domestic Water Tank as per applicable norms. (661 kld)
Fire Water Priority:
• Water from the bore well shall first be filled into the Fire Water Tank in the UGT to ensure uninterrupted fire-fighting water availability.
• After the fire tank is fully charged, overflow water shall be diverted to the Domestic Water Tank.
Pumping & Distribution:
• Water from the domestic section of the UGT shall be pumped using electrically operated pumps to the Overhead Tank (OHT).
• The pumping system shall include necessary control valves, non-return valves, pressure gauges, and isolation valves.
• Adequate pump capacity shall be provided to maintain required pressure and flow.
Gravity Distribution:
• From the OHT, water shall be supplied through a gravity-based distribution system.
• Vertical risers and horizontal distribution pipelines shall be provided to supply water to all toilets, kitchens, and other domestic points across all floors.
System Design:
• The entire distribution network shall be designed to optimize flow rate, pressure, and water quality.
• All pipelines shall be of approved material and size, suitable for potable water.
• The system shall comply with relevant CPWD / NBC / Local Authority norms. |
| 6 | Sewer System A separate and independent sewerage system shall be provided for the building to ensure safe and hygienic disposal of wastewater.
• All soil, waste, and sewage from toilets, kitchens, and other sanitary fixtures shall be collected through a dedicated sewerage network.
• The sewer lines shall be constructed using R.C.C. pipes, laid at proper gradients to ensure self-cleansing velocity.
• Inspection chambers / manholes of 900 mm internal diameter shall be provided at suitable intervals, junctions, changes in direction, and levels, as per the approved MEP system design and relevant standards.
• The sewerage network shall be designed to prevent leakage, backflow, and odor nuisance.
• All sewer lines shall be properly vented and provided with necessary traps as per plumbing norms.
• The complete sewerage system shall be connected to the proposed Sewage Treatment Plant (STP) for treatment and safe disposal.
• The system shall comply with applicable CPWD / NBC / Local Authority guidelines |
| 7 | Drain A separate storm water drainage system with ground water recharge provision (rainwater harvesting) shall be provided for the site.
• Rainwater from terraces, roofs, paved areas, and open spaces shall be collected through a dedicated storm water drainage network.
• The collected storm water shall be conveyed through properly sized pipelines and drains to rainwater harvesting / ground water recharge structures.
• Adequate filter media and silt traps shall be provided before recharge to prevent choking and contamination.
• Excess storm water, after groundwater recharge, shall be safely discharged into the Municipal storm water drain line as per the approved layout and specified plan.
• The entire system shall be designed to prevent waterlogging and ensure efficient surface runoff management.
• The storm water drainage system shall comply with applicable NBC / CPWD / Local Authority guidelines
. |
| 8 | Parks As per sanctioned plan. |
| 9 | Tree Planting Many types of bushes and tree will be planted. Planted trees and bushes is the part of green area as per sanctioned
plan. |
| 10 | Design For Electric Supply Including Street Lighting There are three transformer of the capacity of 1600KVA, HT panel, LT panel, Feeder Pillar, and DG backup for common services like external lighting and other essential area is proposed as per sanctioned plan, HSD Tank, L.T. Cable line, Feeder pillar, Street lights, will be provided. A 600x600 mm manhole will be provided for the L.T., L.V., and H.T. lines |
| 11 | Community Buildings N/A |
| 12 | Treatment and Disposal System of Sewage and Sullage water A comprehensive system shall be provided for the collection, treatment, and disposal of sewage and sullage water generated from the building.
• All sewage and sullage water from toilets, kitchens, wash areas, and other sanitary fixtures shall be collected through a separate sewerage network.
• The collected wastewater shall be conveyed through R.C.C. sewer lines laid at appropriate gradients to the proposed Sewage Treatment Plant (STP).(350 kld)
• The STP shall be designed to treat sewage to the prescribed standards as per CPCB / SPCB / Local Authority norms.
• Treated effluent from the STP shall be reused for flushing, landscaping, horticulture, and other non-potable purposes, as feasible.
• Excess treated water, if any, shall be safely discharged into the Municipal sewer / drain after meeting the prescribed discharge standards.
• Sludge generated from the STP shall be properly treated, dried, and disposed of through approved agencies.
• The entire treatment and disposal system shall be designed to prevent contamination, odor nuisance, and environmental pollution |
| 13 | Solid Waste Management And Disposal System A systematic Solid Waste Management and Disposal System shall be provided to ensure hygienic handling and environmentally safe disposal of solid waste generated from the premises.
• Solid waste shall be segregated at source into biodegradable (wet waste), non-biodegradable (dry waste), and recyclable waste as per applicable guidelines.
• Separate color-coded bins shall be provided at each floor and common collection points to facilitate effective segregation.
• Segregated waste shall be collected daily and transferred to a designated solid waste collection area within the premises.
• Biodegradable waste shall be processed through composting / organic waste converter (OWC), wherever applicable.
• Recyclable waste shall be stored separately and handed over to authorized recyclers / agencies.
• Non-recyclable and inert waste shall be disposed of through the Municipal solid waste collection system.
• The entire solid waste management system shall comply with Solid Waste Management Rules, 2016 and guidelines issued by the Local Authority |
| 14 | Water Conservation System A comprehensive Water Conservation System shall be implemented to promote efficient use of water and minimize wastage within the premises.
• Low-flow and water-efficient plumbing fixtures such as dual flush WCs, aerated faucets, and sensor-based fixtures shall be provided to reduce water consumption.
• Rainwater harvesting and groundwater recharge systems shall be incorporated to utilize rainwater effectively.
• Treated wastewater from the STP shall be reused for flushing, landscaping, and other non-potable applications.
• Separate plumbing lines shall be provided for potable and recycled water to avoid cross-contamination.
• Water meters shall be installed at suitable locations to monitor and control water usage.
• The overall system shall be designed in compliance with NBC / CPWD / Local Authority guidelines and applicable water conservation norms. |
| 15 | Energy Management System Including Use of Renewable Energy We will use LED lights as well as solar lights in external areas for energy management system and considering Roof Top Solar Power Plant in selective areas as per GRIHA requirement, will use EV Charger’s for 2 & 4 Wheelers. |
| 16 | Fire Protection And Fire Safety System A comprehensive Fire Protection and Fire Safety System shall be provided in the building to ensure early detection, effective fire control, and safe evacuation of occupants.
• The fire protection system shall be designed and installed in accordance with NBC 2016, Part 4, DBR, and applicable Fire Department guidelines.
• An adequate and dedicated fire water storage shall be provided in the Underground Tank, with separate fire compartment.
• A complete firefighting system comprising fire pumps (main pump, jockey pump, and standby pump), risers, down-comers, yard hydrants, landing valves, hose reels, and fire hose cabinets shall be provided as per fire norms.
• Automatic sprinkler system shall be provided in areas as required by fire regulations.
• Fire detection and alarm system including smoke detectors, heat detectors, manual call points, hooters, and fire alarm control panel shall be installed at appropriate locations.
• Portable fire extinguishers of suitable type and capacity shall be provided at all required locations.
• Fire pumps shall be provided with automatic operation and connected to emergency power backup.
• Proper means of escape, emergency lighting, exit signage, and fireman lift (where applicable) shall be provided to ensure safe evacuation.
• The entire system shall be tested, commissioned, and maintained as per Fire Authority requirements |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services N/A |
| 18 | Emergency Evacuation Services The staircase will be provided with emergency exit doors in each floor as per fire department specifications. |
| 19 | Other Miscellaneous Work N/A |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 16 Jul 2031.
Sanctioned by Prayagraj(Allahabad) Development Authority · 9,811 sqm of land · an approved plan of 1 block and 602 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| Patrank 500/Pra. Aa. (ta. Ni./ Vi pra. /2026-27 Dinak 17/07/2026) | 17 Jul 2026 | 16 Jul 2031 | 16 Jul 2034 | 16 Jul 2031 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
24 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 1295/1 | 0.3060 | Khasra |
| 1287Mi | 0.0340 | Khasra |
| 1287/2 | 0.2170 | Khasra |
| 1292Mi | 0.0230 | Khasra |
| 1287/1 | 0.0460 | Khasra |
| 1294 | 0.3770 | Khasra |
| 1293/2 | 0.1480 | Khasra |
| 1292Mi | 0.0230 | Khasra |
| 1293/1 | 0.1480 | Khasra |
| 1292Mi | 0.0230 | Khasra |
| Khatauni extract · Gazat An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1426-1431 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 25 Jul 2026 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 4 Aug 2026 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 1 Aug 2026 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 25 Jul 2026 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 4 Aug 2026 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 4 Aug 2026 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 4 Aug 2026 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 5 Aug 2026 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 25 Jul 2026 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 4 Aug 2026 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 25 Jul 2026 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 3 Aug 2026 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 3 Aug 2026 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 4 Aug 2026 ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Prayagraj Development Authority |
| Role | Promoter · current |
| RERA ID | UPRERAPRM11999 |
| PAN | AAALA0144P |
| CIN / TAN | LKNA05622B |
| Registered address | Indira Bhawan, Civil Lines, Prayagraj-211001 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Prayagraj
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | PDA Collection Account For Padma Lok Awas yojana PrayagrajBankCentral Bank of IndiaBranchAllahabadBranch address29 Mahatma Gandhi MargCivil PrajrajBranch districtPrayagraj, Uttar PradeshA/C no.IFSCCBIN0280183Branch emailcmvara0183@centralbank.co.in |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | PDA Separate Account For Padmalok Awas Yojana PrayagrajBankCentral Bank of IndiaBranchAllahabadBranch address29 Mahatma Gandhi Marg Civil PrayagrajBranch districtPrayagraj, Uttar PradeshA/C no.IFSCCBIN0280183 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | PDA Transaction Account For Padma Lok Awas Yojna PrayagrajBankCentral Bank of indiaBranchAllahabadBranch address29 Mahatma Gandhi Marg Civil Line PrayagrajBranch districtPrayagraj, Uttar PradeshA/C no.IFSCCBIN0280183 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Padma Lok Awas Yojana Prayagraj
Is Padma Lok Awas Yojana Prayagraj RERA registered?
Yes. Padma Lok Awas Yojana Prayagraj is registered with UPRERA under registration number UPRERAPRJ197232, registered on 22 Aug 2026. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Padma Lok Awas Yojana Prayagraj?
The completion date filed with UPRERA is 16 Jul 2031. No completion certificate is on record yet.
Who is the builder of Padma Lok Awas Yojana Prayagraj?
Prayagraj Development Authority is the promoter entity that filed Padma Lok Awas Yojana Prayagraj with UPRERA (promoter RERA ID UPRERAPRM11999). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Padma Lok Awas Yojana Prayagraj have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Padma Lok Awas Yojana Prayagraj located?
Padma Lok Awas Yojana Prayagraj is registered in Kasari masari, Prayagraj, as filed with UPRERA.
What configurations are available in Padma Lok Awas Yojana Prayagraj?
The unit plan filed with UPRERA lists OTHER and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
How many towers and units are planned in Padma Lok Awas Yojana Prayagraj?
The approved unit plan describes 1 block and 602 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Padma Lok Awas Yojana Prayagraj?
About 248 units per acre: 602 planned units across 2.42 acres (9,811 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗