Pardos Okas Enclave is a RERA-registered residential project by Pardos Developers Private Limited in Lucknow (RERA ID UPRERAPRJ223547). Registered with a completion deadline of 31 Dec 2023.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ223547 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 1 Dec 2021 |
| Project duration | 25 months |
| Address | Sarojini Nagar, Lucknow |
| Tehsil | Sarojini Nagar |
| Applicant type | Company |
| Applicant address | Rashtriya Seva Samithi, First Floor, 1, Deen Dayal Upadhyay Marg, Minto Road, Central Delhi, New Delhi, Delhi, India, 110002 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
Plotted development/02269/LDA/LD/21-22/0215/04062021
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 1 Aug 2022 |
| Original completion | 31 Dec 2023 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 2 Jan 2024 |
| Registration fee | ₹1,36,000 |
| Sanctioning authority | Lucknow Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Demarcation of Plots will be done in accordance with the Approved Layout Plan using demarcating stones |
| 2 | Boundary Wall 300 Rmt of Wall with MS Railing - RCC Columns at regular intervals with plinth Beams, Bands and MS Railings
330 Rmt of Wall with Solid Masonry - In-fill walls are of Brick Masonry with Cement Mortar
Wall Surfaces are plastered on both side and finished with Cement based paints
3 Number of MS Gates - Enclave is a gated community and can be approached from 3 entries of 9M Wide |
| 3 | Road Work 4365 Sq. Mt. of Road Surface - All units are approachable by 9.00 M and 7.50M wide Roads with a carriage way of 4.90M minimum
Roads made up of 200mm thick GSB and 150mm thick WMM as sub base and the finishes are with 60mm thick M-35 Grade Pavers duly supported on a 50mm thick Sand Cushion over 75mm thick of DLC |
| 4 | Footpaths 2560 Sq. Mt. of Footpath Areas - Footpaths are made up of 60mm thick approved Pavers duly supported on a 50mm thick Sand Cushion over 150 mm thick Brick Bat. |
| 5 | Water Supply Including Drinking Water Facilities 1160 Rmt of Water Supply - Separate Network for water supply and irrigation laid within the Enclave using HDPE Pipes of adequate sizes
400 Rmt of Irrigation - Connections are being taken from Township Service mains |
| 6 | Sewer System 990 Rmt - Network comprising of Brick Masonry Manholes/Chambers inter-connected with DWC Pipes and culminated with Truck Sewer of the Township |
| 7 | Drain STORM WATER (External Drainage)
840 Rmt - Network comprising of Brick Masonry Manholes/Chambers inter-connected with DWC Pipes and culminated with Trunk Line of the Township.
INTERNAL DRAINAGE
715 Rmt - Network comprising of Brick Masonry Manholes/Chambers inter-connected with DWC Pipes and culminated with Truck Line of the Township |
| 8 | Parks 0.647 Acres - Parks with play areas are being developed.
Parks with jogging/walking tracks, play area for children, outdoor gym, sitting plazas and lawns will be constructed in the Project. |
| 9 | Tree Planting TREES
Around 120 Nos - Trees along the sides of Roads at regular intervals are provided |
| 10 | Design For Electric Supply Including Street Lighting COMPACT SUB STATION
2 Nos CSS; 300 Mt HT Cables - CSS comprising of HT Compartment, Transformers and LT Compartment for Distribution of Electricity
CABLES and FEDER PILLARS
11 Nos of Feeder Pillars; 2500 Rmt of various cables - Distribution cables are laid for different zones within the enclave and controlled with Feeder Pillars
1150 Rmt of HDPE Conduits - Cables from Feeder Pillar to Plots are being laid through HDPE Conduits of suitable diameter
LV Systems
1800 Rmt of HDPE Conduits - Provisions are made with HDPE Conduits of suitable diameter to run the LV Cables whenever required
STREET LIGHTS
39 Poles with sensor based Luminiare -Adequate street lights are provided along the roads
LV Syste |
| 11 | Community Buildings Community Buildings are Not Applicable for this present project. |
| 12 | Treatment and Disposal System of Sewage and Sullage water The network of the development will be linked to the trunk network of Sushant Golf City for this Zone. |
| 13 | Solid Waste Management And Disposal System The House-to-House waste collection in Sushant Golf City is being done by the Promoter of this Hi-Tech City and same will be done by him for this proposed development as this development is an integral part of the Hi-Tech City |
| 14 | Water Conservation System Rainwater Harvesting pits are proposed to be developed in the Project |
| 15 | Energy Management System Including Use of Renewable Energy The present project being a Plotted Development Solar Bollards etc will be installed in the Green Areas. |
| 16 | Fire Protection And Fire Safety System Not Applicable in the present Project as the same is a Plotted Development. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services The present Project is an integral part of Sushant Golf City and all such facilities for the population of this development at township level by the Promoter of Sushant Golf City. |
| 18 | Emergency Evacuation Services Not Applicable in the present Project as the same is a Plotted Development, however, green areas are provided with lawns etc where residents can assemble in the event of any emergency. |
| 19 | Other Miscellaneous Work Not Applicable |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 22 Jun 2026.
Sanctioned by Lucknow Development Authority · 26,146 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| Plotted development/02269/LDA/LD/21-22/0215/04062021 | 23 Jun 2021 | 22 Jun 2026 | 22 Jun 2026 | 31 Dec 2023 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
19 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| GH2 | 26146 | Plot |
| Sale deed · 918 The registered deed by which the promoter bought the land. | PDF ↗ |
| Khatauni extract · 01.07.2017 to 30.06.2023 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Sale deed · 32058 The registered deed by which the promoter bought the land. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 29 Jul 2022 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 11 May 2022 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 11 May 2022 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 11 May 2022 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 11 May 2022 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 11 May 2022 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 11 May 2022 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 11 May 2022 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 11 May 2022 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 16 Jun 2022 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 16 Jun 2022 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 14 Jul 2022 ↗ |
Quarterly progress reports
9 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
9 quarterly progress reports are on file with UPRERA, covering 2021-Q3 to 2023-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Pardos Developers Private Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM164401 |
| PAN | AAKCP1057B |
| CIN / TAN | U45202DL2018PTC339197 |
| Name of chairman | Jassa Chawla |
| Registered address | Rashtriya Seva Samithi, First Floor, 1, Deen Dayal Upadhyay Marg, Minto Road, Central Delhi, New Delhi, Delhi, India, 110002 |
| RERA contact | |
| Registered since | 2022 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Pardos Developers Private Limited - Collection Account for Pardos Okas EnclaveBankKotak Mahindra BankBranchMuzzaffar Nagar, GhusvalBranch addressGround Floor, GF-42, Millanium Place Sushant Golf City, Shaheed Path, Muzzaffar Nagar, Ghusval, Lucknow, UP - 226030Branch districtLucknow, Uttar PradeshA/C no.IFSCKKBK0005209 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Pardos Developers Private Limited - Separate Account for Pardos Okas EnclaveBankKotak Mahindra BankBranchMuzzaffar Nagar, GhusvalBranch addressGround Floor, GF - 42, Millanium Place Sushant Golf City, Shaheed Path, Muzzaffar Nagar, Ghusval, Lucknow, UP - 226030Branch districtLucknow, Uttar PradeshA/C no.IFSCKKBK0005209 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Pardos Developers Pvt Ltd - RERA Transaction Account for Pardos Okas EnclaveBankKotak Mahindra BankBranchMuzzaffar Nagar, GhusvalBranch addressGround Floor, GF-42, Millanium Place Sushant Golf City, Shaheed Path, Muzzaffar Nagar, Ghusval, Lucknow, UP - 226030Branch districtLucknow, Uttar PradeshA/C no.IFSCKKBK0005209 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Pardos Okas Enclave
Is Pardos Okas Enclave RERA registered?
Yes. Pardos Okas Enclave is registered with UPRERA under registration number UPRERAPRJ223547, registered on 1 Aug 2022. Estanzo reproduces that filing; it does not verify the work behind it.
Has Pardos Okas Enclave been completed?
UPRERA still lists Pardos Okas Enclave as Registered, so it is not shown as completed here. A completion certificate dated 2 Jan 2024 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Pardos Okas Enclave?
Pardos Developers Private Limited is the promoter entity that filed Pardos Okas Enclave with UPRERA (promoter RERA ID UPRERAPRM164401). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Pardos Okas Enclave have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Pardos Okas Enclave located?
Pardos Okas Enclave is registered in Lucknow, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗