Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ7075
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start1 Jul 2017
Original start16 Jun 2012
Project duration66 months
AddressMeerut, Meerut
TehsilMeerut
Applicant typeCompany
Applicant addressA-161, SECTOR-63, NOIDA
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    1038/11

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered10 Aug 2017
Original completion30 Jun 2022
Revised completion15 Dec 2022
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹38,500
Sanctioning authorityNoida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors104 · 2 · 13 (units from plan)
  • 4 BHK70 67%
  • 3 BHK33 32%
  • PENTHOUSE1 1%
ConfigurationUnitsCarpet area
3 BHK3388-255
4 BHK70128-270
PENTHOUSE1510
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A · 3 BHK, 4 BHK, PENTHOUSE96088-255
B · 4 BHK1344145-270
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
RAJAT BHATTAR
License CA/1994/17794
BEGUM BRIDGE MEERUT
Engineer
KULBHUSHAN MITTAL
CITI CENTRE MEERUT
Contractor
AZAD KHAN
PHASE 1, PALLAVPURAM MEERUT
Sr.Development work declared to RERA
1Demarcation of Plots
Plot boundries already demarcated.
2Boundary Wall
Brick work boundry wall of 8 ft. height all around the periphery already done.
3Road Work
Cobles on road are already done
4Footpaths
Cobles are used for Footpath.
5Water Supply Including Drinking Water Facilities
For water supply, water tanks on roof is already done.
6Sewer System
Under ground system. Feeder pipeline of PVC and final discharge through RCC pipes.
7Drain
Storm water is going to harvesting recharge pits. Excess water if any, will be discharge to authority drain.
8Parks
Park of 1005 Sq. Mtr. Is provided in the township.
9Tree Planting
Plantation of above 300 plants is already done.
10Design For Electric Supply Including Street Lighting
HT line has been taken from UPPVNL converted to LT supply with in house transformers and switching system. Street lights are LED based.
11Community Buildings
TT, Biliards and other kids recreation facilities already provided.
12Treatment and Disposal System of Sewage and Sullage water
Raw sewerage will be processed through STP of 72 KL capacity. Treated water shall be used for flushing, irrigation and cleaning purpose as much as feasiable. Excess water shell be discharge in the authority drain
13Solid Waste Management And Disposal System
Waste shall be manually handle for disposal.
14Water Conservation System
Harvesting recharge pits are used. Treated water shall be used for flusing, irrigation and cleaning purpose as much as fessiable.
15Energy Management System Including Use of Renewable Energy
NA
16Fire Protection And Fire Safety System
Fire hydrant is provided. Fire alarm system, sprinkler and fire extinguisher is provided as required.
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
Fire tender route and refused area is provided. Emergency stairs are provided as approved by fire department.
19Other Miscellaneous Work
Nil as on date.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 16 Jun 2017.

Sanctioned by Noida Authority · 6,700 sqm of land · an approved plan of 2 blocks and 104 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
1038/1116 Jun 201216 Jun 201716 Jun 202216 Jun 2022
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 15 Dec 2022.

#Granted fromExtended uptoNote
130 Jun 202215 Dec 2022—

Land & documents

19 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
496700—
494180Khasra
492520Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

2 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 13 Apr 2010.

Registry no.DateTypeArea
497713 Apr 2010self—
497913 Apr 2013self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 4979
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 4977
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New27 Jan 2020 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New27 Jan 2020 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New27 Jan 2020 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New30 Jun 2020 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New30 Jun 2020 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New30 Jun 2020 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New30 Jun 2020 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New30 Jun 2020 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New6 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New6 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New6 Jul 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old31 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old31 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old31 Jul 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYES
Fire safety (as filed with RERA)YES
Health serviceFIRST AID FACILITY

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

11 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

11 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2022-Q3.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal namePearl Infrasolutions Private Limited
RolePromoter · current
RERA IDUPRERAPRM13411
PANAANCS9429B
CIN / TANU45400UP2009PTC039076
Name of chairmanMohit Verma
Registered addressA-161, SECTOR-63, NOIDA
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
PEARL INFRASOLUTIONS PRIVATE LIMITEDBankUNION BANK OF INDIABranchMEERUT MAINA/C no.IFSCUBIN0530603
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about PEARL RESIDENCY

Is PEARL RESIDENCY RERA registered?

Yes. PEARL RESIDENCY is registered with UPRERA under registration number UPRERAPRJ7075, registered on 10 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for PEARL RESIDENCY?

The completion date filed with UPRERA is 15 Dec 2022. No completion certificate is on record yet.

Who is the builder of PEARL RESIDENCY?

Pearl Infrasolutions Private Limited is the promoter entity that filed PEARL RESIDENCY with UPRERA (promoter RERA ID UPRERAPRM13411). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted PEARL RESIDENCY more time to complete?

UPRERA's record carries 1 completion extension for PEARL RESIDENCY, the latest running to 15 Dec 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does PEARL RESIDENCY have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is PEARL RESIDENCY located?

PEARL RESIDENCY is registered in Meerut, as filed with UPRERA.

What configurations are available in PEARL RESIDENCY?

The unit plan filed with UPRERA lists 3 BHK, 4 BHK and PENTHOUSE. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in PEARL RESIDENCY?

The approved unit plan filed with UPRERA runs from 88 to 510 m² of carpet area (about 944 to 5,487 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in PEARL RESIDENCY?

The approved unit plan describes 2 blocks and 104 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is PEARL RESIDENCY?

About 63 units per acre: 104 planned units across 1.66 acres (6,700 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.