Parekh Enclave is a RERA-registered mixed project by NIKHIL PAREKH in Saleh Nagar, Sharda Nagar Scheme, Bangla Bazar Road, Lucknow (RERA ID UPRERAPRJ420064). Registered with a completion deadline of 9 Aug 2025.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ420064 |
| Project category | Mixed |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 3 Mar 2022 |
| Project duration | 42 months |
| Address | Plot No. GH-1A, Ratan Khand,, Saleh Nagar, Sharda Nagar Scheme, Bangla Bazar Road, Sarojini Nagar, Lucknow |
| Tehsil | Sarojini Nagar |
| Applicant type | Individual |
| Applicant address | 3A, UPPER WOOD STREET, 6TH FLOOR, KOLKATA-700017 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
LDA/LD/21-22/0748
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 13 May 2026 |
| Original completion | 9 Aug 2025 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹1,30,500 |
| Sanctioning authority | Lucknow Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots The project comprises total 54 plots from the range of 50 Sq Mt to 300 Sq Mt properly demarcated, through their border line by brick work. Total project has 1 no. entry and exit point from Bangla Bazar Road. Project is surrounded on east side by LDA Land, west 45 mtr road, South side Plot no GH1 and north side Abadi. |
| 2 | Boundary Wall Boundary wall is 7.5 Mtr High and 3 side made with 5 inch wide brick work as plastered wall with 1 - 3 -6 cement concrete foundation at one side with Iron Rod and properly structured with thick compounds. Entrance have security Guard Room. |
| 3 | Road Work All internal roads with interlocking with 125 MM GBS and 15 MM, M30 Grade PQC on pavement area including pathway with curb stone as suggested by Architect with approved map and connected with main road. |
| 4 | Footpaths All footpath and internal road have narrow footpath with paver and pavement on pathway with curbstone and according to LDA map, These Road are developed and completed fully. |
| 5 | Water Supply Including Drinking Water Facilities Project have own overhead Water storage tank having height of 25 mtrs. and water supply through boring of tubewell of 300 mtrs depth togather with pump house to ensure adequate 24 hours water supply with purity and quality. This project has plan to supply water at each plot and work fully completed. |
| 6 | Sewer System Proect has underground sewer line at depth 0 to 1.5 MTRS. with 600 MM dia RCC NP-3 hume pipe. There is suffecient capacity of Centralised Sewerage system placed. All Sewerage water flowing from STP of 100 KLPD for treatment . Fully Completed. |
| 7 | Drain Strom water system is provided, Strom water from roads and other land scape area is connected to strom water drain channel and go to the rain water harvesting pit / water colletcion pond for recharge of ground water and overflow is connected with municiple drain line. Drain as mark in sanctioned map Available at each plot and Completed as per Map. |
| 8 | Parks 2452.15 Sq Mt Park area provided with buitification along with green area, Play area for children and different recreation activities as mentioned in approved Map. Park duly demarcated with wall and safe for childrean and old age persons. |
| 9 | Tree Planting The trees category of ornamental, shady, and native species is planted in the entire project open space as per availability of green land area. Tree Planting in park area and in open space fully grown. all well groomed tree are planted now have full grown. |
| 10 | Design For Electric Supply Including Street Lighting POwer illumination and common lighting of all comman area including area allocated to the common services with high street pole and underground cable. For electric supply 11KV double pole structure installed with Light feeder pillar. All electric designs have earthing and lighting conductor. The project is equipped with a transformer of 500 KVA which is 25 excess of required load of project. Electric supply is sent through underground cables that is aluminium conducted PVC insulated armoured serve sheated cable 1100 volt grade at the depth of 750 mm below ground level over a cushion of 75 mm thick sand and available at each plot as per map and fully functioning. |
| 11 | Community Buildings Community Building not available but while formation of RWA it will take care |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP of 100 KLD is installed and working as centralised system and fully functioning as per LDA Norms and working. It is connected with each plot and finally join to centralized system, recycle water is used for gardening, flush tank and washing. |
| 13 | Solid Waste Management And Disposal System Project has waste segregation area along with 2 bin system of dustbin at marked area for collection of segerated. all waste from one point handed over to the government agency of waste collection. |
| 14 | Water Conservation System Project has well designed rain and strom water mangement system with pit and pond at utility area. All rain water of each plot connected with centralised system. |
| 15 | Energy Management System Including Use of Renewable Energy Project have wide open area available sunlight and fresh open air ventilation at each level of plot. For Common area light use LED and STP and pump room all equipement five star energy saver equipement. available. |
| 16 | Fire Protection And Fire Safety System Open area is placed for fire protection and all cable are insulated and have fire proof with ISO norms and motor and other equipments are have fire safety norms. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services As per norms and proper provision |
| 18 | Emergency Evacuation Services As per norms and in green area as spaced in project |
| 19 | Other Miscellaneous Work NA |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 7 Dec 2026.
Sanctioned by Lucknow Development Authority · 16,345 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| LDA/LD/21-22/0748 | 8 Dec 2021 | 7 Dec 2026 | 7 Dec 2026 | 9 Aug 2025 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
28 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| GH-1A | 16345.44 | Plot |
| Sale deed · 38537 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 14410 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 0030018 The registered deed by which the promoter bought the land. | PDF ↗ |
| Registry document · 24264 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2026228011324 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 33 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 34 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 32 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 31 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 167 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 27 Mar 2026 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 18 Feb 2026 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 9 Apr 2026 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 5 Apr 2026 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 29 Dec 2025 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 27 Mar 2026 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 27 Mar 2026 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 27 Mar 2026 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 1 Apr 2026 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 10 Apr 2026 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 9 Apr 2026 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 10 Apr 2026 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 9 Apr 2026 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 10 Feb 2026 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 12 May 2026 ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | NIKHIL PAREKH |
| Role | Promoter · current |
| RERA ID | UPRERAPRM421915 |
| PAN | AKJPP5964B |
| Registered address | 3A, UPPER WOOD STREET, 6TH FLOOR, KOLKATA-700017 |
| RERA contact | |
| Registered since | 2025 |
| Legal name | MEHUL JAYSUKH PAREKH |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | JP RESIDENCY, 1/A, UPPER WOOD STREET, CIRCUS AVENUE, KOLKATA - 700017 |
| RERA contact |
| Legal name | HASMUKH PAREKH |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | 3A, UPPER WOOD STREET, 6TH FLOOR, KOLKATA-700017 |
| RERA contact |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Nikhil Parekh Collection Account for Parekh Enclave A/CBankYes Bank Ltd.BranchGomti NagarBranch addressGround Floor TC 56-BV, Vibhuti Khand, Gomti Nagar, Lucknow, Uttar PradeshBranch districtLucknow, Uttar PradeshA/C no.IFSCYESB0000611Branch emaildlggnescrowservices@yesbank.in |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Nikhil Parekh Separate Bank acc for Parekh Enclave A/CBankYes Bank LtdBranchGomti NagarBranch addressGround Floor TC 56-BV, Vibhuti Khand, Gomti Nagar, Lucknow, Uttar PradeshBranch districtLucknow, Uttar PradeshA/C no.IFSCYESB0000611 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Nikhil Parekh Rera Trans Acc for Parekh Enclave A/cBankYes Bank LtdBranchGomti NagarBranch addressGround Floor TC 56-BV, Vibhuti Khand, Gomti Nagar, Lucknow, Uttar PradeshBranch districtLucknow, Uttar PradeshA/C no.IFSCYESB0000611 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
3 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Parekh Enclave
Is Parekh Enclave RERA registered?
Yes. Parekh Enclave is registered with UPRERA under registration number UPRERAPRJ420064, registered on 13 May 2026. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Parekh Enclave?
The completion date filed with UPRERA is 9 Aug 2025. No completion certificate is on record yet.
Who is the builder of Parekh Enclave?
NIKHIL PAREKH is the promoter entity that filed Parekh Enclave with UPRERA (promoter RERA ID UPRERAPRM421915). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Parekh Enclave have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Parekh Enclave located?
Parekh Enclave is registered in Saleh Nagar, Sharda Nagar Scheme, Bangla Bazar Road, Lucknow, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗